Rio Tinto Plc · LSE:RIO

Rio Tinto — Macquarie Australian Conference (May 2008)

23 slides from Rio Tinto's conference presentation, May 7, 2008

  1. Slide 1: Uranium: A clear future

    Uranium: A clear future Macquarie Australian Conference Graeme Hunt – President Uranium and Olympic Dam Development

  2. Slide 2: Disclaimer

    Disclaimer This presentation is for information purposes only and does not constitute or form part of any offer or invitation to acquire, sell or otherwise dispose of, or issue, or any solicitation of any offer to sell or otherwise dispose of, purchase or subscribe for, any securities, nor does it c

  3. Slide 3: Disclaimer (Continued)

    Disclaimer (Continued) Information for US Holders of Rio Tinto Limited Shares BHP Billiton Limited is not required to, and does not plan to, prepare and file with the SEC a registration statement in respect of the Rio Tinto Limited Offer. Accordingly, Rio Tinto Limited shareholders should carefully

  4. Slide 4: Agenda

    Agenda • Olympic Dam is a world class and superior resource • Strong nuclear demand growth prospects • Nuclear key to address climate change • Carbon price rewrites nuclear economics • China impact in the uranium industry

  5. Slide 5: bhpbilliton

    a i =i ed bhpbilliton (uarldap) 1601 nfo juowmeny - uIIED IHN Bot 1oung PHIEEN, (iarldap) wea ard io (add) araned (uaddog) Bueqse15, neyununy aldo puessierennm uaresnouy alo anon ayer sefip eaniger eu, Bussoy eae ny sio9 ASO 8 weg IsenyeIo9 ug epppunasa wed adutio | pup | geueanbnug | puaueL

  6. Slide 6: Olympic Dam: A world class resource

    Olympic Dam: A world class resource Notes: a) 100% of production shown. Split of bubble 55% Rio Tinto, 45% BHP Billiton. b) Bubble size reflects Rio Tinto’s current 19.9% exposure to Oyu Tolgoi. Rio Tinto has options to increase its ownership interest to 46.6%. Olympic Dam relative to Rio Tinto’s un

  7. Slide 7: Agenda

    Agenda • Olympic Dam is a world class and superior resource • Strong nuclear demand growth prospects • Nuclear key to address climate change • Carbon price rewrites nuclear economics • China impact in the uranium industry

  8. Slide 8: The world is well on its way to consuming as much energy in the next 25 years as in modern history

    The world is well on its way to consuming as much energy in the next 25 years as it has consumed throughout modern history OECD FSU Emerging Markets 2,500 5,000 7,500 10,000 12,500 15,000 World Primary Energy Use (million tonnes of oil equivalent) * At a hypothetical world average growth rate of 1%

  9. Slide 9: Primary energy consumption is strongly correlated to economic development

    Primary energy consumption is strongly correlated to economic development Source: World Bank, Government Statistics for Taiwan, BP Statistical Review of World Energy (2007) Primary energy use (tonnes of oil equiv/capita) 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 GDP/Capita

  10. Slide 10: China's annual power output is growing at a rate equivalent to a major European country

    China’s annual power output is growing at a rate equivalent to a major European country Power output added from previous year UK’s total power output today China’s Growing Power Output (in billion kWh)

  11. Slide 11: Energy Issues?

    Energy Issues? • Power generation and distribution • Energy efficiency and intensity • Urban environment and transport • Emissions

  12. Slide 12: Olympic Dam: Exposure to strong forecast nuclear demand growth – especially in the East

    Olympic Dam: Exposure to strong forecast nuclear demand growth – especially in the East Notes: a) Source: International Nucelar Safety Centre at ANL, Aug-2005 (www.insc.anl.gov/pwrmaps/world_map.pdf). b) Source: World Nuclear Association (www.world-nuclear.org/info.reactors.html), 17-Oct-2007. Under

  13. Slide 13: Olympic Dam: Exposure to strong forecast nuclear demand growth – especially in the East

    Olympic Dam: Exposure to strong forecast nuclear demand growth – especially in the East Notes: a) Location of reactors that are planned, under construction, and proposed is by country, but does not necessarily show their exact geographical location in a country. b) Source: International Nucelar Safe

  14. Slide 14: Slide 14

  15. Slide 15: Slide 15

  16. Slide 16: Agenda

    Agenda • Olympic Dam is a world class and superior resource • Strong nuclear demand growth prospects • Nuclear key to address climate change • Carbon price rewrites nuclear economics • China impact in the uranium industry

  17. Slide 17: Carbon price rewrites nuclear economics

    Carbon price rewrites nuclear economics Relative economics at no carbon cost Nuclear Coal Gas Relative economics @ $30/t CO2 Nuclear Coal Gas Relative economics @ $50/ t CO2 Nuclear Coal Gas Sources: WNA, UIC/AUA, CERA, OECD/IEA, US DOE, UK govt, CRU group • Nuclear power is competitive with other g

  18. Slide 18: What if China goes nuclear?

    What if China goes nuclear? *Including wind, biomass, oil, etc ** Include power sector and non-power sector thermal coal use (excluding coking coal) Source:NDRC power plant project database; Interviews; expert interviews; BHP Billiton; team analysis Uranium 1,532 2,054 1,532 2,054 12% 4% 26% 33% GW

  19. Slide 19: Impact of carbon emissions

    Impact of carbon emissions 13 4 41 Global green house gas emissions growth and abatement requirements (GT CO 2 e*) 4.8 6.7 38.5 China 2.8 US 0.9 EU 8.6 RoW 45.3 59.3 23** Abatement requirement 2030 including abatement RoW EU US China +155% 21.5 * Total emissions, including green house gas emissions

  20. Slide 20: China has been predictable in re-writing capital intensity and delivery

    China has been predictable in re-writing capital intensity and delivery 60-66 Months US$3000- US$5000/t installed capacity 40 Months, Greenfields US$1000- 1300/t installed capacity Detailed engineering through commissioning Copper smelters 40 Months + 400kt/yr alumina refinery – construction time 10

  21. Slide 21: Olympic Dam well positioned to meet energy demand

    Olympic Dam well positioned to meet energy demand Greenfields Expand open pit add Greenfield concentrator and hydrometallurgy circuits and expand smelter capacity Further expansion of open pit, build new concentrator and hydrometallurgy circuit Sell excess concentrate Stages CONCEPTUAL Output Cu (kt

  22. Slide 22: Nominal copper price ($/lb)

    Nominal copper price ($/lb) Escondida Production tpa Cu bhpbilliton

  23. Slide 23: ioe aente ad oo

    ioe aente ad oo tap mpg psampasmnanneain

RIO Tinto — Macquarie Australian Conference (May 2008) on 6ix