SSE — Investor Day (September 2022)

57 slides from SSE's investor day presentation, Sep 8, 2022

  1. Slide 1: Disclaimer

    DISCLAIMER This presentation has been prepared by SSE plc solely for use on 8 September 2022 during the SSE Renewables Management presentation section of SSE plc’s 2022 Investor Relations event. This presentation may not be disclosed or published, nor used by any other person or entity, for any purp

  2. Slide 2: SSE Renewables Powering Change Investor Event

    SSE RENEWABLES POWERING CHANGE Investor Event 8 September 2022

  3. Slide 3: Agenda

    AGENDA Day 2 – SSE Renewables Drumossie Hotel 08:00 – 09.10: Management Presentations 09.10 – 09.45: International Growth - Panel 09.45 – 10.00: Break 10.00 – 11.30: Offshore and Onshore Updates 11.30 – 12.45: Wrap Up and Lunch Site Visits 12.45 – 14.00: Travel to Stronelairg Wind Farm 14.00 – 16.40

  4. Slide 4: Overview

    OVERVIEW • Introduction to our team People • Our new operating model • Building our capabilities • Delivering NZAP and beyond Priorities • Our strategy for success • Accelerating growth • Delivering returns Performance • Capital allocation • Managing risks • Growing and diversifying Pipeline • Prior

  5. Slide 5: If it's not safe, we don't do it

    IF IT’S NOT SAFE, WE DON’T DO IT Getting everyone home safe 2021/22 (vs 2020/21) TRIR Our safety strategy 0.50 0.40 0.30 0.20 0.10 Contractor Reportable 0.00 2017/18 2018/19 2019/20 2020/21 2021/22 Working Hours Injuries +135% -28% • A ‘communities’ approach, focused on building relationships and wo

  6. Slide 6: People: Our Leadership Team

    PEOPLE: OUR LEADERSHIP TEAM New operating model set up to deliver long-term, sustainable growth • A technology-based structure with end-to-end accountability for the development, construction and operation of assets with distinct market dynamics: - Offshore Wind (domestic and international) Stephen

  7. Slide 7: Priorities: Delivering on SSE's NZAP

    PRIORITIES: DELIVERING ON SSE’S NZAP The optimal pathway to maximise shareholder value and growth into the 2030s FULLY-FUNDED ENHANCED …DELIVERING ACCELERATED GROWTH …AND THE PLATFORM FOR INVESTMENT PLAN… AT ATTRACTIVE RETURNS INTO 2026… GROWTH TO 2031 & BEYOND RENEWABLES ELECTRICITY NETWORKS +4GW >

  8. Slide 8: Priorities: NZAP and Beyond

    PRIORITIES: NZAP AND BEYOND More than tripling installed capacity to >13GW by FY31, supported by high quality pipeline >13GW Operational Offshore Wind Onshore Wind (inc. solar) Pumped Storage ~8GW 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 Plus further organic growth prospects acros

  9. Slide 9: Priorities: Building World-Leading Assets

    PRIORITIES: BUILDING WORLD-LEADING ASSETS Executing on our flagship projects is key this year 3,600MW | SSE share: 40% 1,075MW | SSE share: 49% 443MW | SSE share: 100% • Will be the world’s largest offshore • Will be Scotland’s largest offshore • Will be one of the UK’s most productive wind farm whe

  10. Slide 10: Priorities: Our Strategy

    PRIORITIES: OUR STRATEGY Accelerating growth, optimising value, and building a long-term sustainable business * *Indicative target consistent with 7-10% EPS CAGR over five years to FY26 10 Presented by Stephen Wheeler, Managing Director

  11. Slide 11: Performance: Current Operations

    PERFORMANCE: CURRENT OPERATIONS Diversity of portfolio delivering strong operational performance in volatile markets Renewable Generation Operational Clusters 5-Year Technology Output v Budget 12 TWh (inc. constrained off, but exc. pumped Installed Availability 10 capacity (avg. FY19-22) HYDRO ONSHO

  12. Slide 12: Performance: Earnings (Sources)

    PERFORMANCE: EARNINGS (SOURCES) Positioned well for high inflation and commodity prices given revenue and technology mix EBITDA % breakdown by technology Volume % breakdown by revenue source >12% CAGR* ~2.5x TWh growth 45% 55% 25% 20% 30% 25% FY19 FY20 FY21 FY22 … FY26 FY19 FY20 FY21 FY22 … FY26 (es

