Robyg S.A. · GPW:ROB

Robyg — H1 2023 Earnings Presentation

61 slides from Robyg's earnings presentation, August 2023

  1. Slide 1: Financial Results H1 2023

    Slide 1: Financial Results H1 2023

    FINANCIAL RESULTS H1 2023 Warsaw, August 2023 1

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary H1 2023

    Slide 3: Part 01 Summary H1 2023

    ROBYG PART 01 Summary H1 2023

  4. Slide 4: Summary H1 2023

    Slide 4: Summary H1 2023

    01. Summary H1 2023 Summary Operating cash flow: Revenues: Strong cash position*: PLN 58 million PLN 348 million PLN 316 million (excl. purchase of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary – ROBYG Group

    Slide 5: Summary – ROBYG Group

    01. Summary H1 2023 Summary – ROBYG Group Developer agreements signed: Units presold: 1 670 1 501 (net after cancellations) (net after cancellations) Number of units under Units on offer: 2 724 construction: 4 721 (out of which 6% finished goods) 5

  6. Slide 6: Summary – Vantage Development Group

    Slide 6: Summary – Vantage Development Group

    01. Summary H1 2023 Summary – Vantage Development Group Developer agreements signed*: Units presold*: 146 Units rented: 2 022 146 (net after cancellations) (net after cancellations) Number of units under Units on offer: 338 (for sale) Bond issue*: EUR 24 milion construction*: 1 483 (out of which 1%

  7. Slide 7: Material acquisitions and financial activities

    Slide 7: Material acquisitions and financial activities

    01. Summary H1 2023 ROBYG Group – material acquisitions and financial activities Total new financing: PLN 50 million New plots NEW PLOTS FINANCING Wroclaw, Gdansk Total expected potential for construction CREDIT FACILITIES of ca. 21 500 sqm of usable area. • revolwing loan with the limit of PLN 50 m

  8. Slide 8: Part 02 Presale & revenue perspective

    Slide 8: Part 02 Presale & revenue perspective

    PART 02 Presale & revenue perspective 8

  9. Slide 9: Presale structure – quarterly

    Slide 9: Presale structure – quarterly

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in H1 2023: 1670 units (20% H1’23/H1’17-22*), PLN 928 million (24% H1’23/H1’17-22*) Net number of presold units (quarterly)** 1196 1110 1032 938 894 755 776 638 650 606 445 381 Q3 2020 Q4 2020 Q1 2021 Q2 2021 Q3 2021 Q4 202

  10. Slide 10: Presale structure – annually

    Slide 10: Presale structure – annually

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in H1 2023: 1670 units (20% H1’23/H1’17-22*), PLN 928 million (24% H1’23/H1’17-22*) Net number of presold units (annually)** 4276 4308 57% 17% 3471 98% -50% -50% -27% 27% 2957 2% 2738 10% 2520 2569 -16% 2333 22% 2118 2156 2

  11. Slide 11: Presale structure by city

    Slide 11: Presale structure by city

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in H1 2023: 1670 units (20% H1’23/H1’17-22*), PLN 928 million (24% H1’23/H1’17-22*) Gdansk & Gdynia 42% 694 units Poznan <1% 6 units Wroclaw 6% 106 units Warsaw 52% 864 units on which 309 units presold in joinly controlled

  12. Slide 12: Units on offer

    Slide 12: Units on offer

    02. Presales & revenue’s perspective ROBYG Group – units on offer Units on offer 5187 FINISHED GOODS 4925 ON OFFER: 6% 33 4386 27 298 3491 190 2724 5154 4898 4088 166 * 3301 2558 2Q 2022 3Q 2022 4Q 2022 1Q 2023 2Q 2023 Units under construction** Units completed * The offer is decreased by 3 commerci

  13. Slide 13: Revenue recognition

    Slide 13: Revenue recognition

    02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 30 June 2023) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not recognized*: 2 727 2308 Completed: 169 Under construction: 1 237 1555 Which construction

  14. Slide 14: Units to be completed in 2023-2024

    Slide 14: Units to be completed in 2023-2024

    02. Presales & revenue’s perspective Number of units to be completed in 2023-2024 and also (contracted) until 30 June 2023 ( change. Note: Estimation of the completed investments may Total & Presold 2022 2023 2024 2023+2024 Total units Presold Total units Presold Total units Presold Total units Pres

  15. Slide 15: Number of units to be completed in 2023

    Slide 15: Number of units to be completed in 2023

    02. Presales & revenue’s perspective Number of units to be completed in 2023 Gdansk Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2023 completed in 2023 completed in 2023 Nowa Letnica 390 Mój Ursus 720 Jagodno

  16. Slide 16: Number of units to be completed in 2024

    Slide 16: Number of units to be completed in 2024

    02. Presales & revenue’s perspective Number of units to be completed in 2024 Gdansk Warsaw Wroclaw Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2024 completed in 2024 completed in 2024 Porto 248 Mój Ursus* 678 Osiedle nad Widawą - WP

