TNR Gold Corp. · TSXV:TNR
TNR Gold — Investor Presentation (September 2018)
31 slides from TNR Gold's investor presentation, September 2018

Slide 1: TNR Gold Corp. Shotgun Gold Project
TNR Gold Corp. Shotgun Gold Project September 2018 TSXV: TNR www.tnrgoldcorp.com

Slide 2: Cautionary Statement Regarding Forward-Looking Information
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION OF TNR GOLD CORP. (“TNR”) Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canad

Slide 3: Cautionary Note to US Investors
CAUTIONARY NOTE TO US INVESTORS Mineral Reserves and Mineral Resources - The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" referred to in the Company's disclosure are Canadian mining terms as defined in accordance with National Instrument 43-101 -Standards of Discl

Slide 4: TNR Gold Corp.
TNR GOLD CORP. “Green Energy Metals Royalty Company” • Project Portfolio Management: – Strategic focus on energy metals, lithium and copper – Precious metals, gold • Proven Business Model: – Early identification and acquisition of projects – Selectively advance projects internally – Employ JV Partne

Slide 5: Management and Directors
MANAGEMENT AND DIRECTORS Directors • Kirill Klip, MBA – Executive Chairman • Maurice Brooks B.Sc., FCA (ICAEW) • John Davies • Greg Johnson B.Sc. • Natalia Lobanova • Ross Thompson Management • Kirill Klip, MBA – President and CEO • Maurice Brooks – Special Adviser Strategic Risk Management and Inte

Slide 6: Corporate Structure Unlocking Value
Corporate Structure Unlocking Value Minera Solitario Argentina Projects Cu-Au International Lithium Corp. TNR GOLD CORP. (TSXV: ILC) Li + Rare Metals TSXV: TNR (TNR holds a Strategic Stake in ILC) AmeriGold Corp. Alaskan Projects Multi-Commodity Au Multi-Jurisdiction Exposure TSXV: TNR www.tnrgoldco

Slide 7: The Shotgun Project Location
The Shotgun Project Location • Located in SW Alaska near Donlin Gold and Pebble • Alaska is rising in terms of policy index according to the Fraser Institute’s “Annual Survey of Mining Companies” Fort Knox • Shotgun could access tide water via barge transport from Dillingham (150km away) to Koligane

Slide 8: The Shotgun Project Exploration History
The Shotgun Project Exploration History • 4 mineralized target areas • Elevation: 200 – 850m 25 km PROSPECT COMPANY COMPLECTION DRILLING Camp YEAR (m) Shotgun Ridge Cominco 1984,88 226 NovaGold 1998 3,107 TNR Gold 2006 762 2012 814 Shot TNR Gold 2005 301 King TNR Gold 2005 145 Winchester TNR Gold 20

Slide 9: The Shotgun Project Located between Donlin Gold and Pebble
The Shotgun Project Located between Donlin Gold and Pebble • Same regional geologic environment as Donlin – Kuskokwim Basin • Intrusive rocks at Shotgun are similar age to widespread magmatic gold mineralization (70 Ma) throughout the basin, including Donlin • Area is underexplored due to poor expos

Slide 10: The Shotgun Project Geology
The Shotgun Project Geology • Predominantly underlain by Cretaceous sediments of the Kuskokwim Group • Granite to syenite intrusive bodies 25 km intruded the Kuskokwim Group • Some of these intrusions appear to be directly related to gold mineralization • North-south oriented string of gold prospect

Slide 11: The Shotgun Project - Mineralization
The Shotgun Project - Mineralization Three examples of multiphase monomictic breccia with strongly silicified and bleached quartz feldspar biotite porphyry from DDH SR06-43. • Shotgun is a multiphase intrusion related gold system associated with 69.7 Ma magmatism, tying Shotgun to a widespread magma

Slide 12: Shotgun Ridge – Mineralized Intervals
Shotgun Ridge – Mineralized Intervals NE-Zone Mid-Zone SW-Zone 22m of 2.86 g/t Au 27.4m of 2.3 g/t Au 18.4m of 2.03 g/t Au • 12-56 returns 242m of 1.25g/t Au over all three mineralized zones • 12-57 returns 209m of 1.02g/t Au over all three mineralized zones • 12-58 returns 46.55m of 1.14 g/t Au (ho

Slide 13: Shotgun Ridge – Drill Holes Plan View
Shotgun Ridge – Drill Holes Plan View A’ Location of x-sect A-A’ in next slide A TSXV: TNR www.tnrgoldcorp.com 13

Slide 14: Shotgun Ridge – Resource Model Cross-Section A-A’
Shotgun Ridge – Resource Model Cross-Section A-A’ A A’ OPEN Mineralization not included in resource estimate. TSXV: TNR www.tnrgoldcorp.com 14

Slide 15: The Shotgun Project – Mineral Resource
The Shotgun Project – Mineral Resource Inferred Mineral Resource, 2013* • 20,734,313 tonnes @ 1.06 g/t Au • 705,960 ounces Au • 0.5 g/t Au cut-off • Mineral resource is located from surface to a depth of 150m • Resource is located on a ridge, forming a topographic high • Mineralization appears to be

Slide 16: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Shotgun Ridge alone shows potential to host multiple, closely spaced gold deposits Geologic map of Shotgun Ridge showing area of drilling and interpreted faults Kuskokwim Sediments • Mineralization hosted in quartz-feldspar-biotite (qfp) porphyry • Breccia