  13. Slide 13: Performance: Earnings (Growth)

    PERFORMANCE: EARNINGS (GROWTH) Significant increase in renewables earnings in line with NZAP growth to 2026 Expected future growth to March 2026 ✓ Flagship construction projects, including >12% Dogger Bank, Seagreen, and Viking are Adjusted completed EBITDA CAGR* ✓ Near-term onshore wind projects, i

  14. Slide 14: Performance: Net Capex and Investment

    PERFORMANCE: NET CAPEX AND INVESTMENT Investment to increase to around £5bn to 2026 to deliver NZAP Capex and investment bridge to March 2026 Disciplined capital investment criteria with efficient use of partnerships ~£5bn 60% already committed Overall approximate allocation: 60% committed ~£3bn 40%

  15. Slide 15: Performance: Returns

    PERFORMANCE: RETURNS Creating value in competitive environments Target returns Value creation + Site selection and optimisation 100-400 Developer + Operational synergies bps Target + Optimisation of gains Merchant exposure project + Design and Project Target returns return procurement finance effici

  16. Slide 16: Performance: Funding

    PERFORMANCE: FUNDING Project financing reduces single asset equity exposure and supports credit metrics Case study: Dogger Bank C Cumulative equity cashflow position Financial Devex refunds and Commercial £100m Close Sale proceeds Operation Date Devex accumulates £50m pre-FID £0m Capacity Capex 1,20

  17. Slide 17: Performance: Funding (Continued)

    PERFORMANCE: FUNDING (CONTINUED) Capital recycling and partnership model helps to fund new investments Partnership model helps to Sell down value realised since April 2018 reduce single asset risk, > £1.6bn improves project returns, and £70m £70m supports NZAP growth plan £206m £350m Total proceeds

  18. Slide 18: Performance: Managing Risks

    PERFORMANCE: MANAGING RISKS Diverse revenue streams, supply chain approach, and hedging strategy mitigate key pressures ✓ Diverse mix of contracted revenues, including: CFD, ROC, Capacity Mechanism, and ancillary services ✓ Accelerated hedging activity to capture prices, where liquidity exists Reven

  19. Slide 19: Pipeline: Growing and Diversifying

    PIPELINE: GROWING AND DIVERSIFYING We have grown our secured pipeline from 10 GW to >13 GW this year BY TECHNOLOGY BY STAGE BY GEOGRAPHY SECURED PIPELINE Onshore* In Construction GB Offshore Wind Ireland Late Stage >13GW Floating Offshore >13GW Development >13GW Spain Early Stage Pumped Storage Deve

  20. Slide 20: Pipeline: Prioritising New Opportunities

    PIPELINE: PRIORITISING NEW OPPORTUNITIES Focusing on most attractive markets and entry routes, where we have competitive advantages Offshore Wind Onshore Wind Hybridisation 1. Screening markets and technologies UK / Ireland Established Market Market Competitive Auctions / site Organic; hybridisation

  21. Slide 21: Pipeline: Growth in the UK and Ireland

    PIPELINE: GROWTH IN THE UK AND IRELAND Accelerating ambition in our core markets MARKET ATTRACTIVENESS OUR PROJECTS AND PROSPECTS ✓ Wind the lowest cost ‘bulk’ low-carbon generation source, with high wind speeds and shallow seabed ✓ Highly supportive policy, including CfDs and strong carbon pricing

  22. Slide 22: Pipeline: International Prospects

    PIPELINE: INTERNATIONAL PROSPECTS Pursuing growth opportunities in Europe, Japan, and the US MARKET ATTRACTIVENESS MARKET GROWTH OUTLOOK ✓ Net zero and energy security focus increasing sector growth Capacity Installed (GW) 500 Europe* ✓ Robust commodity price drivers 400 ✓ Adjacent markets where SSE

  23. Slide 23: Pipeline: Focus on Southern Europe

    PIPELINE: FOCUS ON SOUTHERN EUROPE Strategic acquisition provides attractive projects in key markets and greenfield development Established and proven development platform Providing accelerated entry into growth markets Leading position as developer across ~3.8GW onshore wind platform with key Europ

  24. Slide 24: Questions?

    QUESTIONS?