  17. Slide 17: Part 03 Financial results

    Slide 17: Part 03 Financial results

    ROBYG PART Financial result pu

  18. Slide 18: Financial results

    Slide 18: Financial results

    03. Financial results Financial results (PLNk) H1 2023 H1 2022 Change Revenues 347 904 368 293 (5,5%) Cost of sales (248 527) (264 816) (6,2%) Gross profit on sales 99 377 103 477 (4,0%) Selling and marketing expenses (16 099) (13 055) 23,3% Administrative expenses (24 939) (24 524) 1,7% Other* 53 3

  19. Slide 19: Financial condition

    Slide 19: Financial condition

    03. Financial results Financial condition (PLNk) H1 2023 H1 2022 Change 2022 Total assets, including: 3 529 959 3 555 030 (0,7%) 3 522 878 Non-current assets, including: 723 735 690 302 4,8% 664 070 Investment properties and investment 489 196 523 124 (6,5%) 517 050 properties under construction Inv

  20. Slide 20: Statement of cash flow

    Slide 20: Statement of cash flow

    03. Financial results Statement of cash flow (PLNk) H1 2023 H1 2022 Net cash flows from operating activities, including: 48 107 136 422 Expenditures for the purchase of new plots (10 275) (19 932) Net cash flows from investing activities: 73 677 201 910 Proceeds from JV partner 99 419 - Loans grante

  21. Slide 21: Debt financing

    Slide 21: Debt financing

    03. Financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at June 30th, 2023 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years Total BANK CREDIT 245.00 0.00 0.00 245.00 FACILITIES BONDS 60.00 122.50 237.50 420.00 TOTAL 305.00 122.50 237.50 665.00 DEBT – In

  22. Slide 22: Leverage and collections

    Slide 22: Leverage and collections

    03. Financial results Leverage and collections as at June 30th, 2023 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = 0.29 granted – intercompany loans – cash and cash equivalents – amounts kept on individual escrow accou

  23. Slide 23: Part 04 Plans of ROBYG Group

    Slide 23: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 23

  24. Slide 24: Strategy

    Slide 24: Strategy

    04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

  25. Slide 25: Strategic goals

    Slide 25: Strategic goals

    04. Plans of ROBYG Group Strategic goals Number of presold of residential units in 2023 app. 3.000 units Maintaining of sales in the years ahead Maintaining the margins Maintaining the adequate level of the land bank Realisation of the ROBYG’s ESG strategy 25

  26. Slide 26: Total land bank

    Slide 26: Total land bank

    04. Plans of ROBYG Group Total land bank 13 990 units + 2 724 units on offer = 16 714 units Gdansk/Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Śródmieście/Gdansk 745 26% Włochy 2 080 32% Stare Miasto 260 18%

  27. Slide 27: Commercial potential

    Slide 27: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 55 000 sqm of usable area Commercial potential = 55 000 sqm of usable area WROCLAW* POZNAN 35 000 20 000 TOTAL: 55 000 sqm 27 * Preliminary land purchase agreements.

  28. Slide 28: Part 05 ESG

    Slide 28: Part 05 ESG

    PART 05 ESG Creating people and planet friendly spaces 28

  29. Slide 29: Mission, values, directions

    Slide 29: Mission, values, directions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and care for that are integrated with the surrou

  30. Slide 30: ESG – Environmental dimension

    Slide 30: ESG – Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals ROBYG for Planet means that we lead a sustainable development proce

  31. Slide 31: ROBYG Green Standard

    Slide 31: ROBYG Green Standard

    05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG GREEN STANDARD 31

  32. Slide 32: ESG – Social dimension

    Slide 32: ESG – Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction For us, construction is part of a new community shaping Strategic Goals process, which combines such el

  33. Slide 33: Human Balance

    Slide 33: Human Balance

    05. ESG – Social dimension ROBYG FOR PEOPLE HUMAN BALANCE 33

  34. Slide 34: ESG – Governance dimension

    Slide 34: ESG – Governance dimension

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website www.esg.robyg.pl We act responsibly by choosing to partner with local businesses, ▪ ROBYG ESG Strategy caring for

  35. Slide 35: ESG

    Slide 35: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  36. Slide 36: Part 06 Appendices

    Slide 36: Part 06 Appendices

    PART 06 Appendices 36

  37. Slide 37: Senior Management Team

    Slide 37: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 15 Y

  38. Slide 38: Ownership structure

    Slide 38: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 38

  39. Slide 39: TAG Immobilien AG consolidated financials

    Slide 39: TAG Immobilien AG consolidated financials

    06. Appendices TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) H1 2023 2022 2021 2020 2019 2018 Assets 7 756,4 8 214,6 7 088,6 6 478,0 5 647,0 5 033,3 Equity 3 057,8 3 307,7 3 129,5 2 681,5 2 394,2 2 048,3 EBITDA (adjusted) 121,8 233,5 226,1 222,3 214,7 206,4 Consolidated net

