Lunnon Metals Limited · ASX:LM8

Lunnon Metals — Noosa Mining Conference 2025

18 slides from Lunnon Metals's conference presentation, Nov 14, 2025

  1. Slide 1: Noosa Mining Conference Presentation

    ASX ANNOUNCEMENT ASX ANNOUNCEMENT 14 November 2025 NOOSA MINING CONFERENCE PRESENTATION For personal use only In accordance with Lunnon Metals Limited’s (ASX: LM8) Shareholder Communications Policy, enclosed is a copy of the Presentation which will be delivered by Managing Director, Edmund Ainscough

  2. Slide 2: St Ives springboard for growth

    ST IVES  This slide is 100% editable. For personal use only Adapt it to your needs and Acapture springboard your audience’s for growth… attention.  This slide is 100% editable. NOOSA MINING Adapt it to your needs and capture your audience’s attention. ASX : LM8 CONFERENCE Edmund Ainscough

  3. Slide 3: Important Notice & Disclaimer

    IMPORTANT NOTICE & DISCLAIMER This Presentation has been prepared by employees of Lunnon Metals Ltd (“Lunnon”, “LM8” or “the Company”) on its behalf and is a summary only, and contains summary information about Lunnon and its activities, which is current as at the date of this Presentation (unless o

  4. Slide 4: Foster-Baker: at the heart of the great St Ives Gold camp

    Foster-Baker: at the heart of the great St Ives Gold camp KAMBALDA Boulder-Lefroy Fault Zone BETA-HUNT • St Ives – over 16Moz* produced (WGX) since early 1980s For personal use only INTREPIDE GREATER REVENGE • Corridor approx. 32km x 7km • Bounded by Boulder-Lefroy and N INVINCIBLE Speedway Faults V

  5. Slide 5: Lunnon Metals Overview

    LUNNON METALS OVERVIEW Corporate structure (ASX:LM8) 14 NOVEMBER 2025 only Liam Twigger Edmund Ainscough Non-Executive Chair Managing Director 223.3m $0.29 ~$65m Board Shares on issue Share price Market cap (close 12/11/2025) For personal use Ashley McDonald Deborah Lord Non-Executive Director Non-E

  6. Slide 6: The Pride of St Ives – Gold Fields' Invincible

    The Pride of St Ives – Gold Fields’ Invincible KAMBALDA 4.5km!! For personal use only Source: www.goldfields.com/pdf/2025-diggers-and-dealers.pdf Invincible is located on Gold Fields Ltd’s tenure at St Ives 5 * Images sourced from Gold Fields Ltd’s website www.goldfields.com and are of the Invincibl

  7. Slide 7: Foster-Baker Gold Discovery Program

    Foster-Baker Gold Discovery Program • Field of view hosts > 7Moz^ of past gold production on Gold Fields’ tenure For personal use only • LM8 Gold program commenced Q1 2024, drilled to date: • 29.5 km RC (523 holes) • 5.0 km DD (25 holes) • 4.2 km Aircore (108 holes) • Discovered Lady Herial (29koz*

  8. Slide 8: Lady Herial Scoping Study – 320kt @ 1.8g/t Au

    Lady Herial Scoping Study# – 320kt @ 1.8g/t Au Robust Operating Free Cash Flow (A$M pre-tax) NEXT STEPS For personal use only 4,500 5,000 5,500 6,000 6,500 7,000 Complete technical studies – confirm 70% 26.1 31.3 36.5 41.7 46.9 52.1 financial benefits and physicals Sensitivity to A$ Gold Price (hori

  9. Slide 9: Ore Purchase Agreement with SIGMC

    Ore Purchase Agreement with SIGMC1 SCOPING STUDY: 0.30-0.32 million tonnes @ ~1.8 g/t Au for ~18,000 ounces2 For personal use only KEY TERMS AGREED CONDITONS PRECEDENT Sell mined material >0.5g/t Au to SIGMC Approval of LM8 shareholders at EGM (completed) Final grade control model, mine design and s

  10. Slide 10: Discovery to Scoping Study <14 months

    Discovery to Scoping Study <14 months UPPER • 7m @ 34.38g/t Au (LDH25RC_325 from 5m) including 4m @ 59.28g/t Au (>1.0g/t Au) For personal use only • 26m @ 6.37g/t Au (LDH25RC_160 from 9m) including 8m @ 9.90g/t Au & 10m @ 8.22g/t Au (>1.0g/t Au) • 14m @ 18.07g/t Au (LDH25RC_164 from 20m) including 2

  11. Slide 11: Plentiful adds to the size and scale of opportunities

    Plentiful ~ adds to the size and scale of opportunities on Lunnon Metals’ tenure * see LM8 ASX announcement dated 30 September 2025 for full results and relevant Annexures 10m @ 1.23g/t Au (PBS25RC_030 from 33m) 24m @ 0.74g/t Au (PBS25RC_032 from 49m) 2025 18m @ 0.84g/t Au (PBS25RC_034 from 48m) For

  12. Slide 12: Kambalda – home of high-grade Nickel Sulphides

    Kambalda – home of high-grade Nickel Sulphides NICKEL MINERAL RESOURCE: Baker 1Mt @ 3.3% Ni for 33,700t metal1 Foster 2Mt @ 2.9% Ni for 58,400t metal1 For personal use only BHP – NICKEL WEST LUNNON METALS Owns the Kambalda Nickel Concentrator High-grade, high-quality, low deleterious Kambalda Nickel

  13. Slide 13: In the heart of the great St Ives Gold camp

    In the heart of the great St Ives Gold camp KAMBALDA SUCCESSFUL EXPLORER WORLD CLASS ADDRESS BETA-HUNT GOLD & NICKEL ST IVES 16Moz* for GOLD (WGX) For personal use only INTREPIDE KAMBALDA 1.6Mt* for NICKEL WESTERN AUSTRALIA __________________ GREATER REVENGE __________________ STRONG CASH N 10% of o

  14. Slide 14: St Ives for Gold: Kambalda for Nickel

    For personal use only ST IVES FOR GOLD : KAMBALDA FOR NICKEL 13

  15. Slide 15: Appendices

     This slide is 100% editable. For personal use only Adapt it to your needs and capture your audience’s attention.  This slide is 100% editable. Appendices Adapt it to your needs and capture your audience’s attention. 14

  16. Slide 16: Competent Persons Statements

    COMPETENT PERSONS STATEMENTS Mr. Aaron Wehrle is the Company’s principal Competent Person and takes overall responsibility for any information in this report that relates to gold and nickel geology, or informed gold and nickel Mineral Resources, Exploration Targets, Exploration Results and the Compa

  17. Slide 17: Gold Mineral Resources Reporting

    GOLD MINERAL RESOURCES REPORTING This presentation contains references to Lunnon Metals’ Mineral Resources, which are shown in a detailed breakdown in the following slides. Gold Mineral Resources* at 30 June 2025 (>0.5g/t Au cut-off) For personal use only * total s may not add up exactl y due to rou

  18. Slide 18: Nickel Mineral Resources Reporting

    NICKEL MINERAL RESOURCES REPORTING This presentation contains references to Lunnon Metals’ nickel Mineral Resources, which are shown in a detailed breakdown below. Mineral Resources * at 30 June 2025 (>1.0% Ni cut-off) For personal use only The Company confirms that, all material assumptions and tec

Lunnon Metals — Noosa Mining Conference 2025 on 6ix