Slide 17: Magnetic image shows ring structure typical of porphyry systems
The Shotgun Project – Understanding Targets Magnetic image shows ‘ring structure’ typical of porphyry systems • Magnetic high associated with metamorphic aureole surrounding porphyry • Structures easily mapped by magnetic lineaments and offsets • Mineralization is located in “magnetic lows” at struc

Slide 18: Mineral resource defined at structural intersections
The Shotgun Project – Understanding Targets Mineral resource is defined at structural intersections disrupting the magnetic ‘ring’ Surface projection of resource model shell • Area of defined resource located at structural intersections • Resource area coincident with magnetic low signature • Multip

Slide 19: Resistivity surveys show NNW-SSE structural features
The Shotgun Project – Understanding Targets Resistivity surveys show NNW-SSE structural features • Resistivity model from 3D survey showing near-surface response • Purple = low resistivity • White = high resistivity • Resistivity reveals qtz-flooded structures associated with mineralization • Higher

Slide 20: Chargeability lows highlight mineralization and untested targets
The Shotgun Project – Understanding Targets Chargeability lows highlight the mineralization and untested targets • Chargeability model from 3D survey showing near-surface response • Blue = low chargeability • Red = high chargeability • Low chargeability response corresponds perfectly with known mine

Slide 21: Outlining the chargeability lows
The Shotgun Project – Understanding Targets Outlining the chargeability lows. Note the spatial limits of the current 3DIP surveys • Chargeability model from 3D survey showing near-surface response • Blue = low chargeability • Red = high chargeability • Low chargeability response corresponds perfectl

Slide 22: Chargeability lows over resistivity highs show quartz flooding
The Shotgun Project – Understanding Targets Chargeability lows over resistivity highs show areas of qtz flooding = mineralization • Chargeability lows coincide with structures mapped by resistivity • Purple = low resistivity • White = high resistivity • Higher conductance structures are untested and

Slide 23: Geology supports the target model
The Shotgun Project – Understanding Targets Geology supports the target model • qfp and breccia are coincident Kuskokwim Sediments with geophysical structural interpretations and zones of low chargeability • Only one of 5 targets is tested to date Breccia • 705,000 oz Au defined in one target with l

Slide 24: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Location of cross section on following slide B A TSXV: TNR www.tnrgoldcorp.com 200 m 24

Slide 25: Mineralization plotted down hole over 3D chargeability model
The Shotgun Project – Understanding Targets Mineralization plotted down hole over 3D chargeability model Note consistency of grade over long intervals A B A B Elevated Au values at end of holes 25 TSXV: TNR www.tnrgoldcorp.com

Slide 26: Shotgun Ridge has untested structural intersections
The Shotgun Project – Understanding Targets Shotgun Ridge has untested structural intersections that may host significant gold deposits B If the IP method is showing mineralization as interpreted, then the potential exists to expand the near-surface mineral resource in close proximity to the existin

Slide 27: The Shotgun Project – Opportunity
The Shotgun Project – Opportunity Camp Scale Opportunity • Shotgun Ridge is just one of multiple gold target areas 25 km • Gold mineralization identified at each prospect: Shot, King, and Winchester • This group of prospects forms a distinct gold district held 90% by TNR • Surface geochemistry ident

Slide 28: Shotgun Zone Resource Estimate: effective date May 27, 2013
Shotgun Zone Resource Estimate: effective date May 27, 2013 The Shotgun Zone mineral resource estimate is based on 34 diamond drill holes (NQ) totaling 4,932.3 metres, with 2,481 assays (0.2 up to 10 metres in length). Holes were drilled by several operators in five drill campaigns conducted between

Slide 29: Shotgun Ridge Inferred Resource Estimate – Au (g/t) cut-off
Shotgun Zone Resource Estimate: effective date May 27, 2013 Shotgun Ridge Inferred Resource Estimate – Au (g/t) cut-off Modeled based on a 0.3 – 0.5 g/t Au cut-off Cut-off Tonnes Grade (g/t) Grams Ozs <0.1 g/t 24,551,029 0.96 23,628,833 759,770 0.1 g/t 24,545,917 0.96 23,628,825 759,769 0.2 g/t 24,5

Slide 30: Contact Us Today
Contact Us Today JV Partnership Financing Accepting Project Submissions Investment in TNR We welcome your inquiries Investor Relations hub http://tnrgoldcorp.com/investors/ IR@tnrgoldcorp.com Phone: +1 604-700-8912 1111 Melville Street, Suite 1100 Fax: +1 604-484-7143 Vancouver, BC, V6E 3V6, www.tnr

Slide 31: More Than Gold – Thank You
“MORE THAN GOLD” Thank You TSXV: TNR www.tnrgoldcorp.com
Source: Internet Archive copy of tnrgoldcorp.com
More decks from TNR Gold Corp.
Proxy Contest (September 2026)19 slides · Sep 22, 2026
Investor Presentation (May 2026)99 slides · May 2026
Investor Presentation (May 2026)55 slides · May 2026
Investor Presentation (December 2024)91 slides · December 2024
Investor Presentation (August 2024)198 slides · August 2024
Investor Presentation (November 2021)56 slides · November 2021