  1. Slide 1: Investor Presentation Third Quarter 2026

    Investor Presentation Third Quarter 2026 November 12, 2026 NASDAQ / LSE: FRMI

  2. Slide 2: Disclaimers

    Disclaimers Forward-Looking Statements This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. All statements that do not relate to matters of historical fact should be considered forward-looking statements, including, without

  3. Slide 3: Fermi America: Where AI Gets Power

    Fermi America: Where AI Gets Power Premier Competitive private power campus offering rapid speed to power Scale At ~8,400 acres, one of the largest advanced energy and data sites Power Strategy built for resilience and designed to scale to 17GW long-term Permitted 6GW federal air permit secured; app

  4. Slide 4: Fermi by the Numbers: Private Grid with Top-Tier Power Generation Assets

    Fermi by the Numbers: Private Grid with Top-Tier Power Generation Assets Land Natural Gas ~8,400 >15 MM 5 220K MMBtu/d Acres Acquired, Under Major Pipelines Firm Supply Secured Sq. Ft. of Data Center Space Contract, or Under Option Available within 20 Miles Power 4 2.2 GW Up to 17 GW Turbine Platfor

  5. Slide 5: How Fermi Stays Ahead of the Competition

    How Fermi Stays Ahead of the Competition At a time when many data center developments are stalling, Project Matador is moving forward and attracting a robust pipeline of top-tier, investment grade customers Industry Challenges • ERCOT froze new large-load connections • Behind-the-meter power on a pr

  6. Slide 6: Business Model & Strategy

    Business Model & Strategy

  7. Slide 7: The Campus | Land Once, Scale to Gigawatts

    OUR PLACE IN THE MARKET The Campus | Land Once, Scale to Gigawatts Product: private power plus land to expand on. What we solve: a place to grow over many years and multiple gigawatts Air permit PROJECT MATADOR · ~8,400 ACRES ✓ ~6 GW clean air permit granted (TCEQ) Natural Gas Expands Expands Expand

  8. Slide 8: Power First. Three Ways to Monetize It.

    OVERVIEW Power First. Three Ways to Monetize It. One power platform, a menu of products for customers; we start where capital needs are lowest POWER One private power plant on Project Matador: turbines, gas, BESS and substation. It enables all three models below. OUR FOCUS POWERED LAND+ POWERED SHEL

  9. Slide 9: Who Does What | Fermi Scope vs. Customer Scope

    OUR BUSINESS MODEL Who Does What | Fermi Scope vs. Customer Scope Fermi has three offerings; we choose by stage and by customer NOT OFFERED BY FERMI FERMI’S THREE OFFERINGS OUR FOCUS POWERED LAND POWERED LAND+ POWERED SHELL TURNKEY Power Landlord Fermi Fermi Fermi Site Tenant Fermi Fermi Fermi Water

  10. Slide 10: How We Make Money | Two Revenue Streams, One Triple-Net Lease

    OUR BUSINESS MODEL How We Make Money | Two Revenue Streams, One Triple-Net Lease WE SELL POWER WE LEASE REAL ESTATE $ per kW of Gross Power $ per kW of IT capacity $ Capacity charge Base rent FIXED FIXED · ESCALATING · TAKE-OR-PAY Return on and of capital, O&M to deliver FIXED · ESCALATING · TAKE-OR

  11. Slide 11: Cost and Revenue | Turnkey: ~3x the Capital for ~2.4x the Revenue

    RECENT MARKET DEALS ECONOMICS GROSS POWER BASIS Cost and Revenue | Turnkey: ~3× the Capital for ~2.4× the Revenue Per MW of gross power (total facility): total range on top of each bar Market Rates – July 2024 to mid-October 2026 Cost to build, $M per MW of gross power Fixed charges, $ per kW of gro

  12. Slide 12: Illustrative Value Creation | 1 GW of Gross Power

    GROSS POWER BASIS Illustrative Value Creation | 1 GW of Gross Power NOI ÷ cap rate = enterprise value; − debt = equity value. Per GW of gross power, IG hyperscaler, 6.0% cap rate Values are illustrative asset-level estimates based on market rates (see pg. 11), not forecasts of revenue, NOI, enterpri

  13. Slide 13: The Fermi Cube | Powered Land+: More Return, Less Risk

    OUR BUSINESS MODEL GROSS POWER BASIS The Fermi Cube | Powered Land+: More Return, Less Risk Bubble area to scale with capex; illustrative capex range per MW of gross power below each bubble Illustrative Return ↑ High Why Powered Land+ fits today OUR FOCUS About 1/3 of Turnkey’s capital: $3.9–5.1M pe

  14. Slide 14: Project Matador Progress

    Project Matador Progress

  15. Slide 15: Advancing the Buildout at Project Matador

    Advancing the Buildout at Project Matador 5 Gas turbines on site 4.6 Miles of natural gas lines 11.3 Miles of fencing 7.2 Miles of water lines ~13.1 Million Sq. Feet (300 Acres) prepared Note: Stats shown are as of October 31, 2026 Draft – Pending Finalization 15

