Boral Ltd.

Boral — Corporate Update (May 2018)

23 slides from Boral's corporate update, May 17, 2018

  1. Slide 1: Boral Quarries Teven Community Consultative Committee

    Build something great™ BORAL QUARRIES TEVEN > Community Consultative 17 May 2018 Committee meeting Teven Quarry offices, Teven

  2. Slide 2: Agenda

    Agenda ˃ Welcome, administration and ‘safety moment’ ˃ Quarry operations update ˃ Environmental management and performance ˃ Community participation and general business

  3. Slide 3: Welcome, administration and 'safety moment'

    Welcome, administration and ‘safety moment’ ˃ Welcome and re-introductions ˃ Previous meetings – Community Consultative Committee meeting ˃ 15 November 2017 ˃ Presentations and meeting notes from previous meetings are available from the quarry’s website – www.boral.com.au/tevenquarry ˃ Any matters a

  4. Slide 4: Quarry operations update

    Build something great™ BORAL TEVEN QUARRY > Quarry operations update

  5. Slide 5: Quarry Operations update

    Quarry Operations update ˃ Current and future supply ˃ Highway upgrade – Pimlico to Teven ˃ Highway upgrade – Woologoolga to Ballina ˃ Construction of Harwood Bridge ˃ Construction of Ferngrove residential estate ˃ Local projects ˃ Internal supply to Boral Concrete plants ˃ Internal supply to Boral

  6. Slide 6: Main areas of works over the past six months

    Main areas of works over the past six months

  7. Slide 7: Noise bund constructed on the north eastern side of the quarry

    Noise bund constructed on the north eastern side of the quarry ˃ 40000t placed to construct new noise bund ˃ Some final touches before grassing and tree placement

  8. Slide 8: General tidying up areas of site

    General tidying up areas of site

  9. Slide 9: Environmental management and performance

    Build something great™ BORAL TEVEN QUARRY > Environmental management and performance

  10. Slide 10: Weed control areas & man hours

    Weed control areas & man hours Weed Control Man Hours 50 45 40 35 30 25 20 15 10 5 0 Nov-2017 Jan-2018 Mar-2018 Areas worked

  11. Slide 11: Environmental monitoring

    Environmental monitoring Averaging Period g/m2/montha Deposited Dustb Annual 4.00 a – Maximum total deposited dust level b – Dust is assessed as insoluble solids as defined by AS3580.10.1-1991 (AM-19) (At the nearest existing or likely future off-site sensitive receptor) Source: Table 7.1 (Page 28)

  12. Slide 12: Environmental dust monitoring - Site (Opposite Shale Quarry)

    Environmental dust monitoring Site 1 (Opposite Shale Quarry) 12 8 (g/m2 month) 4 0 Insoluble Solids Ash Annual Average Dust Deposition (Insoluble Solids) 0.30 g / m2 / month

  13. Slide 13: Environmental dust monitoring - Site (Manager's Cottage)

    Environmental dust monitoring Site 2 (Manager's Cottage) 12 8 (g/m2 month) 4 0 Insoluble Solids Ash Annual Average Dust Deposition (Insoluble Solids) 0.53 g / m2 / month

  14. Slide 14: Environmental dust monitoring - Site (Quarry Office)

    Environmental dust monitoring Site 3 (Quarry Office) 12 8 (g/m2 month) 4 0 Insoluble Solids Ash Annual Average Dust Deposition (Insoluble Solids) 1.80 g / m2 / month

  15. Slide 15: Environmental dust monitoring - Site (Beacons Rd)

    Environmental dust monitoring Site 4 (Beacons Rd) 12 8 (g/m2 month) 4 0 Insoluble Solids Ash Annual Average Dust Deposition (Insoluble Solids) 0.39 g / m2 / month

  16. Slide 16: Environmental PM10 monitoring

    Environmental PM10 monitoring PM10 Monitoring: Teven Quarry 60 50 40 24 Hour Sample μg/m3 30 Sample Annual Average-Progressive 20 Maximum Concentration Standard 24-hr (50μg/m3) 10 Maximum Concentration Standard Annual Average (25μg/m3) 0 Date

  17. Slide 17: Environmental water monitoring

    Environmental water monitoring Surface Water Quality - pH 9 8.5 8 7.5 7 6.5 6 5.5 15/01/20176/03/201725/04/201714/06/20173/08/201722/09/201711/11/201731/12/201719/02/201810/04/201830/05/2018 pH pH Lower Limit pH Upper Limit 60 Surface Water Quality - Total Suspended Solids (TSS) 55 50 45 40 35 30 25

  18. Slide 18: Blast Monitoring Results

    Blast Monitoring Results Date Time (DB) (MM/S) (DB) (MM/S) Boral Teven Quarry Blast Friday, 28 July 2017 13:08:00 93.9 0.47 111.8 1.8 Limits Tuesday, 29 August 2017 12:19:00 0 0 0 0.0 • Only 1 blast per day Monday, 11 September 2017 12:13:00 95.9 0.56 108.4 2.3 • Only blast between 9am to Tuesday, 1

  19. Slide 19: Community participation and general business

    Build something great™ BORAL TEVEN QUARRY > Community participation and general business

  20. Slide 20: Community participation

    Community participation ˃ TinCAN partnership has been entered into the Community Leadership category of the 2018 CCAA Innovation Awards. ˃ Presented in Sydney during August.

  21. Slide 21: Community participation

    Community participation ˃ Boral Teven Quarry continues to play an active role in our local community. So far in 2018: ˃ Conservation Volunteers Australia will this year be visiting Alstonville Public School during June. ˃ TinCAN partnership – next ‘bus trip’ is to Byron Bay. ˃ Tintenbar Community Ha

  22. Slide 22: General business and contacts

    General business and contacts ˃ Items of general business ˃ Function Centre DA latest ˃ Location of asphalt plant at quarry ˃ Next meeting of the Community Consultative Committee ˃ Will be arranged for October-November. ˃ Boral Teven Quarry contacts: ˃ Scott Gillieatt Quarry Manager 6687 8360 / scot

  23. Slide 23: Thank you for your attendance

    Build something great™ BORAL TEVEN QUARRY > Thank you for your attendance