Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — Merrill Lynch Global Metals, Mining & Steel Conference 2017

23 slides from Royal Bafokeng Platinum's conference presentation, May 15, 2017

  1. Slide 1: Merrill Lynch Global Metals, Mining & Steel Conference 2017

    Merrill Lynch Global Metals, Mining & Steel Conference 2017 Barcelona 15 – 18 May

  2. Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward-looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: BRPM JV location relative to neighbouring mines

    BRPM JV location relative to neighbouring mines Merrill Lynch – Global Metals, Mining & Steel Conference 2017 3

  4. Slide 4: RBPlat attributable resources (67%)

    RBPlat attributable resources (67%) Reef Type Resource Classification Mt 4E (g/t) 4E Moz Reef Type Resource Classification Mt 4E (g/t) 4E Moz RBPlat BRPM Measured 51.91 7.50 12.52 Measured 8.58 7.64 2.11 Merensky Indicated 32.30 6.95 7.22 Indicated 3.50 7.11 0.80 Merensky Inferred 19.62 7.70 4.86 In

  5. Slide 5: RBPlat attributable reserves (67%)

    RBPlat attributable reserves (67%) Reef Type Reserve Classification Mt 4E (g/t) 4E Moz Reef Type Reserve Classification Mt 4E (g/t) 4E Moz RBPlat BRPM Proved 38.11 4.63 5.67 Proved 6.74 4.38 0.95 Merensky Merensky Probable 12.98 4.16 1.74 Probable 3.08 4.26 0.42 Total 51.10 4.51 7.41 Total 9.82 4.35

  6. Slide 6: RBPlat Group structure and share price performance

    RBPlat Group structure and share price performance 160 RBPlat share price performance 140 120 Index – rebased to 100 100 80 60 40 20 0 Dec-11 Dec-12 Dec-13 Dec-14 Dec-15 Dec-16 Merrill Lynch – Global Metals, Mining & Steel Conference 2017 Royal Bafokeng Platinum JSE Platinum & Precious Metals 6

  7. Slide 7: Value creation driven by an efficient and effective strategy

    Value creation driven by an efficient and effective strategy > Improved safety performance > BRPM operational flexibility maintained > Ongoing labour and community stability > Completed Phase 1 of modular processing capacity > Operating cost performance not at the level we want to achieve > Toll tre

  8. Slide 8: Sound business strategy delivering consistency in a challenging environment

    Sound business strategy delivering consistency in a challenging environment LTIFR: Our journey to zero harm Royalty income 1.20 PGM operating environment 80 1.00 > Depressed commodity market 70 0.80 60 /200,000 hrs > Complex labour and community relations 50 R'million 0.60 40 75 0.40 1.00 0.90 0.68

  9. Slide 9: Improved profitability reflected by a 204% increase in headline earnings in 2016

    R’million -250 -150 50 -50 150 250 350 450 Headline loss − 2015 (159.6) Revenue − volume increase and increase in net finance income 6.3 Merrill Lynch – Global Metals, Mining & Steel Conference 2017 Movement in inventory and decreased volumes 73.0 Decrease in depreciation and amortisation 231.7 cont

  10. Slide 10: Strong cash balance available to fund future growth

    R’million 1 000 1 200 1 400 1 600 1 800 2 000 0 200 400 600 800 Cash and cash equivalents - 1 January 326.1 591.5 2016 917.6 Cash generated by operations 528.8 Interest, dividends and tax Merrill Lynch – Global Metals, Mining & Steel Conference 2017 56.5 906.4 Cash generated from Stydrift Incidental

  11. Slide 11: RBPlat well positioned to continue to grow as planned

    RBPlat well positioned to continue to grow as planned ˃ Average Rand basket price increased by 10% in 2016 due mainly to a weaker R:US$ exchange rate resulting in improved profitability ˃ 74% of the R1.1 billion capital expenditure at end of 2016 funded from cash generated by operations and Styldrif

  12. Slide 12: The RBPlat safety strategy − zero harm through resilience

    The RBPlat safety strategy − zero harm through resilience Key initiatives to progress to resilience: Behaviour and leadership Behavioural safety culture progression > Leadership training programmes > Culture based behavioural safety − 4th Wave > Emotional fitness training Our strategy: > Align volum

