11 slides from Barrick Mining's conference presentation, Jan 23, 2013
Slide 1: CIBC 16th Annual Whistler Institutional Investor Conference
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 CIBC 16th Annual Whistler Institutional Investor Conference January 23, 2013 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation,
Slide 2: Disciplined, Profitable Production
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Disciplined, Profitable Production Industry’s largest production Lowest total cash costs among seniors World class assets, lower risk g global p portfolio Disciplined capital allocation Recalibrated pro
Slide 3: Industry Leading Production/Reserves
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Industry Leading Production/Reserves 2011 Gold Production(1) 2011 Gold Reserves(1,2) (M oz) (P&P – M oz) 7.7 139.9 ABX ABX 98.8 5.2 NEM NEM 4.3 80.0 77.6 75.6 AU NCM GFI 3.5 AU 64.7 62.6 GFI GG KGC 2.7 2.6 2.5 NC
Slide 4: Key Gold Assets / Returning Capital
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Key Gold Assets 9 months ended Sept. 30, 2012 2011 Total Production Cash Costs(1) Reserves(2) (K oz) (US$/oz) (P&P M oz) (P&P-M Cortez 1,024 296 14.5 Goldstrike 844 556 12.4 Veladero 544 478 10.6 Lagunas Norte 54
Slide 5: Priorities/Catalysts; 2012 Preliminary Results
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Priorities/Catalysts Meet production and cost targets Ramp p Pueblo Viejo j up p to full capacity p y Advance Pascua-Lama Improve Lumwana performance Portfolio optimization Identify further measures t
Slide 6: Pueblo Viejo - ramp up progress
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Pueblo Viejo - ramp up progress Achieved commercial production in January 2013 Ramp-up Ramp p to ffullll capacit capacity expected in the second half of 2013 Autoclave Circuit 11 Pueblo Viejo - long life, low
Slide 7: Pascua-Lama - world class asset
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Pascua-Lama - world class asset Merrill Crowe Building One of the world’s largest, lowest cost gold mines 800-850 K oz of average annual gold production(1) 35 M oz of average annual silver production(1) $0
Slide 8: Pascua-Lama – construction update
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Pascua-Lama – construction update Covered Stockpile/Grinding Building Autogenous Grinding Mill Pebbles Crusher Leach Circuit Overview 15 Lumwana – copper In-fill drilling exploration program completed An upda
Slide 9: Disciplined Capital Allocation
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Disciplined Capital Allocation Framework focused on two key metrics: 1. Free cash flow 2 Risk 2. Ri k adjusted dj t d return t Economic environment and capital size considerations Portfolio management approac
Slide 10: Profitable Production
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 Profitable Production Gold production of ~8 M oz by 2016(1) Copper production of ~600 M lbs by 2015 High-quality, profitable production Improved free cash flow and rates of return (1) Production is inclus
Slide 11: Footnotes
BARRICK GOLD CORPORATION CIBC Institutional Investor Conference Whistler | January 2013 CIBC 16th Annual Whistler Institutional Investor Conference January 23, 2013 21 Footnotes 1. Adjusted net earnings, EBITDA, adjusted operating cash flow, gold total and net cash costs per ounce, gold total cash m