Tertiary Minerals plc · LSE:TYM

Tertiary Minerals — Shareholder Meeting (February 2014)

24 slides from Tertiary Minerals's shareholder meeting presentation, Feb 19, 2014

  1. Slide 1: Building a Strategic Position in the Fluorspar Sector

    Building a Strategic Position in the Fluorspar Sector Company Presentation AGM February 19th 20141

  2. Slide 2: Disclaimer

    Disclaimer The content of information contained in these slides and the accompanying verbal presentation (together, the “Presentation”) has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (“FSMA”). Reliance upon this Presentation for the pu

  3. Slide 3: Senior Management

    Senior Management 4 5 1 2 3 • Geologist 1. Patrick Cheetham • Company Founder, 26 years in public mineral company management Executive Chairman • Founder Dragon Mining Ltd, Archaean Gold NL & Sunrise Resources plc • Chartered Engineer 2. Richard Clemmey • 20+ years experience in managing and develop

  4. Slide 4: Company Aims, Strategy and Business Plan

    Company Aims, Strategy and Business Plan The Opportunity • Fluorspar is an essential raw material in the chemical, steel and aluminium industries and in a growing number of high-tech green technologies and pharmaceutical applications • Fluorspar has a growing economic and strategic importance; ranke

  5. Slide 5: Fluorspar Market

    Fluorspar Market The Fluorine Supply Chain • Fluorspar is the commercial name for concentrates of the mineral Fluorite, CaF2 • Fluorite is the main industrial source of Fluorine, F Fluorocarbons - 2.16 Mt/year e.g. refrigerants Fluoropolymers Hydrogen Fluoride HF e.g. lithium batteries 40% - 2.6 Mt/

  6. Slide 6: Fluorspar Market Dynamics

    Fluorspar Market Dynamics • China produces >50% of the worlds fluorspar China Acidspar Export vs Internal Consumption 2005 - 2012 (t) • The price of acid-spar has increased >3 fold since 2000 2500000 • Chinese exports have declined substantially 2000000 since 2000 • China may become a net importer i

  7. Slide 7: Storuman Fluorspar Project

    Storuman Fluorspar Project Excellent Location & Infrastructure • Adjacent to the main E12 highway • Storuman town and new bulk rail terminal – 25 km • Road and rail linked to Umeå Port – 240 km Umeå Lars Lind 7

  8. Slide 8: Storuman Fluorspar Project: Geology

    Storuman Fluorspar Project Geology • Horizontally bedded, replacement style mineralisation in “Upper” and “Lower” Zones • Mineralisation up to 20m thick Pink Fluorspar Mineralisation in the “Lower” Horizon Drill Core 8m Glacial Till Var. Shale 1m Transition unit Surface Topography 10m “Upper” quartz

  9. Slide 9: Storuman Fluorspar Project: Positive Scoping Study

    Storuman Fluorspar Project Positive Scoping Study • Completed by Scott Wilson • Mineral Resource increased post • Process flow sheet completed by Delta Minerals Scoping Study • Robust economics • Bulk rail terminal constructed post Scoping Study Base Case Tonnage/grade in pit (non- 18mt @12.3% Fluor

  10. Slide 10: Storuman: Medium Scale Global Producer

    Storuman Fluorspar Project Medium Scale Global Producer Storuman vs Leading Producers 2012 1,200,000 Production rate of 103,000tpa: 1,000,000 • Medium Scale Global Producer 800,000 • Production (t) A Leading European Producer 600,000 • Resource base will support future expansion 400,000 200,000 0 So

  11. Slide 11: Storuman: Drilling and JORC Mineral Resource Estimate

    Storuman Fluorspar Project Drilling (2010) & JORC Mineral Resource Estimate (SRK 2011) • 46 diamond core drill holes • Waste:ore strip ratio reduced • 28% increase in resource compared with Scoping Study • 2.2t:1t to 0.8t:1t Classification Million Tonnes (Mt) Fluorspar (CaF2%) Indicated 25 10.28 Inf

  12. Slide 12: Storuman: Mining and Processing

    Storuman Fluorspar Project Mining and Processing • Low waste : ore ratio and horizontal ore horizons with no fluorspar mineralisation in the granite basement lends itself to cut and fill mining technique (progressive restoration) • Processing method is common in the mining industry – not bespoke Ope

