  1. Slide 1: Largest & Diversified North American Focused Uranium Company

    LARGEST & DIVERSIFIED NORTH AMERICAN FOCUSED URANIUM COMPANY Corporate Presentation – June 2024 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  2. Slide 2: Disclaimer

    Disclaimer Statements contained in this presentation which are not historical facts are forward-looking statements that involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Factors that

  3. Slide 3: Fundamentals Favor Significant Price Appreciation

    Fundamentals Favor Significant Price Appreciation Prices Still Well Below Previous Highs Spot Daily Long Term $160 $138.00 $85.00(1) $140 (2) 2005: $80.00 $120 Major Mine Disruptions (Cigar Lake, McArthur $70.00 US $/lb U308 River) $100 2011: Fukushima event $80 $60 $40 Financial Crisis $20 Nov 2016

  4. Slide 4: Reactor Demand Significantly Exceeds Primary Production

    Reactor Demand Significantly Exceeds Primary Production U.S. = Largest Demand for Uranium 2024 Global (1) 2024 U.S. Demand Projected at 47.2 M lbs.(2) Demand expected ~ 197 M lbs. Russia, Kazakhstan, & Uzbekistan Supplies 48% of U.S. Uranium Demand Production expected ~ 155 M lbs. 450 Demand- Call t

  5. Slide 5: Nuclear Power Strategically Positioned to Fill Data Center Energy Demand

    Nuclear Power Strategically Positioned to Fill Data Center Energy Demand The AI Boom Will Require Large Increases in Electricity Generation ▪ Data Center Energy Demand is growing with large power requirements; a hyperscaler’s data center can use as much power as 80,000 households ▪ In the U.S market

  6. Slide 6: Russian Uranium Imports Ban Has Been Signed Into Law

    Russian Uranium Imports Ban Has been Signed Into Law- DOE Directing $3.4B to Ramp Up Domestic Uranium Fuel Production May 13, 2024 – President Biden signs into law the “Prohibiting Russian Uranium Imports” Act (H.R. 1042), which prohibits the importation of unirradiated, low-enriched uranium that is

  7. Slide 7: US Senate Passes Bill S.870

    US Senate Passes Bill S.870 - Awaiting President Biden’s Signature to be Signed Into Law June 18, 2024 – The US Senate unanimously passes Bill S.870, which includes the “Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy” (ADVANCE) Act by a vote of 88 to 2 ✓ This overwhelmingly

  8. Slide 8: UEC U.S. Production Restarting August 2024 - 100% Unhedged

    UEC U.S. Production Restarting August 2024 - 100% Unhedged, Full Spot Market Exposure Fastest Growing North American Uranium Company Approx $900 Million Rosatom’s U1 Americas, UEX, Rio Tinto’s Roughrider Project, Accretive Acquisitions(1) Rio Tinto, and physical uranium portfolio initiated at $27/lb

  9. Slide 9: Disciplined Growth Strategy

    Disciplined Growth Strategy Acquisitions through the bottom of the Uranium Cycle UEC Acquisition Timeline and Uranium Spot Price(1) ($/lb) $110.00 Recent $100.00 U3O8 Price: $85.50/lb $90.00 UEC Acquisitions since 2017 at uranium $80.00 prices ranging from $20 to $45 per pound $70.00 $60.00 $50.00 S

  10. Slide 10: Total Resources of 230.0 M lbs. U3O8 as M&I and 102.7 M lbs. Inferred

    Total Resources of 230.0 M lbs. U3O8 as M&I and 102.7 M lbs. U3O8 as Inferred Largest, Diversified Resource Base in the Western Hemisphere Saskatchewan Portfolio (S-K 1300 compliant)(2) Nunavut Attr. Resources (M lbs.) Project Name M&I Inferred Hub and Spoke ISR Portfolio (S-K 1300 compliant)(1) Sas

  11. Slide 11: Creating Value by Delivering on a Production Pipeline

    Creating Value by Delivering on a Production Pipeline 332.7 Million lbs. (230.0 M&I / 102.7 Inf.)(1) Resource Expansion Advanced Production Restarting UEC-Operated Athabasca Joint Athabasca Projects Ventures 65.3 Mlb. M&I 44.6 Mlb. M&I 52.9 Mlb. Inf. 18.2 Mlb. Inf. Wyoming Hub & Spoke ISR Portfolio

