Adavale Resources Limited · ASX:ADD

Adavale Resources — Investor Presentation (May 2025)

16 slides from Adavale Resources's investor presentation, May 7, 2025

  1. Slide 1: Targeting Gold and Copper in the Tier-1 Lachlan Fold Belt, NSW

    Targeting Gold and Copper in the Tier-1 Lachlan Fold Belt, NSW INVESTOR PRESENTATION ASX: ADD May 2025

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer ASX: ADD This presentation has been prepared by Adavale Resources Ltd (ASX:ADD).This presentation contains background information about ADD current at the date of this presentation. The presentation is in summary form, has not been independently verified and does not pu

  3. Slide 3: Parkes Project - Investment Highlights

    Parkes Project - Investment Highlights ASX: ADD 1 Transformational Acquisition ● All-Scrip Acquisition of the Parkes Project at $900k. Same vendor as the Spur project for Waratah Minerals (ASX:WTM). ● A Total Area of 354.15 km² spanning Four (4) Exploration Licences (EL’s) – including the licence wi

  4. Slide 4: "Giants Working with Juniors" in the Lachlan Fold Belt

    “Giants Working with Juniors” in the Lachlan Fold Belt ASX: ADD Over $300M in Exploration Earn-ins/JVs with Junior Explorer ● AngloGold up to A$145m earn-in deal with Inflection Resources ● AngloGold up to A$110m earn-in deal with Kincora ● FMG up to A$14m earn-in deal in the Junee-Narromine, incl f

  5. Slide 5: London-Victoria Maiden JORC (EL7242)

    London-Victoria Maiden JORC (EL7242) ASX: ADD London-Victoria (EL7242) ● Located 20km South of Northparkes Mine (ASX:EVN). ● Historic London-Victoria Gold Mine: ○ Produced c.155koz Au via open-pit mining at ~2g/t along 1.6km of strike, with higher-grade lodes, up until 1998. ○ Operators include BHP

  6. Slide 6: London-Victoria Mine (EL7242) Resource extension potential

    London-Victoria Mine (EL7242) Resource extension potential ASX: ADD High grade mineralisation at depth 1 Broader mineralisation outside of conceptual pit Infill potential 2 Delineation of exploration target now underway With further historic 3 information, a considerable proportion could be converte

  7. Slide 7: Front Gate (EL8831) Ashes & Myalls Prospects – Early Work Completed

    Front Gate (EL8831) Ashes & Myalls Prospects – Early Work Completed ASX: ADD High-priority copper-gold targets have been identified at EL8831 (located ~12km East of Northparkes Mine). Advancing Swiftly at Ashes & Myalls Prospects ● Land Access Secured Full access now in place across both prospects.

  8. Slide 8: Ashes & Myalls Prospects – Confirmed High Grade Au, Cu & Ag Rock Chips

    Ashes & Myalls Prospects – Confirmed High Grade Au, Cu & Ag Rock Chips ASX: ADD Adavale Resources’ Assays (Feb 2025) ● 10.65 g/t Au, 1.98% Cu & 158 g/t Ag (P24669) ● 7.95 g/t Au, 2.2% Cu & 96.4 g/t Ag (P24654) ● 0.74 g/t Au, 0.76% Cu & 58.9 g/t Ag (P24651) Historic High-Grade Rock Chips ● 8.8g/t Au

  9. Slide 9: Ashes & Myalls Prospects – Rock Chip Sampling & Grid-based Geochemical Survey

    Ashes & Myalls Prospects – Rock Chip Sampling & Grid-based Geochemical Survey ASX: ADD Systematic and swift exploration ● Systematic grid-based soil sampling program following up historical rock chip up to 0.86% Cu and 0.91g/t Au at Myalls and fresh assays from Ashes includes: o 10.65 g/t Au, 1.98%

  10. Slide 10: Ashes Prospect – Induced Polarisation (IP) Survey

    Ashes Prospect – Induced Polarisation (IP) Survey ASX: ADD Potential Walk-Up Drill Target Reprocessed Data by Mitre Geophysics (April 2025) Immediate opportunity for Adavale to step back to the east and target an RC/diamond drill hole into the central Previous Drilling by Meridian (2009) and AngloGo

  11. Slide 11: Abundant Gold & Copper Prospects in the Tier-1 Lachlan Fold Belt (NSW)

    Abundant Gold & Copper Prospects in the Tier-1 Lachlan Fold Belt (NSW)

  12. Slide 12: FRONT GATE (EL8831)

    FRONT GATE (EL8831) ASX: ADD Gold & Copper Targets Located in Fertile Ordovician Aged FRONT GATE LICENCE (EL8831) • Corner Prospect (EL 8831 North) • RAB drilling magnetic anomalies through cover hit 2m @ 1.73g/t Au, in a dacite dyke; probable epithermal mineralisation style. • Central Prospect (EL

  13. Slide 13: NO MISTAKE (EL8830) & THE DISH (EL9711)

    NO MISTAKE (EL8830) & THE DISH (EL9711) ASX: ADD Gold & Copper Targets Located in Fertile Ordovician Belts NO MISTAKE LICENCE (EL8830) • Welcome Mine (EL8830): average reported head grade was 11g/t Au, untested by drilling for continuation along strike, or at depth. • Parkvale Prospect (EL8830): ano

  14. Slide 14: Milestones Catalysts

    Milestones Catalysts ASX: ADD Parkes Project 3 x Rock Chip & Geochemical Survey Maiden JORC Maiden Drilling Exploration Target Phase 2 Acquisition Ashes & Myalls (5km2) London-Victoria Program London-Victoria Defined Drilling 279 grid-based soil samples & 19 rock chips (May 2025) (Q2 2025) (2H 2025)

  15. Slide 15: Corporate Overview

    Corporate Overview ASX: ADD Allan Ritchie Nic Matich ASX:ADD – Capital Structure (05 May 2025) Executive Chairman & CEO Non-Executive Director Experienced ASX/HKEx Energy and Experienced ASX Resources Shares on Issue 2,287M Resources CEO/ED/MD over 15 CEO/ED/MD with over 17 years’ years, 30+yr Inves

  16. Slide 16: Allan Ritchie Executive Chairman and Chief Executive Officer

    www.adavaleresources.com Allan Ritchie investor@adavaleresources.com Executive Chairman and Chief Executive Officer allan@adavaleresources.com Adavale Resources Limited +61 2 9127 9852 @Adavale

Adavale Resources — Investor Presentation (May 2025) on 6ix