Platauro Metals Corp. · TSXV:PURO
Platauro Metals — Mexican Gold — Investor Presentation (August 2020)
25 slides from Platauro Metals's investor presentation, August 2020
Slide 1: TSX-V: MEX OTC: MEXGF FRA : 4QW1
TSX-V: MEX OTC: MEXGF FRA : 4QW1
Slide 2: Disclosure Statement
Disclosure Statement This presentation includes certain information that may constitute “forward-looking information” under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about the estimation of mineral resources, anticipated advan
Slide 3: The company now
The company now ̥̥ Advancing the El Dorado and Santa Cruz deposits at the Las Minas project through to a Preliminary Economic Assessment (PEA) ̥̥ The El Dorado and Santa Cruz deposits hold an Indicated resource 645,000 oz AuEq at 3.67 g/t AuEq and an Inferred resource of 217,000 oz AuEq at 2.68 g/t
Slide 4: Experienced Board
Experienced boarD Philip O’Neill John Anderson Jay Sujir Ali Zamani CEO and Director Chairman Director Director ̥̥ Experienced mining ̥̥ Over 20 years ̥̥ Partner in Farris Law’s ̥̥ Managing Partner at executive and corporate experience in the Mining and Securities Overlook Investments director capit
Slide 5: Experienced Team
Experienced Team Michael Kanevsky Shaun Drake Matt Liard Sonny Bernales CFO Corporate VP Exploration Senior Geologist Secretary and PM ̥̥ CFO of several private ̥̥ Founder of DSA ̥̥ Over 30 years of ̥̥ Over 35 years of mining companies Corporate Services experience on 4 experience working on contine
Slide 6: The El Dorado and Santa Cruz Deposits: Road to a PEA
THE EL DORADO AND SANTA CRUZ DEPOSITS ROAD TO A PRELIMINARY ECONOMIC ASSESSMENT (PEA) TSX.V: MEX |6 MEX - TSX.V | 06
Slide 7: Advancing the Project Today – To PEA
ADVANCING CONTACT IN WORK THE PROJECT SIGNED PROGRESS COMPLETE Resource Expansion Drilling 2020: +3000m drilling TODAY – TO PEA planned, will commence H2 2020. Resource Conversion Drilling: Upgrading tonnage from the Inferred to Indicated category will de-risk the Initiatives are in progress resourc
Slide 8: Las Minas resource: expansion in progress
Las minas resource: expansion in Indicated Resources: 5,457,000 t @ 3.67 g/t Au Equivalent = 645,000 oz Au Eq progress Inferred Resources: From the most recent NI 43-101 2,514,000 t @ 2.68 g/t Au Equivalent = 217,000 oz Au Eq technical report (MDA 2019), using a 1.5 g/t Au equivalent cut-off grade,
Slide 9: El Dorado Zone Expansion Drilling: 2020 H1
EL DORADO ZONE EXPANSION NORTH EAST SECTOR DRILLING: 2020 H1 WEST SECTOR ̥̥ This plan view of the El Dorado Zone shows the phase 1 expansion drilling areas. ̥̥ The El Dorado Zone is flat-lying and 900m SOUTH is open to the north (limited) and fully EAST N SECTOR open to the east and west. ̥̥ Success
Slide 10: Dike Contact Zone Expansion Drilling: 2020 H1
DIKE CONTACT ZONE EXPANSION DRILLING: TOPO SURFACE 2020 H1 SANTA CRUZ ZONE SOUTH DC NORTH DC The steeply-dipping, high-grade Dike Contact Zone requires infill and N expansion drilling. EL DORADO ZONE PLANNED 2020 EL DORADO & SANTA LOWER DC EXPANSION DRILING CRUZ BLOCK MODEL 900m TSX.V: MEX | 10
Slide 11: Jurisdiction, infrastructure, power
Jurisdiction, infrastructure, power Las Minas check, Check, check ̥̥ Mexican Gold Corp. owns 100% of the Las Minas Project in Veracruz, Mexico ̥̥ Las Minas is a historic mining town where locals are supportive of the project ̥̥ 16km from a high-speed toll highway and rail corridor ̥̥ 15 MW hydroelec
Slide 12: Las Minas: Low Cost Development, Mining, and Processing
LAS MINAS: LOW COST DEVELOPMENT, MINING, AND PROCESSING ̥̥ The El Dorado, Dike Contact, and the Santa Cruz deposits all come to surface directly on or within 100m of a paved road, a development situation very favourable for Capex and for rapid payback time. ̥̥ The diorite dike that bisects the El Do
Slide 13: Ease of Mining Access to Deposits
EASE OF MINING ACCESS TO DEPOSITS Cross Section of the El Dorado Deposit shows Mining Potential DIORITE PAVED DIKE The El Dorado deposit surfaces within metres of a paved road. ROAD El Dorado East and EDC Minimal development time and capital needed to access the El Dorado and WDC deposit for mining.