  13. Slide 13: Q1 2017 Operating results overview

    Q1 2017 Operating results overview Description Unit Q1 2017 Q1 2016 Var Injury frequency rates 0.80 1.20 Safety 0.68 1.12 1.11 0.70 1.00 SIFR (/200 000 hrs) rate 0.26 0.05 -420.0% 0.60 0.49 LTIFR 0.80 SIFR LTIFR (/200 000 hrs) rate 0.58 0.25 -132.0% 0.50 0.45 0.67 0.69 0.56 0.58 0.40 0.35 0.36 0.60

  14. Slide 14: Bottom quartile producer – BRPM lowest cost conventional mine

    Bottom quartile producer – BRPM lowest cost conventional mine Merrill Lynch – Global Metals, Mining & Steel Conference 2017 14

  15. Slide 15: Our response to a challenging PGM pricing environment

    Our response to a challenging PGM pricing environment RBPlat / BRPM JV ˃ Capital deferment ˃ Styldrift expenditure “self funding” ˃ Rescheduling and restructuring of mining activities – maximise Merensky production ˃ Operational improvement initiatives • Cost saving/reduction • Improving efficiencie

  16. Slide 16: Styldrift I – a brief history

    Styldrift I – a brief history…. 2009 2010 2011 2012 2013 2014 2015 2016 • Site establishment • Bulk earthworks • Pre-sink completed • Shaft sinking on- • Sinking progressed • Surface & U/G ore • Sinking contract • Completed 250ktpm and commenced completed April going to 708L on Main handling termina

  17. Slide 17: Styldrift I - 150ktpm ramp-up strategy

    Styldrift I - 150ktpm ramp-up strategy Two phase Styldrift ramp-up Surface Infrastructure: ˃ Phase 1 = 150ktpm − Q4 2018 ˃ Complete 250ktpm concentrator upgrade – “Dry scope” ˃ Phase I capex = R4.75 billion from Q3 2016 • ROM ore silo • Crusher and mill silo feed conveyors ˃ Overland belt to BRPM co

  18. Slide 18: Styldrift I 600 level project progress … the road to 150ktpm

    Styldrift I 600 level project progress … the road to 150ktpm Services shaft Legend Main shaft Development completed end 2016 TM3 Workshops Shaft infrastructure development still to be completed Ancillary workshops: Refuelling Tyre bays Wash bays Merrill Lynch – Global Metals, Mining & Steel Conferen

  19. Slide 19: Styldrift two phase ramp-up − 600 level production infrastructure

    Styldrift two phase ramp-up − 600 level production infrastructure 600 level − Production infrastructure 150ktpm Infrastructure ˃ 12 equipped stoping sections • 8 operational stoping sections and fleet • 4 IMS sections TM3 stores Services Vent # ˃ 20 trackless workshops Underground consumable shaft T

  20. Slide 20: Styldrift two phase ramp-up − 642 and 708 level ore handling infrastructure

    Styldrift two phase ramp-up − 642 and 708 level ore handling infrastructure 642 level − Ore handling infrastructure Legend Shaft infrastruc ture footprint Services shaft Development 2017 Main shaft Development 2018 Development 2019 150ktpm equipped sec tions 230ktpm equipped sec tions Twin declines

  21. Slide 21: 150ktpm Production profile

    150ktpm Production profile Styldrift delivered tonnes ˃ Capital cost of R4.75 billion 3 000 ˃ Ramp-up to 150ktpm over 2.5 years reaching 150ktpm Q4 – 2018 2 500 ˃ Lower capital requirement in current market environment 2 000 ˃ 230ktpm Phase II ramp-up market dependent 1 500 kt • 100ktpm concentrator

  22. Slide 22: BRPM JV Production profile

    BRPM JV Production profile BRPM JV production plan Merensky contribution 3.5 100% 90% 3.0 80% 2.5 70% % Contribution 60% 2.0 50% Mt 1.5 40% 1.0 30% 20% 0.5 10% 0.0 0% 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 UG2 Merensky Styldrift 1 Merensky North Shaft Merensky North Shaft UG2 South Shaft

  23. Slide 23: Royal Bafokeng Platinum: an attractive investment proposition

    Royal Bafokeng Platinum : an attractive investment proposition Lower political risk Black-owned and controlled - exceeds all statutory BEE requirements Lower labour risk Employees and owners are aligned – long term wage agreements Long-life assets Long-life Merensky producer Excellent growth Low ris

Royal Bafokeng Platinum — Merrill Lynch Global Metals, Mining & Steel Conference 2017 on 6ix