  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation includes certain estimates and other forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, including statements with respect to anticipated operating and financial performance, growth opportunitie

  3. Slide 3: Investment Highlights

    Investment Highlights • Strong energy pipe markets • Industry leader with strategically located water transmission manufacturing facilities • Strategic plan to capitalize on current position and new opportunities • Experienced, energized and proven management team

  4. Slide 4: Northwest Pipe at a Glance

    Northwest Pipe at a Glance • Diversified manufacturer of welded steel pipe for water infrastructure, energy, agricultural, industrial and other uses • Industry leader – Over 100 years of operating history – Widely recognized for quality and customer service • National presence • Record net sales in

  5. Slide 5: Northwest Pipe Company Locations

    Northwest Pipe Company Locations

  6. Slide 6: Income Statement Summary

    ($ in millions) 2010 2011 Q1-2012 Income Statement Summary Net Sales Water Transmission $ 221.3 $ 271.9 $ 58.4 Tubular Products 165.5 239.8 83.8 Net Sales 386.8 511.7 142.2 Gross Profit Water Transmission 19.4 43.2 9.7 Tubular Products 10.3 15.9 6.8 Gross Profit 29.7 59.1 16.5 SG&A 29.1 26.3 7.3 Ope

  7. Slide 7: = $198 + 7B * = ° é 2150 a | +— o+— +

    300 258 250 = $198 200 + 7B * = ° é 2150 4 2 5 a 100 | 50 +— o+— + ‘ 7 a410 aa att2 eWater @ Tubular @ Total Northwest Pipe Company pe

  8. Slide 8: Balance Sheet Summary

    ($ in millions) Dec. 31, 2010 Dec. 31, 2011 Mar. 31, 2012 Balance Sheet Summary Assets Cash and Cash Equivalents $ 0.1 $ 0.2 $ 0.1 Trade and Other Receivables, Net 66.5 69.9 64.9 Costs and Estimated Earnings in Excess of Billings on Uncompleted Contracts 45.5 38.0 44.1 Inventories 80.9 107.2 98.6 Ot

  9. Slide 9: Northwest Pipe Company

    _ Northwest Pipe Company

  10. Slide 10: Tubular Net Sales by Product Group

    Tubular Net Sales $$ by Product Group Energy 73% Non-Energy 27% Energy 61% Non-Energy 39% Energy 82% Non - Energy 18% Q1-2012

  11. Slide 11: U.S. Rotary Rig Count

    U. S. Rotary Rig Count Total Active Rigs Active Rigs $150 $130 $110 s $90 $70 $50 800 '$30 Jan-2009° Jul-2009 Jan-2010 Jul-2010 Jan-2011 Jul-2011 Jan-2012 January 2009 - June 1, 2012 Sources: Baker-Hughes, Energy Information Administration (DOE), WTRG Economics WTRG Economics ©2012 wunw.wtrg.com (47

  12. Slide 12: Hydraulic Fracturing

    A pumper ck injects a taxol san, water ane YY] ‘ Nawal gastowsowotmet Racowred wat wed pen | tie P| pe! jz Natwal gas piped Hydraulic Fracturing Hydraut racturing, or ‘racking, involves the injection of more than a milion gallons. ‘of water, sand and chemicals ‘thigh pressure down and ‘cross into ho

  13. Slide 13: United States Shale Gas Plays

    United States Shale Gas Plays stata opacin yt . CA won ad ioe —=— A eee Northwest Pipe Company pe

  14. Slide 14: Northwest Pipe Company

    _ Northwest Pipe Company

  15. Slide 15: Well Positioned Industry Leader

    Well Positioned Industry Leader • Largest, most flexible capacity in the market • Strong relationships with public water agencies, contractors, engineering firms – Assist in development process of projects prior to bidding • Competitive position – Experienced workforce – Low freight costs – Excellen

  16. Slide 16: Water Infrastructure Overview

    Water Infrastructure Overview • Intakes, Raw Water Lines • Pump Stations • Pipeline Linings & Coatings (rehab) • Corrosion Protection/Monitoring • Couplings, Valves & Pumps • Interior & Yard Piping • Water Treatment Systems • Quality Monitoring • Flow Control Sewer Treatment Products • Gravity Sewer

  17. Slide 17: Current Conditions and a Look Ahead

    Current Conditions and a Look Ahead • Difficult market conditions in 2012 as water infrastructure projects compete with other infrastructure needs and municipal funding decreases • The bidding activity is significantly lower in 2012 • Emergency drought-related work and expected infrastructure projec

  18. Slide 18: Tarrant Regional Water District Integrated Pipeline Project (IPL)

    Tarrant Regional Water District Integrated Pipeline Project (IPL) Source: Tarrant Regional Water District http://www.trwd.com/IPLMap.aspx • The pipeline will run from Lake Palestine to Lake Benbrook, with connections to Cedar Creek and Richland- Chambers Reservoirs • It will integrate TRWD's existin

  19. Slide 19: Timeline / Project Components

    Timeline / Project Components Source: Tarrant Regional Water District http://www.trwd.com/IPLMap.aspx • IPL Components: – 150 miles of buried pipeline • 72 - 108” diameter welded steel pipe* – 3 lake intake pump stations – 2 booster pump stations • Communities Served: – DFW metroplex – Ellis County

  20. Slide 20: Northwest Pipe Strategic Plans

    Northwest Pipe Strategic Plans • Double EBITDA from 2011 to 2014 • Improve margins – Increase yields – Decrease downtime – Decrease costs • Capital investment in Atchison, KS to take advantage of line pipe market • Capital investment in Saginaw, TX to take advantage of large water infrastructure opp