Slide 1: Unconventional Natural Gas
Unconventional Natural Gas A Compelling Case. A Focused Vision. June 2007 Trading Symbol: SPI – TSX Venture Exchange Website: www.csri.ca
Slide 2: Disclosure Statement
DISCLOSURE STATEMENT The corporate information contained in this presentation contains forward-looking forecast information. The reader is cautioned that assumptions used in the preparation of such information, although considered reasonably accurate by Canadian Spirit Resources Inc. (“CSRi”) at the
Slide 3: Farrell Creek Area
Farrell Creek Area
Slide 4: Corporate Information
CORPORATE INFORMATION Listed – SPI (TSX Venture Exchange) Working capital surplus - $1.5mm (March 31). No debt. 28,833,082 shares outstanding 2,471,000 options outstanding – average strike price = $2.40 3,200,00 warrants outstanding – strike price = $2.50 (expiring August 11, 2007) Manag
Slide 5: Overview
OVERVIEW Acquired 40,000 acres of Shallow Rights 75% of land also has deep rights Eight test holes drilled to date Four test holes have been fracture stimulated Independent estimate of 1.8 tcf of discovered resource for the shallow Gething, Gates and Moosebar Formations Deeper formations
Slide 6: Current Status
CURRENT STATUS Have recently established mechanical reliability on pumping units Implemented field changes to reduce costs Flowing wells while reducing reservoir pressure and determine a production response on three of four test holes Trailer mounted compressor to be utilized to complete thi
Slide 7: Current Status
CURRENT STATUS c-083 – Shut-in – deliverability test complete b-092 – Flowing – currently the best producing well to date b-003 – Flowing from upper zone – bridge plug wedged between zones b-002 – Flowing with only 22 meters perforated - lowest capital cost well to date d-093 – Drilled and cased - p
Slide 8: Results
RESULTS Well Deliverability 1600 —- b-002 Daily Gas —@ c-083 Daily Gas -& b-092 Daily Gas — Expon. (b-002 Daily Gas) — Expon. (c-083 Daily Gas) —— Expon. (b-092 Daily Gas) 1400 1200 1000 800 600 Wellhead Pressure (Kpa) 400 200 4 ~7.0 E’m* 100 Kpa 0.0 10 l 20 I50 40 50 60 70 80 90 10.0 50 mcfid 100 m
Slide 9: Valuation
VALUATION $Million 1.00 140 280 420 560 12+ 0.75 105 210 315 420 9 $/mcf $/share 0.50 70 140 210 280 5 0.25 35 70 105 140 1 10 20 30 40 Recovery Factor ( % ) Assumes 1.4 tcf of Gas-in-Place (Sproule) and 45 million fully diluted shares
Slide 10: Preliminary Economic Data
PRELIMINARY ECONOMIC DATA Capital Target: Less than $1 million to drill, case and fracture stimulate Production Target: 200-300 mcf/d from vertical wells B.C. Crown Royalty (new Net Profits Interest) Designed for unconventional gas 2% royalty on gross revenue until capital pool payout
Slide 11: Proposed Base Program
PROPOSED BASE PROGRAM Deliverability Testing Timing (March 30 to June 30, 2007) Continue to flare three test holes to establish consistent run time (upward production trend) Currently b-092 is the best well (100 to 150 mcf/d) Install trailer mounted compressor Shut in c-083 and continue to
Slide 12: Proposed Base Program
PROPOSED BASE PROGRAM Tie-in Evaluation Timing (June 2007) Determine in parallel Tie-in options Industry Partner – Short term solution Will take raw gas for compressor fuel Initiate discussions Spectra Energy (formerly Duke Energy) – Long term solution Must meet sales gas specificati
Slide 13: Proposed Base Program
PROPOSED BASE PROGRAM Apply best completion techniques Timing (July to August 2007) Fracture stimulate d-093 Flow back and drawdown pressure with trailer mounted compressor Continue to monitor b-092 and b-002 Move trailer mounted compressor as required Issues: How much will the rate in
Slide 14: Proposed Base Program
PROPOSED BASE PROGRAM Prepare for tie-in and add production Timing (August to October 2007) Finalize pipeline access Start construction Convert test holes to production wells Drill three vertical wells Spacing Consider drilling one directional well Continue to evaluate results to fin
Slide 15: Proposed Base Program
PROPOSED BASE PROGRAM Tie-in for cash flow Timing (October to mid December 2007) Tie-in the following producing wells b-092 d-093 Possibility to tie-in up to five additional wells Goal: Target total production of 1 million cubic feet per day and increasing
Slide 16: Additional Potential
ADDITIONAL POTENTIAL Shallow Rights – (Surface to base of Cadomin) Substantial availability of B.C. Crown lands Land swap/Farm-in potential GeoMet “Strategic Process” Infrastructure co-operation Formations Moosebar and Bluesky
Slide 17: Additional Potential
ADDITIONAL POTENTIAL Deep Rights – (Below base of Cadomin to basement) Land swap/Farm-out potential Activity in Farrell Creek Area NorthPoint Energy Ltd. Talisman Energy Inc. Triumph Pacific Oil & Gas Corp. Others Formations Nordegg/Fernie, Halfway, Doig/Montney, Debolt
Slide 18: 2007 Funding Plan
2007 FUNDING PLAN Confirm productivity and economics $3 million private placement June 2007 Capital program June – August 2007 Production and reserves $15 – $30 million September 2007 Capital program September 2007 – September 2008
Slide 19: Conclusions
CONCLUSIONS Farrell Creek Project Large discovered resource – 1.8 tcf on existing lands Expect production in early 2008 Large number of potential locations Prospective deep rights/multi-zone potential Year round road and pipeline accessibility Long Reserve Life Index (low decline)
Slide 20: Farrell Creek Location
FARRELL CREEK LOCATION Fort St. J ohn CSRi Land Sedimentary Basins Duke Energy Pipeline
Slide 21: Farrell Creek Lands
FARRELL CREEK LANDS CSRI T85 EnCana Talisman T84 GeoMet/ CEP/ Triumph T83 T82 T81 93-O-16 R26 R25 R24 R23
Slide 22: Farrell Creek Pilot Project
2 FARRELL CREEK PILOT PROJECT @SRI eee eee eee eee eee eee Proposed CSRI Pipeline \ i x Energy I ot Tap’ Yoon ten Duke Enetgy Main Pipaine ™: 7° 74 Experimental Scheme Area
Slide 23: Canadian Spirit Resources Inc. contact details
Canadian Spirit Resources Inc. Suite 1950, Ford Tower 633 6th Avenue S.W. Calgary, Alberta T2P 2Y5 Telephone (403) 539-5005 E-mail: info@csri.ca TSX Venture: SPI www.csri.ca