  12. Slide 12: Emerging U.S. Government and SMR Demand for American Uranium

    Emerging U.S. Government and SMR Demand for American Uranium UEC and TerraPower announce a memorandum of understanding UEC wins award from the U.S. Department of Energy to supply 300,000 lbs. (“MOU”) with the objective of reestablishing domestic supply chains of U3O8 to the strategic uranium reserve

  13. Slide 13: Production Restarting in Wyoming, August 2024

    Production Restarting in Wyoming, August 2024 7 Fully Permitted Projects in Texas and Wyoming Wyoming Hub & Spoke Texas Hub & Spoke ISR Portfolio ISR Portfolio Irigaray Processing Plant Hobson Processing Plant Licensed Production Capacity of 2.5 M lbs./yr Licensed Production Capacity of 4 M lbs./yr

  14. Slide 14: In-Situ Recovery (ISR) Overview

    In-Situ Recovery (ISR) Overview Low Cost & Environmentally Friendly Watch In Situ Recovery how the (ISR) Technology works Watch how the In Situ Recovery (ISR) Technology works Click Here Click Here URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  15. Slide 15: UEC Acquires Uranium One Americas for $112 Million Cash

    UEC Acquires Uranium One Americas for $112 Million Cash Transformative Acquisition Creating America’s Leading Uranium Mining Company Highly Accretive Positioned to lead Proven Production Resource Transaction resurgence of U.S. with Significant Past Expansion uranium production Investment Potential •

  16. Slide 16: Irigaray & Christensen Ranch – Production Restarting August 2024

    Irigaray & Christensen Ranch – Production Restarting August 2024 Licensed Capacity of 2.5 M lbs. Per Year (Plans to increase to 4 M lbs./year licensed capacity) 15.50 M lbs. Indicated and 0.14 M lbs. Inferred U3O8 Resources(1) August 2024 Production Restart expected to be fully funded with cash on h

  17. Slide 17: Reno Creek ISR Project

    Reno Creek ISR Project The largest permitted, pre-construction ISR uranium project in the U.S. 26 M lbs. M&I | 1.5 M lbs. Inferred U3O8(1) • 50 miles by road from Irigaray Central Processing Plant • Licensed for 2 M lbs./year • Significant CAPEX savings expected • Considerable ISR exploration and ex

  18. Slide 18: Ludeman ISR Project

    Ludeman ISR Project Permitted, Construction Ready 9.7 M lbs. M&I | 1.3 M lbs. Inferred U3O8(1) Irigaray North Butte Christensen Ranch Cameco • Most of the project area was held by Power Resources (Cameco) until 2003, after which Energy Metals (precursor to U1A) acquired the properties Moore Ranch •

  19. Slide 19: Moore Ranch ISR Project

    Moore Ranch ISR Project Permitted, Construction Ready 3.21 M lbs. M&I | 0.04 M lbs. Inferred U3O8(1) • Fully permitted for 3 M lbs./yr full processing plant, although will be constructed and operated as a satellite to Irigaray CPP • Delineation drilling and wellfield pattern design complete • Past p

  20. Slide 20: Texas Hub & Spoke Production Strategy

    Texas Hub & Spoke Production Strategy 20 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  21. Slide 21: Hobson CPP is fully licensed and permitted 4 M lbs./year

    Hobson CPP is fully licensed and permitted 4 M lbs. /year Licensed Production Capacity 21 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  22. Slide 22: Burke Hollow ISR Project, South Texas

    Burke Hollow ISR Project, South Texas The Newest & Largest ISR Wellfield Being Developed and Discovered in the U.S. June 2024: Successful delineation drilling increased Burke Hollow’s Measured and Indicated (“M&I”) resources from 2,324,000 lbs U3O8 to 6,155,000 lbs ✓ Drilling at PA-3: Discovered Jun

  23. Slide 23: Burke Hollow ISR Project, South Texas

    Burke Hollow ISR Project, South Texas • Discovery of seven trends since 2012 • Leach amenability testing indicates recovery >90% Advancing Towards • ~20,000 acres Uranium Extraction • ~50 miles from Hobson CPP • 50% of the property unexplored or under current exploration and delineation drilling • M

  24. Slide 24: Palangana ISR Mine

    HOBSON Palangana ISR Mine Goliad First Producing Mine Proof of Concept Salvo Longhorn Burke Hollow July 2023: Advancing the fully permitted, past producing Palangana project for production re-start Corpus Christi ✓ Drilling commenced at Production Area-4 (PA-4) ✓ 30 delineation holes completed, guid

