Dno Asa Class A · OSL:DNO

Dno Asa Class A — DNO International — Investor Day (2008)

21 slides from Dno Asa Class A's investor day presentation, 2008

  1. Slide 1: The Kurdistan Region of Iraq

    DNO INTERNATIONAL ASA THE KURDISTAN REGION OF IRAQ

  2. Slide 2: The New Frontier: A Region with High Potential

    THE NEW FRONTIER A REGION WITH HIGH POTENTIAL • Attractive • Kurdistan is unexplored relative to the rest of Iraq • Highly prospective area combined with early entry opportunity at a low cost on trend with very large fields including Kirkuk • Iraq has numerous undeveloped large fields and unexplored

  3. Slide 3: DNO in Kurdistan: First in Iraq

    DNO IN KURDISTAN FIRST IN IRAQ • DNO was the first foreign company to explore for oil in Iraq for decades • We have a strong and competent organization divided between Kurdistan, Dubai, and Oslo • Excellent cooperation with Kurdistan Regional Government • Production facilities capable of delivering

  4. Slide 4: Infrastructure in Iraq

    INFRASTRUCTURE IN IRAQ ESTABLISHED OIL EXPORT ROUTES Mosul IRAQ • Iraq has 6,960 kilometers network of KIRKUK International boundary Oil pipeline pipelines Kirkuk Oil • Two major pipelines are installed from Beiji Gas Tanker terminal (near Kirkuk) to Ceyhan coastal terminal in Bayji Pump station Ref

  5. Slide 5: Companies in Kurdistan

    COMPANIES IN KURDISTAN Company name # of Blocks Aspect energy 1 Crescent 1 Perenco DNO Dana Gas 1 Hillwood DNO 3 Open DNO Aspect Open Gulf Key Stone 1 Gulf Key Stone Heritage 1 Hunt Oil MOL Reliance Open Hillwood 1 Open Reliance Open Open Hunt Oil 3 TNK-BP DNO Open OMV Open KEPCO 5 TNK-BP TNK-BP KNO

  6. Slide 6: Gross Daily Production from Tawke

    GROSS DAILY PRODUCTION FROM TAWKE BARRELS OF OIL PER DAY 15 000 13 500 2007 AVERAGE PRODUCTION: 5 645 BOPD 2008 AVERAGE PRODUCTION: 7 278 BOPD 12 000 10 500 9 000 7 500 6 000 4 500 3 000 2007 2008 1 500 0 17 June 2007 Februar 2008 CAPITAL MARKETS DAY 2008 │ 6

  7. Slide 7: Reserve Development in Kurdistan

    RESERVE DEVELOPMENT IN KURDISTAN REVISED ESTIMATES FOR TAWKE • Based on latest data available and initial results from reservoir modeling: • Oil In Place is ranging from 0.9-1.9 billion barrels with a current best estimate of 1.3 billion barrels • Gross recoverable reserves is ranging from 150-370 m

  8. Slide 8: Producing Oil in Kurdistan

    PRODUCING OIL IN KURDISTAN

  9. Slide 9: The Tawke Project: Overview

    THE TAWKE PROJECT: OVERVIEW OIL FLARE GAS WATER WELL FLUID 2 X 10,000 bbls SEPARATOR - 2 stages CRUDE OIL TANKS 10,000 bopd WELL LOADING CAPACITY PUMP WATER INJECTION TANK (FUTURE) TAWKE FIELD PIPELINE TIE-IN AREA 45 km 12” EXPORT PIPELINE 50,000 bopd 2 X 70,000 bbls FISCAL METER TANKS 350,000 bopd

  10. Slide 10: Tawke: Central Processing Facility

    TAWKE: CENTRAL PROCESSING FACILITY Tawke Central Processing Facility Area Central Processing Facility CAPITAL MARKETS DAY 2008 │ 10

  11. Slide 11: Tawke: Central Processing Facility

    TAWKE: CENTRAL PROCESSING FACILITY Tawke flare Tawke CPF crude storage tanks CAPITAL MARKETS DAY 2008 │ 11

  12. Slide 12: Operations on Tawke: Pipeline

    OPERATIONS ON TAWKE: PIPELINE Pipelines at the Tawke Field CAPITAL MARKETS DAY 2008 │ 12

  13. Slide 13: Operations on Tawke: Tie-in Area

    OPERATIONS ON TAWKE: TIE-IN AREA Existing export line and fiscal metering station at tie-in area in Fishkhabour CAPITAL MARKETS DAY 2008 │ 13

  14. Slide 14: Exploring the Potential

    BEXBIORING THE POTENTIAL -~

  15. Slide 15: Exploration in Kurdistan

    EXPLORATION IN KURDISTAN Sindy-1 Rig GWDC Rig CAPITAL MARKETS DAY 2008 │ 15

  16. Slide 16: The Tawke PSC: Overview

    THE TAWKE PSC: OVERVIEW “RING-FENCED” TAWKE OIL FIELD: • The license cover 406 km 2 • Two producing horizons DEVELOPMENT/APPRAISAL WORK • To date DNO has performed a 3D seismic campaign of 200 km2 and a 2D seismic campaign of 81 km • 10 development wells have been drilled, as well as an water inject

  17. Slide 17: The Dohuk PSC: Overview

    THE DOHUK PSC: OVERVIEW REVISED DOHUK PSC • PSC Agreement Area: 1,652 km 2 Dihok West • Tawke field is ‘ring-fenced’ and defined Dihok Central as a separate PSC EXPLORATION WORK Linava • More than 475 km of 2D seismic have been acquired since 2005 Bare Bahar • Two exploration wells Sariyah • The Kha

  18. Slide 18: The Erbil PSC: Overview

    THE ERBIL PSC: OVERVIEW AGREEMENT AREA • PSC Agreement Area: 313 km 2 EXPLORATION WORK • DNO have acquired 133 km of 2D seismic since 2005 Hawler-1 • Hawler #1 exploration well has been drilled Bastora and is currently being tested • In the lower horizon the well has tested 9,000 bopd and 11MM scf/d

  19. Slide 19: Closing Remarks

    CLOSING REMARKS

  20. Slide 20: Summary

    SUMMARY A MASSIVE OPERATION • Two original PSAs reviewed by KRG and finalized as three PSCs in compliance with the Regional Petroleum Law • Tawke Field Development finished awaiting export tie-in to existing pipeline infrastructure – 50,000 bopd design capacity • Tawke oil being sold to the Iraqi do

  21. Slide 21: Disclaimer: Forward Looking Statement

    DISCLAIMER: FORWARD LOOKING STATEMENT This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, est

DNO International — Investor Day (2008) on 6ix