  1. Slide 1: Extension of temporary suspension of processing plant operations

    Extension of temporary suspension of processing plant operations For personal use only 14 April 2011 Los Angeles, USA. 1

  2. Slide 2: Extension of temporary suspension of process plant operations

    Extension of temporary suspension of process plant operations For personal use only • On 28 January 2011 ERA commenced an orderly suspension of plant processing operations, for a period of 12 weeks as a precautionary measure to ensure that levels in the Tailings Storage Facility (TSF) remained below

  3. Slide 3: Rainfall tracker

    Rainfall tracker Wet Season Rainfall Tracker For personal use only 2800 2600 2010/11 Wet Season Summary Month Average Actual 2400 Sep 0.0 mm 0.8 mm Oct 3.2 mm 270.0 mm 2010-11 Wet Season 2200 Nov 134.2 mm 113.2 mm Dec 252.7 mm 260.8 mm Jan 380.7 mm 408.0 mm 2000 Feb 363.1 mm 726.0 mm Mar 317.7 mm 44

  4. Slide 4: Pit – dry season 2010

    Pit 3 – dry season 2010 For personal use only 4

  5. Slide 5: Pit – April

    For personal use only 5 Pit 3 – 12 April