  40. Slide 40: Investments under construction (1)

    Slide 40: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 40 No. of stages: 8 No. of stages: 14 Stages completed:

  41. Slide 41: Investments under construction (2)

    Slide 41: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Nowa Letnica Young City 2 Modern City City: Gdansk City: Warsaw City: Warsaw District: Letnica District: Bemowo District: Bemowo No. of stages: 15 No. of stages: 5 No. of stages: 9 Stages completed: 14 Stages completed: 1 Stages comp

  42. Slide 42: Investments under construction (3)

    Slide 42: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Jagodno Osiedle Życzliwa Praga Nadmotławie Estate City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Tarchomin District: Śródmieście No. of stages: 10 No. of stages: 8 No. of stages: 10 Stages completed: 4 Stages comp

  43. Slide 43: Investments under construction (4)

    Slide 43: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Moment Mój Ursus Lagom City: Gdansk City: Warsaw City: Gdansk District: Ujeścisko District: Ursus District: Ujeścisko No. of stages: 4 No. of stages: 8 No. of stages: 1 Stages completed: 1 Stages completed: 5 Stages under constructio

  44. Slide 44: Investments under construction (5)

    Slide 44: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Szumilas Royal Residence Porto City: Gdansk (Kowale) City: Warsaw City: Gdansk District: Wilanów District: Nowy Port No. of stages: 6 No. of stages: 7 No. of stages: 16 Stages completed: 1 Stages under construction*: 5 Stages complet

  45. Slide 45: Investments under construction (6)

    Slide 45: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Sea Salt Początek Piątkowo Sady Ursynów City: Gańsk City: Poznań City: Warsaw District: Zaspa District: Piątkowo District: Ursynów No. of stages: 1 No. of stages: 7 No. of stages: 6 Stages under construction*: 1 Stages under construc

  46. Slide 46: Investments under construction (7)

    Slide 46: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Wiśniowa Aleja VISTA Dożynkowa 43 City: Gdańsk City: Gdańsk City: Wrocław District: Ujeścisko District: Piecki-Migowo District: Krzyki No. of stages: 2 No. of stages: 1 No. of stages: 1 Stages under construction: 2 Stages under const

  47. Slide 47: Investments under construction (8)

    Slide 47: Investments under construction (8)

    06. Appendices Description of investments – under construction (8) Osiedle nad Widawą Rytm Mokotowa Praga Piano City: Wrocław City: Warszawa City: Warszawa District: Psie Pole District: Mokotów District: Praga Południe No. of stages: 1 No. of stages: 4 No. of stages: 1 Stages under construction: 1 S

  48. Slide 48: Investments under construction (9)

    Slide 48: Investments under construction (9)

    06. Appendices Description of investments – under construction (9) Jutrzenki 92 Wendy City: Warszawa City: Gdynia District: Włochy District: Śródmieście No. of stages: 1 No. of stages: 5 Stages under construction*: 1 Stages under construction*: 1 No. of units: 133 units No. of units: 780 units Total

  49. Slide 49: Investments completed (1)

    Slide 49: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  50. Slide 50: Investments completed (2)

    Slide 50: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  51. Slide 51: Investments completed (3)

    Slide 51: Investments completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  52. Slide 52: Investments completed (4)

    Slide 52: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  53. Slide 53: Investments completed (5)

    Slide 53: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  54. Slide 54: Investments completed (6)

    Slide 54: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  55. Slide 55: Investments completed (7)

    Slide 55: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  56. Slide 56: Investments completed (8)

    Slide 56: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  57. Slide 57: Investments completed (9)

    Slide 57: Investments completed (9)

    06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

  58. Slide 58: Investments completed (10)

    Slide 58: Investments completed (10)

    06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

  59. Slide 59: Investments completed (11)

    Slide 59: Investments completed (11)

    06. Appendices Description of investments – completed (11) Kameralna Olszówka Apartamenty przy metrze City: Wrocław City: Warsaw District: Krzyki District: Bemowo No. of stages: 1 No. of stages: 1 No. of units: 55 units No. of units: 88 units Total sellable area: ca. 3,2k sqm Total sellable area: ca

  60. Slide 60: Disclaimer

    Slide 60: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

  61. Slide 61: Summary H1 2023

    Slide 61: Summary H1 2023

    Summary H1 2023 Please contact us: Units presold: 1 670 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl (22) 419 11 00 Developer agreements signed: 1 501 (net after cancellations) Units on offer: 2 724 (out of which 6% are finished goods) Revenues: PLN 348 million Strong cash

Source: company website