  25. Slide 25: Scaling Up in Canada's High-Grade Athabasca Basin

    Scaling Up in Canada’s High-Grade Athabasca Basin After Cameco and Orano, UEC now controls the largest diversified resource base, hosted in multiple assets in Canada’s Athabasca and Thelon Basins Attributable M&I 109.9 M lbs. U3O8 Resources (1) Attributable Inferred 71.0 M lbs. U3O8 Resources (1) La

  26. Slide 26: UEC Acquired Roughrider Project from Rio Tinto

    UEC Acquired the World-Class Development-Stage Roughrider Project from Rio Tinto Total Consideration of $146.2 million ($82.1 M in Cash and $64.1 M in UEC Stock)1 • New S-K 1300 resource estimate(2) • 27.8 M lbs. Indicated resources grading 3.25% U3O8 in 389,000 tonnes and 36.0 M lbs. Inferred resou

  27. Slide 27: Advancing the Roughrider Project

    Advancing the Roughrider Project 100% Owned, High Grade, Advanced Uranium Project, near Licensed Toll Millings Jan 2024: UEC Intersects 6.28% eU3O8 Over 2.9 metres in a 25 metre Step Out from the Roughrider East Zone Deposit(1) • Exploration Drilling Extends Potential of East Zone Deposit • Metallur

  28. Slide 28: UEC Acquired Canadian Uranium Exploration Projects from Rio Tinto

    UEC Acquired A Portfolio of Canadian Uranium Exploration Projects from Rio Tinto Total Consideration of C$1.5 million Cash1 • 60% in the Henday JV Project • 100% of the Milliken Project • 100% in the Carswell Project • UEC’s Athabasca land portfolio of 1,136,083 acres (459,757 Ha) for exploration an

  29. Slide 29: UEC Advancing Christie Lake

    UEC Advancing Christie Lake New High-Grade Deposit Along Trend From McArthur River • Christie Lake is the only exploration project not controlled by Cameco and Orano along McArthur River – Cigar Lake Corridor • 20.35 M lbs. U3O8 in three existing deposits before the discovery of Sakura Zone in 2022

  30. Slide 30: Christie Lake 2023 Program

    Christie Lake 2023 Program Focused on Expanding Sakura Zone • Sakura represents new mineralization that exploits a new trend at Christie Lake • Primary focus was follow-up & expansion of new Sakura Zone mineralization • First hole of 2023 winter program intersected 23.2% eU3O8 over 3.4 m, follow-up

  31. Slide 31: Strong Joint-Venture Partnerships

    Strong Joint-Venture Partnerships Established Uranium Miners as Operators Allows UEC to Focus on Growth Shea Creek – ~50.9% Owner and Operator Millennium – 69.9% Owner and Operator Kiggavik – ~66.2% Owner and Operator Millennium is a Feasibility Study stage project located Shea Creek between Cameco’

  32. Slide 32: U.S. Conventional Mining

    U.S. Conventional Mining Anderson Project – Arizona A Large U.S. S-K 1300 Compliant Resource(1) Resource ▪ Indicated Resource: 32.05 M lbs. within 16.17 Mt, avg. grade of 0.099% 8,268 Acres Project located ~75 miles northwest of Phoenix, AZ Between 1955-1958 with ~$40M spent by previous operators, i

  33. Slide 33: UEC At a Glance

    UEC At a Glance Member of the Russell 2000® Index Cash, Equity(1) and $303.3 million, no debt Inventory Holdings (2) UEC Team, Blackrock, Vanguard Group, State Average Daily Traded $52.5M Street, Fidelity, Norges Bank, Northern Trust, Value - 6 months(3) Top Shareholders UBS, CEF Holdings, Sprott, K

  34. Slide 34: Physical Portfolio - North American Warehoused Uranium

    Physical Portfolio - North American Warehoused Uranium Bolsters UEC balance sheet and provides strategic inventory Spot market sales of FY 2023 3,150,000 (YE July 31, 2023) pounds of uranium Gross Profits of $49.60 $163.95 Million million Record Revenue from spot uranium market Weighted sales(1) Ave

