Bravada Gold Corporation · TSXV:BVA
Bravada Gold — Investor Presentation (August 2010)
16 slides from Bravada Gold's investor presentation, August 2010
Slide 1: Corporate Presentation August 2010
CORPORATE PRESENTATION RBRAVADA BVA: TSX.V | 6BG: F August 2010 GOLD CORPORATION
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation includes certain statements that may be deemed “forward‐ looking statements”. All statements in this presentation, other than statements off hi historical i l ffacts, that h address dd exploration l i d drilling, illi exploitation l i i activities i i i a
Slide 3: Battle Mountain-Eureka Gold Trend
Battle Mountain‐Eureka Gold Trend NSR North N th NSR South
Slide 4: Battle Mountain-Eureka Gold Trend Highlights
Battle Mountain‐Eureka Gold Trend Highlights of Trend • 38.2 MM oz Production and contained Resource • 32.4 MM oz. Discovered since 1991 Recent discoveries • Pipeline (23MM oz.) • Cortez Hills (8.5 MM) • Pediment (1.2 MM) • ET Blue • Crossroads (1.1 MM) • Deep Cortez Hills UU.G. G (+4MM) • Red Hills
Slide 5: Battle Mountain Eureka Program
Battle Mountain Eureka Program • 13 Projects • 1,107 clms (~9,000 hc. or 35 sq sq. mi mi.)) • Drill permits in place for Signal, PH West, PH East, Temple,l Gabel, b l NoLM, & SF NSR • Barite lease in 2009 for Shoshone Pediment w// Baker Hughes • New project – ‘NSR’ from Agnico Eagle • Other submitta
Slide 6: Signal Project
Signal Project Section 3 – Looking N30W Small satellite Au deposits are common around large Carlin systems Planned 2nd hole Drill hole SI10‐001C Began June 2010 Section 2 – Looking N10W N N Drill hole SI10-001C j Section 1 – Looking N25W j j
Slide 7: Signal Project
Signal Project Looking East New Barrick Barrick’s Ruby Hill Discovery Open pit Mine Open-pit Bravada’s Signal drilling
Slide 8: PH Project
PH Project ~1Km to US Gold’s Gold s Tonkin Favorable Springs Lower Plate Deposits Carbonate host rocks (+1.5MM oz Au) Surface ggrab samples to Miranda’s Red Canyon Ice 3.39g/t Au w/ Drilling Zone – recent ‘Carlin’ planned pathfinders summer 2010 confirmation core holes w/ significant shallow +3g/t A
Slide 9: SF Project
SF Project Drill ill h hole l w// Carlin‐ li style altered dikes, 0.5g/t g Au intercepts p Drillinggp planned a ed late summer or f ll 2010 fall
Slide 10: Gabel and Temple Projects
Gabel and Temple Projects Drill sites permitted and bonded, no drilling planned 2010
Slide 11: Shoshone Pediment & NoLM Projects
Shoshone Pediment & NoLM Projects Barite open pit Baker Hughes leased barite rights, with Drill sites permitted and bonded, possible drilling 2010 no drilling planned 2010
Slide 12: NSR Property
NSR Property NSR North Granite Mtn prroperty NSR South NSR & Granite Mtn projects are ‘building block’ land positions in one of the world’s great gold districts
Slide 13: 2010 Plans
2010 Plans • Initial Drill Test – Signal • Initial Drill Test – PH • Initial Drill Test – SF • Evaluate any drill results from Baker Hughes barite drillingg • Possible JV’s on other permitted/bonded p j projects • Acquire additional favorable ground in Cortez district alongg BM‐E Gold trend
Slide 14: Directors
Directors • Lawrence Page, Q.C. – Chairman, Director & Officer • Joseph Kizis – President, Director & Officer • Paul Dircksen – Director • Ross R M McDonald D ld ‐ Director Di t • John R. Kerr ‐ Director • Scott Hean – Director
Slide 15: Share Info
Share Info • Shares outstanding – 31.6 million • Fully diluted – 37.3 million • Year Range – $0.14 $0 14 ‐ $0.32 $0 32 • Cash on Hand ‐ $1.5 million • Principal Shareholder: Bravo Gold Corp – 44%
Slide 16: Contact Information
Contact Information Liana Shahinian Director of Investor Relations T: 604 604.641.2773 641 2773 E: liana@mnxltd.com www.bravadagold.com