  13. Slide 13: Storuman: 2013 Milestones and 2014 Targets

    Storuman Fluorspar Project 2013 Milestones • Critical two year Environmental Baseline Studies – completed • Reindeer Husbandry Impact Analysis – completed • Preliminary Feasibility Study (PFS) metallurgical testwork - nearing completion • Preparation of Exploitation (Mine) Permit application – parti

  14. Slide 14: MB Fluorspar Project: Nevada

    MB Fluorspar Project Nevada - Most Favourable Mining Jurisdiction in the USA • Located 14km SW of Eureka, Eureka County, Nevada • Trans-national road and rail links, rail 161 km from the project location • 780 km to port of San Francisco • Road access to and over property • Government land – no spec

  15. Slide 15: MB Fluorspar Project: 2013 Milestones

    MB Fluorspar Project 2013 Milestones • Independent Tonnage-Grade Estimate classified as an Exploration Target under JORC Classification Million Tonnes (Mt) Fluorspar (CaF2%) Exploration Target (8% CaF2 cut-off) 85 to 105 9 to 11 Exploration Target (2% CaF2 cut-off) 395 to 615 5 to 7 • Phase 1 drilli

  16. Slide 16: MB Fluorspar Project: 2014 Drilling Results to Date

    MB Fluorspar Project 2014 – Drilling Results to Date • Phase 2 Drilling Results - Southern Area  Results received for 12 out of the 14 holes  Thick intersections of fluorspar  Open at depth and in all directions  Confirms potential for definition of a substantial Mineral Resource • Phase 2 Drill

  17. Slide 17: MB Fluorspar Project: 2014 Target Milestones

    MB Fluorspar Project 2014 – Target Milestones • Results for the balance 6 holes • JORC Mineral Resource Estimate – Q1 2014 • Metallurgical testwork followed by Scoping Study – end 2014 Open Open 17

  18. Slide 18: Lassedalen Fluorspar Project

    Lassedalen Fluorspar Project Excellent Location & Infrastructure • 500m from highway E134 & Railway • 6km from famous silver mining town of Kongsberg • 50km from Port of Drammen • 80km SW of City of Oslo 18

  19. Slide 19: Lassedalen: History and Geology

    Lassedalen Fluorspar Project History and Geology • Steeply dipping fluorspar vein system in 4 km long vein breccia zone • Drilled by Norsk Hydro in the 1970’s – 28 diamond holes • Proved vein over 2.7km strike length • Open at depth and along strike 19

  20. Slide 20: Lassedalen: Milestones Achieved

    Lassedalen Fluorspar Project Milestones Achieved • JORC Mineral Resource Estimate (SRK Consulting) – 2012 • Re-logged and sampled 3.5 km of drill core from 23 of the 28 diamond holes drilled in the 1970’s Classification Million Tonnes (Mt) Fluorspar (CaF2%) Inferred 4 24.6 • Scoping Study (Wardell A

  21. Slide 21: Fluorspar Project Timetable

    Fluorspar Project Timetable Fluorspar Projects - Indicative Schedule Storuman 2014 Q1 Q2 Q3 Q4 Pre-Feasibility Study (PFS) Metallurgical Testwork Complete Scoping Study evaluation followed by full Pre-Feasibility Study (PFS) Complete Exploitation (Mining) Permit Submit Environmental Permit Submit ?

  22. Slide 22: Other Projects

    Other Projects Non-Core Projects • Kaaresselkä - Kiekerömaa - Gold, Finland  Kaaresselkä licence renewal granted in March 2013  Re-evaluating historic exploration results • Rosendal Tantalum Project, Finland  Evaluating production opportunities and how best to valorise the project • Ghurayyah Tan

  23. Slide 23: Investment Case

    Investment Case • Broker research suggest shares are undervalued BROKER RESEARCH - Price Targets • Tertiary Minerals plc is the only UK public traded Cantor Fitzgerald 16p per share 20 Aug company offering an exciting exposure to looming Europe 2013 fluorspar market shortage VSA Capital 21p per shar

  24. Slide 24: Thank You for Your Time and Support

    Building a Strategic Position in the Fluorspar Sector THANK YOU FOR YOUR TIME AND SUPPORT This presentation is available on our website: www.tertiaryminerals.com For further information please contact: Nominated Adviser & Joint Broker Joint Broker Public Relations Tertiary Minerals plc Cantor Fitzge

Tertiary Minerals — Shareholder Meeting (February 2014) on 6ix