Jupiter Energy Limited · ASX:JPR

Jupiter Energy — Investor Presentation (January 2023)

16 slides from Jupiter Energy's investor presentation, January 2023

  1. Slide 1: Corporate Presentation January 2023

    Corporate Presentation January 2023

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains forward-looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a variety of variables which could cause actual r

  3. Slide 3: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  4. Slide 4: Board of Directors and Management

    BOARD OF DIRECTORS AND MANAGEMENT Directors Geoff Gander Alexey Kruzhkov Baltabek Kuandykov Alexander Kuzev Mark Ewing Chairman/CEO NED - Cyprus NED - Kazakhstan NED - Moscow NED - Australia Kazakhstan & Australia o 25+ years experience in o 40 years’ experience in local and o 40+ years experience i

  5. Slide 5: Overview of Jupiter

    OVERVIEW OF JUPITER Operations started in 2008 on the 100% owned licence area under Contract 2275 and Contract 2023 outlook: 4803-UVS ME (Akkar East Production Contract) o Commercial Production from the Akkar East and West Zhetybai fields expected to return to optimal levels (~85 A total of ten well

  6. Slide 6: Progress from 2008-2022

    PROGRESS FROM 2008-2022 KEY PROJECTS DISCOVERIES OIL PRODUCTION CORPORATE DURING 2023 3D seismic data acquired for the 2010/11: NIL 1Q 2023 – Akkar East and West Listed on the ASX under ticker “JPR” entire licence area plus 2011/12: 4,000 tonnes/28,000 Zhetybai oilfields return to optimal 1,229,850,

  7. Slide 7: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  8. Slide 8: Location of the Licence Area

    LOCATION OF THE LICENCE AREA North Akkar Total reserves for the Mangistau basin are estimated to be in excess of 5 billion barrels including two large oil fields, Uzen and Zhetybai

  9. Slide 9: Reserves and Production Summary

    RESERVES AND PRODUCTION SUMMARY Daily Production from March 2023: Once requisite gas utilization infrastructure has been installed and approved to operate (expected March 2023) Akkar East and West Zhetybai will produce a cumulative ~85 tonnes / ~640 barrels per day Increase in Production from May 20

  10. Slide 10: Licence Details

    LICENCE DETAILS PRODUCTION LEVELS BLOCK 31 EXPLORATION LICENCE PRODUCTION LICENCE Permit issued in Completed on all 3 25 years for commercial o ~85 tonnes / ~640 December 2006 and oilfields discoveries – commenced in barrels per day expected acquired by Jupiter in 2020 in March 2023. June 2008 Amend

  11. Slide 11: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  12. Slide 12: Current Field Development

    CURRENT FIELD DEVELOPMENT License area of “MMG” JSC Prospect of the reserves’ increase in North Akkar the area of well #54 by 2.8mln. tons oilfield Akkar North (Eastern block) С1+С2 geol./recov. reserves Akkar North 2976/642thous.tons Joint Full Field Development Project with MMG JSC in progress Akk

  13. Slide 13: Current Status of Field Development

    CURRENT STATUS OF FIELD DEVELOPMENT Akkar North (East Block) & East Akkar: 6 wells @ 1-2km apart; All oil produced from the Triassic (T2B) horizon; T2A and Jurassic has shows in all wells, but the Company has not produced from intervals other than T2B; Final Reserve Reports for Akkar E and Akkar N (

  14. Slide 14: Production Outlook: 2023 to 2030

    PRODUCTION OUTLOOK: 2023 to 2030 PLANNED INFRASTRUCTURE STAGE 2 OPPORTUNITY TIMING PRODUCTION OUTLOOK Detailed 100% Gas Utilisation Tie in with existing gas Commission Stage 1 gas 25 year Production Licence Plan approved by the Kazakh infrastructure will enable utilization infrastructure and (thru t

  15. Slide 15: Further Development Potential

    FURTHER DEVELOPMENT POTENTIAL 10-20 mmbbls 10+ mmbbls

  16. Slide 16: Contact Details

    CONTACT DETAILS Geoff Gander Chairman & CEO Jupiter Energy Limited +7 701 221 8907 (KZ) +61 417 914 137 (AU) geoff@jupiterenergy.com www.jupiterenergy.com