Turquoise Hill Resources Ltd.

Turquoise Hill Resources — RBC Capital Markets Global Metals and Mining Conference 2017

24 slides from Turquoise Hill Resources's conference presentation, June 2017

  1. Slide 1: Oyu Tolgoi: Advancing Value, Creating Options

    RBC Capital Markets Global Metals and Mining Conference June 13-14, 2017 Oyu Tolgoi: Advancing Value, Creating Options

  2. Slide 2: Forward-looking statements

    Forward-looking statements 2 This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Refor

  3. Slide 3: Turquoise Hill's investment thesis

    Turquoise Hill’s investment thesis 3 1. Oyu Tolgoi expected to be world’s third-largest copper mine 2. Significant cash flow expected from underground development 3. Hugo North Lift 1 financing in place1 4. Turquoise Hill should benefit from expected drop in copper supply (~2020) 5. Oyu Tolgoi’s res

  4. Slide 4: Oyu Tolgoi's expected production growth

    Oyu Tolgoi’s expected production growth 4 Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2017 – 2025: +320% 669 +450% 622 612 Expected gold production growth 2017 – 2025: 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 256 264 221 175 156 156 149 145 1

  5. Slide 5: Long-term copper fundamentals strong

    Long-term copper fundamentals strong 5 Copper mine supply/demand outlook  Copper market likely to enter a temporary deficit in 2017 Base Highly Probable Primary Demand Average copper price 30 Forecast 4.00  Ongoing attrition at existing mines driven by declining 25 grade Copper mine supply/demand

  6. Slide 6: Oyu Tolgoi underground is a Tier 1 asset

    Oyu Tolgoi underground is a Tier 1 asset 6 C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q4’16 Cost Service), 2016 Oyu Tolgoi Technical Report and Turquois

  7. Slide 7: Underground development

    Underground development Photo: Jumbo working on main access lateral development off of Shaft 1.

  8. Slide 8: 2016 Resources Case: ~3.4 billion tonnes

    2016 Resources Case: ~3.4 billion tonnes 8 Oyut Open Pit ~900Mt (reserve) 0.44% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold

  9. Slide 9: Underground mining sequence

    Underground mining sequence 9 Panel 0 Panel 2 Panel 1 Initial production South North Average grade 2.5% cu  Initial underground production begins with Panel 0  Highest copper grades occur during ramp up exceeding 2.5% in several years  2024-2026: Oyu Tolgoi peak copper production during period ex

  10. Slide 10: Alternative production cases

    Alternative production cases 10 Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes conc

  11. Slide 11: Underground development status

    Underground development status 11  2,600 equivalent metres completed (January 2016 – end Q1’17)  Increased metres expected in 2H’17 with larger crusher Lateral development  Additional third crew expected to start mid-2017  Fourth and fifth crews expected to start training mid-2017  Approximatel

  12. Slide 12: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 12 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Expansion capital Pre-start Sustaining capital Ex

  13. Slide 13: Open-pit operations

    Open-pit operations Photo: Oyu Tolgoi’s open-pit mine.

  14. Slide 14: Production highlights

    Production highlights 14 All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.22 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved throu

  15. Slide 15: Financial highlights

    Financial highlights 15 Cash position Operating cash flow ($'000,000) ($'000,000) $1,418 $1,344 $719 $651 $863 $399 Cu:$3.10 Cu:$2.49 Cu:$2.21 Au:$1,266 Au:$1,160 Au:$1,251 2014 2015 2016 2014 2015 2016 Strong cash position Consecutive periods of positive operating cash flow *Source: Average quarter

  16. Slide 16: Production and financial guidance

    Production and financial guidance 16 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates ~300,000 ounces (actual) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $775 million (actual) $720 million $840

  17. Slide 17: Managing near-term ore grade challenges

    Managing near-term ore grade challenges 17 Open-pit plan view Phase 7  Phases 6 and 4a as well as Phase 6 low-grade stockpile ore processed in 2017 Phase 10 Phase 5 Phase 8  Phase 4 stripping provides access to higher ore grades in 2018 Phase 4A Phase 9 Phase 4B Source: 2016 Oyu Tolgoi Technical R

  18. Slide 18: Oyu Tolgoi's impact in Mongolia

    Oyu Tolgoi’s impact in Mongolia 18 Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $6.1B At the end of 2016, ~94% Between 2010 and 2016, Between 2010 and 2016, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $6.1B in Mongolia1

  19. Slide 19: Oyu Tolgoi – a long-term growth opportunity

    Oyu Tolgoi – a long-term growth opportunity 19  Advancing underground development  Creating long-term development options  Demonstrated productivity and cost improvements  Best copper asset in development

  20. Slide 20: Appendix

    Appendix

  21. Slide 21: Project finance flow of funds

    Project finance flow of funds 21 At March 31, 20171 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $3.0 billion Shareholder loan: $3.0 billion Payable to Turquoise Hill* Receivable from Oyu Tolgo

  22. Slide 22: Underground elements

    Underground elements 22 Ground Support Undercut APEX To Drill Drilling Blasting 28m 28m 17m UNDERCUT 17m EXTRACTION 28m Extraction Ore Handling Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m Drawbell blast 12 m

  23. Slide 23: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 23

  24. Slide 24: turquoisehill.com

    turquoisehill.com Turquoise Hill Resources Ltd. Suite 354 - 200 Granville Street Vancouver, BC, Canada V6C 1S4 TRQ: TSX, NYSE & NASDAQ Turquoise Hill is an international mining company focused on the operation and development of the Oyu Tolgoi copper-gold mine in southern Mongolia.

Turquoise Hill Resources — RBC Capital Markets Global Metals and Mining Conference 2017 on 6ix