Slide 14: Las Minas Mineral Processing: Low Costs, High Recoveries, Clean Tailings
LAS MINAS MINERAL PROCESSING: LOW COSTS, HIGH RECOVERIES, CLEAN TAILINGS ̥̥ Preliminary metallurgical locked-cycle test work returned very high metal recoveries using flotation only. ̥̥ Recoveries were 88.8% of gold, 95.4% of copper and 84.2% of silver. These numbers should rise with fine-tuning of
Slide 15: Cinco Senores and Changarro: Road to Exploration Success
CINCO SENORES AND CHANGARRO ROAD TO EXPLORATION SUCCESS TSX.V: MEX | 15
Slide 16: Las Minas is in the Eastern Trans-Mexican Volcanic Belt
LAS MINAS IS IN The Eastern Ixtaca Zone El Cobre Caballo Blanco Trans-Mexican (Almaden Minerals) (Azucar Minerals) (Candelaria Mining) Intermediate Sulphidation Porphyry Cu-Au High Sulphidation Volcanic Belt Epithermal Au-Ag and 534.9m of 0.9g/t Au, Epithermal Au-Ag Porphyry Au Indications 0.3% Cu 5
Slide 17: Immediate exploration plans
Immediate exploration plans 2 Primary Exploration Drill Targets ALL NEW DISCOVERIES FROM 2019/20 Cinco Senores CS13 Vein 1 A high-grade, Au-bearing, quartz vein encountered in drilling in late 2019 will be followed up La Perdida Mines, Changarro Zone 2 Continuous high-grade gold in multiple, newly r
Slide 18: Exploration Drill Targets: Summer 2020
EXPLORATION DRILL TARGETS: LM-19-CS-13 SUMMER 2020 Changarro Historic Mining Zone ̥̥ Map shows the location of the Cinco Senores upcoming drill targets in relation to the Las Minas mineral resources. La Perdida Las Minas Mines ̥̥ New targets discovered in late 2019 and early 2020 will be drilled in
Slide 19: Cinco Senores CS13 Vein
DDH LM-19-CS-13 Cinco senores ‘cs13’ VEIN Drill Hole LM-19-CS-13 ̥̥ Drilled in November 2019 to test a geophysical anomaly ̥̥ High-grade, flat-lying quartz vein intercept may be part of a conjugate vein system ̥̥ Follow-up drilling in H2 – 2020 will attempt to LEVEL OF DEEPEST determine the vein ori
Slide 20: Cinco Senores Las Minillas long section
LAS MINILLAS T E M A N O M A LY CINO SENORES T E M A N O M A LY (OFF SECTION) RIO MINAS RIO F A U LT T E N E S PA N O YA F A U LT ELDORADO SILL CINCO SENORES U P P E R C O N TAC T ZONE MINERALIZED ELDORADO INTERSECTIONS ZONE RESOURCE Cinco ̥̥ Mineralization at Las Minas is controlled by the El Dorad
Slide 21: Changarro Zone West: The La Perdida Mines
CHANGARRO ZONE WEST: THE LA PERDIDA MINES MINES REDSCOVERED FEB 2020 NOT YET SAMPLED 13.94 g/t Au on 8m of strike A NEW DRILL TARGET AT CHANGARRO ̥̥ Sampling in late 2019 in a newly rediscovered and 8.83 g/t Au on 52m of strink rehabilitated mine in the west Changarro Zone yielded excellent results
Slide 22: Appendix
A P P E N D I X TSX.V: MEX | 22
Slide 23: Capital Structure
Capital Structure SHARES OUTSTANDING WARRANTS 103,341,758 64,571,633 3,489,833 @ $0.60 (Apr 10, 2021) MAJOR SHAREHOLDERS 10,671,300 @ $0.30 (Nov 22, 2021) 410,500 @ $0.30 (Mar 13, 2022) * 50,000,000 @ $0.12 (Jul 15, 2024) OPTIONS 5,804,000 61% 39% 4,150,000 @ $0.105 (Jul 17, 2024) 650,000 @ $0.125 (
Slide 24: Resource estimate El Dorado and Santa Cruz
resource estimate Cutoff Grade: 1.5 g AuEg/t Category g AuEq/t g Au/t Cu % g Ag/t Tonnes Au Eq Ounces el dorado and Las Minas Indicated 3.674 1.782 1.250 6.5 5,457,000 645,000 santa cruz (El Dorado and Santa Cruz) Las Minas Inferred 2.679 1.252 0.938 5.5 2,514,000 217,000 (El Dorado and Santa Cruz)
Slide 25: Philip O'Neill contact
Philip O’Neill i nf o @ m ex i ca ng o l d . c a w w w. m ex i ca ng o l d . c a