  25. Slide 25: International Growth Panel

    PANEL INTERNATIONAL GROWTH 25

  26. Slide 26: Video

    VIDEO 26

  27. Slide 27: Projects: Offshore Wind – Our Journey

    PROJECTS: OFFSHORE WIND – OUR JOURNEY Building more offshore wind today than any other company worldwide 260m 205m 198m 131m 2012 2019 2023 2026 Greater Gabbard Beatrice Seagreen Dogger Bank • 504MW • 588MW • 1,075MW • 3,600MW • 3.6MW turbines • 7MW turbines • 10.5MW turbines • 13-14MW turbines • EP

  28. Slide 28: Projects: Offshore Wind – Competitive Edge

    PROJECTS: OFFSHORE WIND – COMPETITIVE EDGE We have honed our expertise over two decades of developing world-leading projects Development Construction Operation Site optimisation and design Supply chain management Decade-long experience ✓ Leading-edge resource modelling ✓ Proven multi-contracting str

  29. Slide 29: Video

    VIDEO 29

  30. Slide 30: Projects: Offshore Wind – To the Future

    PROJECTS: OFFSHORE WIND – TO THE FUTURE Setting ourselves up for future success Digital Capabilities Route-to-Market Floating Wind • Ground-breaking partnership - • In an increasingly competitive • Securing ScotWind site and with Microsoft (surveys at Berwick environment, alternative RtM SSE-Pacific

  31. Slide 31: Projects: Bringing It All Together

    PROJECTS: BRINGING IT ALL TOGETHER Berwick Bank – one of the world’s largest offshore wind developments Timely grid connection secured for 4.1GW Significant economies of scale throughout lifecycle Seagreen Beatrice Seagreen 1A ~£25m one-off Berwick Bank plus other SSE-led projects seabed lease fee a

  32. Slide 32: Video

    VIDEO 32

  33. Slide 33: Our Onshore Wind Portfolio

    OUR ONSHORE WIND PORTFOLIO Building on decades of experience as an industry leader OUR STRATEGIC ADVANTAGES Viking (443MW) • Highly-experienced in-house team with site selection, Tangy Strathy South (208MW) (69MW) Achany Extension (77MW) consenting, design optimisation, procurement, Lenalea Bhlaraid

  34. Slide 34: Video

    VIDEO 34

  35. Slide 35: Our Hydro Portfolio

    OUR HYDRO PORTFOLIO A rich heritage and a bright future 1,160MW 79 conventional hydro power stations 300MW 94 pumped storage large dams 3.8TWh 900GWh annual total storage output* capacity* 320km 11% of tunnel of Scottish landmass systems in catchment area *conventional hydro only, with typical avail

  36. Slide 36: The Source of Our Value

    THE SOURCE OF OUR VALUE Integrated schemes, not isolated assets, providing flexibility and control Tummel Valley Scheme: CUAICH • Integrated scheme, combined with expert DALWHINNIE operation, gives control over water flow • Same piece of water can generate energy multiple times throughout scheme ERI

  37. Slide 37: The Source of Our Value

    THE SOURCE OF OUR VALUE High flexibility conventional hydro assets, capable of rapid response 75MW 17.2GWh 152.2MW 17.1GWh Installed Storage Installed Storage capacity capacity capacity capacity 16% 3.4 mins 10% 3.33 mins Capacity Time to Capacity Time to Errochty factor full load Sloy factor full l

  38. Slide 38: Pumped Storage flexibility at Foyers

    THE SOURCE OF OUR VALUE Pumped Storage flexibility at Foyers 300MW 6.1GWh Installed Storage capacity capacity 150MW 2 mins Ramp rate Time to full load per minute Foyers 38

  39. Slide 39: The Source of Our Value

    THE SOURCE OF OUR VALUE Capturing upside from flexibility, and insuring against portfolio downside risks CONVENTIONAL HYDRO PUMPED STORAGE Generation Output Strategic Value Flexibility Bank for Excess • Generates low cost, • Insurance against Services Supply highly flexible price capture renewable p

  40. Slide 40: Capturing Value from Flexibility

    CAPTURING VALUE FROM FLEXIBILITY Responding flexibly to system requirements and market signals Hydro Output Over 24 Hours (20/12/21) Day vs Day Comparison (Jan 22) 1200 1200 1,000MW 1000 evening peak 1000 5 January 2022 Hydro Output (MW) Hydro Output (MW) 800 800 600 600 400 400 200 200 200MW 1 Janu

  41. Slide 41: Capturing Value from Diverse Sources

    CAPTURING VALUE FROM DIVERSE SOURCES Revenue in Conventional Hydro and Pumped Storage Conventional Hydro 350 5 Power Sales 300 4 ROC and REGO 250 (Output TWh) EBITDA (£m) FY22 Revenue 200 3 Flexibility Services* Capacity Market 150 2 100 1 50 Foyers Pumped Storage 0 0 FY20 FY21 FY22 Power Sales Hydr