  16. Slide 16: Fermi Power Fleet on the Move

    Fermi Power Fleet on the Move Onsite In transit GE 6Bs ALL ONSITE SGT-800s 8 IN TRANSIT F-Class 1 IN TRANSIT 100% 6 of 6 units onsite Fleet delivered 33% 4 of 12 units onsite +1 steam turbine onsite 83% 5 of 6 units onsite 1 turbine en route ONSITE ONSITE ONSITE Turbines 3/3 Turbines 0/6 Turbines 2/

  17. Slide 17: A Diversified Generation Portfolio Designed to Deliver

    A Diversified Generation Portfolio Designed to Deliver Early Power, Sustained Hyperscale Loads, and Optimized Long-Term Economics Asset GE Vernova FR6B Siemens SGT-800 GE TM2500 SGT6-5000F Status • All three turbines and • 4 generators on site • In Houston(1) • Two turbines on site generators are on

  18. Slide 18: Fermi Power Pipeline

    Fermi Power Pipeline 600 MW Reserved for 2027 by Major Hyperscaler Fermi Turbines Owned Utility Power Contracted 2027 Maximum Power 2,000 MW 200 MW 925 MW Natural gas generation Xcel power under ESA Generation turbines and other equipment if all contracted Capacity Available for Delivery (MW) Scale:

  19. Slide 19: Financials

    Financials

  20. Slide 20: Q3 2026 Financial Summary

    Q3 2026 Financial Summary Balance Sheet $1.67B $316M Total PP&E, Net $958M Cash and Restricted Cash Invested $133M into Debt, Net1 PP&E in the Quarter Income and Cash Flow2 $0.22 $142M $55M Net Loss per Share Total G&A Expense Included Non-Cash Share-based Cash Used in Operations Net Loss of $142M C

  21. Slide 21: Access to Liquidity: $1.2B of Commitments

    Access to Liquidity: $1.2B of Commitments Turbine Warehouse • Funding for three Siemens F-class gas turbine units • A portion of proceeds were used to pay-off the term loan with Macquarie $500M • • Daily Simple SOFR plus 4.0% per annum ~$445M outstanding as of September 30, 2026 EQUIPMENT High Volta

  22. Slide 22: Key Investment Highlights

    Key Investment Highlights One of the World’s Largest Advanced Energy and AI Campus Sites One of the most significant infrastructure assets providing essential power to support AI-driven demand Experienced and Respected Leadership Team Executive team includes a blend of respected industry veterans wi

  23. Slide 23: Appendix

    Appendix

  24. Slide 24: Fermi 2.0: Experienced and Respected Leadership Team

    Fermi 2.0: Experienced and Respected Leadership Team Decades of experience in energy development, power generation, project management, and project finance • Founding Partner of BayPine, which was formed in May 2020 Marius Haas • Extensive technology experience at Dell Technologies, Hewlett-Packard,

  25. Slide 25: Summary of Convertible Senior Notes & Capped Call Terms

    Summary of Convertible Senior Notes & Capped Call Terms Base Note Terms Capped Call Terms Aggregate Size $431.25 million Cap Price $14.64 per share 5.00% per annum Coupon Effective Premium 100% to the Reference Price (payable semi-annually) Maturity July 15, 2031 (~5 years) Upfront Cost ~$34.5 milli

  26. Slide 26: Hillcore BOOT Strategic Framework Agreement

    Hillcore “BOOT” Strategic Framework Agreement Build-own-operate-transfer partnership framework accelerates Fermi’s speed to power advantage with an additional 2.6 GW and no additional capital or debt Up to ~2.6 GW ~4.8 GW ~360 MW $0 Power capacity Total on-site generation First Hillcore power target

  27. Slide 27: Site Overview | 17 GW Advanced Energy & AI Campus

    SITE OVERVIEW | 17 GW Advanced Energy & AI Campus | ~8,400 Acres, One of the Largest Sites of its Kind in the World 27

  28. Slide 28: Superior Positioning with Surrounding Water and Natural Gas Access

    Superior Positioning with Surrounding Water and Natural Gas Access 28

  29. Slide 29: Natural Gas Infrastructure

    Gas Pipelines Natural Gas Infrastructure Project Matador sits on the intersection of major pipelines with significant natural gas infrastructure. Firm delivery of clean natural gas at gigawatt scale. Gas Pipeline Arrival Gas Pipeline Installation 29

  30. Slide 30: Superior Access to Extensive, Redundant Fiber Networks

    Superior Access to Extensive, Redundant Fiber Networks Reno, NV Chicago, IL Denver, CO ~23.18ms ~8.3ms Las Vegas, NV ~20.28ms ~18.54ms Albuquerque, NM ~5.60ms Oklahoma City, OK ~5.02ms ~15.84ms Phoenix, AZ Site Location ~7.14ms Amarillo, TX Dallas, TX 30

  31. Slide 31: Glossary

    Glossary Term Definition GW Gigawatt kW Kilowatt kW-mo Kilowatt month M Million MMBtu/d Million British Thermal Units per Day ms Milliseconds MW Megawatt N/A Not Applicable NOI Net Operating Income NTP Notice to Proceed OEM Original Equipment Manufacturer RTD Round-Trip Delay Sq Ft Square Feet TCEQ

  32. Slide 32: Investor Relations

    Investor Relations Rodrigo Acuna IR@fermiamerica.com 1845 Woodall Rodgers Freeway, Suite 1100 Dallas, TX 75201-2239 www.fermiamerica.com