  42. Slide 42: Our Investment Plan

    OUR INVESTMENT PLAN Generation for generations • Integrated 10-year investment plan underway to maintain and modernise our fleet • Investing c.£50m capex annually to increase ramp rates, water capture, storage capacities, and overall flexibility − Refurbishing and upgrading stations to extend life,

  43. Slide 43: Focus on: Tummel Bridge Power Station

    FOCUS ON: TUMMEL BRIDGE POWER STATION Playing a vital role in the net zero transition £50m investment project to repower iconic 90-year-old station in Highlands Replacing the two existing turbines, which have been in place since 1933 Expected to extend operational life by at least 40 years Increasin

  44. Slide 44: Digitalising Our Oldest Assets

    DIGITALISING OUR OLDEST ASSETS Optimising value through automated scheduling and dispatch ✓ Optimal storage and reduced spill ✓ Price driven dispatch ✓ Automatic technical and environmental constraint management Generation, gate, and Weather Market reservoir data data prices ✓ Consistent and transpa

  45. Slide 45: Strategy Adjustment

    Strategy Adjustment : ‘A INNA sse Renewables

  46. Slide 46: Flexibility for the Future

    FLEXIBILITY FOR THE FUTURE Growing value in a net zero system by providing firm and flexible renewable power Pumped hydro storage provides almost all our 25GWh electricity storage volume today and continues to grow in all scenarios - National Grid ESO, Future Energy Scenarios 2022 Generation and con

  47. Slide 47: Focus on: Coire Glas

    FOCUS ON: COIRE GLAS Ready to double the UK’s electricity storage capacity KEY POINTS • Proposed 30GWh (up to 1.5GW) scheme at an ideal site with significant elevation between a large lower and new upper reservoir over a short distance • Capable of responding quickly to grid changes – generating ele

  48. Slide 48: Questions?

    QUESTIONS?

  49. Slide 49: Afternoon Agenda

    AFTERNOON AGENDA Site visits to Stronelairg Wind Farm and Glendoe Hydro Glendoe Site Entrance Main Access Tunnel Rotation A – Stronelairg then Glendoe Car 1A then 1B Car 2A then 2B Car 3A then 3B Car 4A then 4B David Edes (driver) Neil Lannen (driver) William Caithness (driver) Jim Laing (driver) As

  50. Slide 50: Site Map

    II son ot end a an 50 sse Renewables

  51. Slide 51: Site Visit: Stronelairg Windfarm

    SITE VISIT Stronelairg Windfarm Capacity 228MW • Commissioned in December 2018 Turbines 66 x Vestas 3.45MW • Sits at an elevation of c600 meters above sea Average load factor c42% level making it one of SSE Renewables’ Annual production c800GWh windiest sites SSE share 51.1% • In February 2019, SSE

  52. Slide 52: Site Visit: Glendoe Hydro

    SITE VISIT Glendoe Hydro • Planning began as early as 2001 with construction commencing four years later Capacity 100MW Typical load factor c20% • Construction involved: Storage capacity 12GWh ➢ 960 meter-wide dam to create reservoir 600m above power station SSE share 100% ➢ 8.6km tunnel connecting

  53. Slide 53: Safety Briefing

    VIDEO SAFETY BRIEFING ie!

  54. Slide 54: PPE Requirements

    PPE REQUIREMENTS Staying safe on site Safety Hat Safety Glasses High Viz Clothing Gloves Safety Boots 54

  55. Slide 55: Thank You

    THANK YOU

  56. Slide 56: SSE Renewables – Pipeline and Prospects

    SSE RENEWABLES – PIPELINE AND PROSPECTS High quality pipeline options, with opportunities to sustainably grow into the next decade LATE-STAGE EARLY-STAGE IN CONSTRUCTION SECURED PIPELINE FUTURE PROSPECTS DEVELOPMENT DEVELOPMENT 0.5GW operational 1.5GW operational 2.0GW operational MW MW MW MW MW ONS

  57. Slide 57: SSE Renewables – Project Assumptions

    SSE RENEWABLES – PROJECT ASSUMPTIONS Assumed future ownership percentages used as basis for slide 8 Technology Project Gross Current SSE Assumed future SSE Net Capacity Capacity (MW) ownership ownership Additions (MW) Viking 443 100% 100% 443 Yellow River 104 100% 100% 104 Strathy South 208 100% 100