  35. Slide 35: Years of Combined Experience in the Uranium Industry

    865 Years of Combined Experience in the Uranium Industry Amir Adnani Spencer Abraham Scott Melbye Brent Berg Donna Wichers President, CEO, Director Chairman, Board of Directors Executive Vice President Senior VP of U.S. Operations VP of Wyoming Operations An entrepreneur, founding CEO of Served as a

  36. Slide 36: Uniquely Positioned with 100% Unhedged Production and Significant Growth Pipeline

    Uniquely Positioned with 100% Unhedged Production and Significant Growth Pipeline ▪ Wyoming Production Restarting August 2024 ▪ Two Central Processing Plants in Wyoming and Texas with the largest resource base of fully permitted ISR projects of any U.S. based producer ▪ Advancing the High-grade Roug

  37. Slide 37: ISR District Opportunity in Paraguay

    ISR District Opportunity in Paraguay Similar geology as South Texas and leveraging ~$50M of historic exploration work by Anschutz and Cameco, including new work completed by UEC. Project Historic Operator Stage SK-1300 Resource (M lbs) Yuty Cue Resources / Exploration / 8.96 M lbs. in 9.074 Mt gradi

  38. Slide 38: World-Class High Titania Slag Project

    World-Class High Titania Slag Project World-class ilmenite deposit • Large High-Grade Resource ~ 3.6 billion tonnes grading 7.3% TiO2 • Surface deposit, extensive lateral grade and consistency • Base case 150ktpa slag utilises < 0.2% of Regional Resource per year Amongst the Highest-grade & Largest

  39. Slide 39: S-K 1300 Exceptional Indicative Economic Highlights

    S-K 1300 Exceptional Indicative Economic Highlights Base Case Stretch Case 150ktpa high titania slag & 500ktpa high titania slag & 100ktpa pig iron 320ktpa pig iron NPV8% US$419m Post-Tax US$1,554m 21% IRR 25% 4.7 years Real, Post-Tax Payback 4.2 years 23 years < 4.2% Regional resource used < 14.5%

  40. Slide 40: Emergence of a World-Class High Titania Slag Producer

    Emergence of a World-Class High Titania Slag Producer Exceptional Progress to Date 2008-2011 2012-2015 2016-2019 2020-2023 2008 – Discovered Mintek Smelter test TiO2 slag Optioned by UEC TZMI TRS & Economic Pilot Plant & HMC production PEA & NI 43-101 Resource Revised NI 43-101 Resource Analysis Str

  41. Slide 41: Alto Paraná Titanium Development Strategy

    Alto Paraná Titanium Development Strategy Salient Points Low-cost hydro mining and ▪ Fully integrated and powered by renewable energy progressive rehabilitation ▪ Low-cost mining operation ▪ Proven conventional process producing an ilmenite smelter feed ▪ Arc furnace/s to produce a high titania slag

  42. Slide 42: Investing in UEC Supports ESG Goals and a Low Carbon Future

    Investing in UEC Supports ESG Goals and a Low Carbon Future Nuclear is the largest carbon-free electricity To achieve net zero by 2050, source in the U.S., uranium is fueling ~18% of the world needs nuclear4 total electricity produced today1 This is equivalent to removing the Leading research instit

  43. Slide 43: Nuclear Energy

    Nuclear Energy Clean, Safe, Reliable & Economic Perfect Compliment to Renewable Wind and Solar Saves Lives and Improves Quality of Life 43 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  44. Slide 44: Tripling of Nuclear Energy by 2050

    Tripling of Nuclear Energy by 2050 – 44 A Historic Pledge Announced at COP28 for Global Expansion Led by the U.S. 440 60 70 435 Operable Reactors Units Under New Reactors Connected Reactors Planned and Proposed Worldwide* Construction* since 2014** Worldwide1 CHINA Government is expected to approve

  45. Slide 45: America Leads Global Nuclear Energy Production

    America Leads Global Nuclear Energy Production The World Produced 2653 TWh of Nuclear Energy in 2022, Generating 9% of Global Electricity Supply Source: Voroniapp.com 45 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  46. Slide 46: Nuclear Power is Critical to U.S. Energy

    Nuclear Power is Critical to U.S. Energy Largest Source of Carbon-Free Power Generation and Electricity – Provides ~20% of U.S. Electricity Supply Virtually No U.S. Uranium Production - Despite operating the world’s largest nuclear reactor fleet Biden Administration Wants and is Receiving Congressio

  47. Slide 47: Reversal of Early Retirements - Plant Life Extensions - Uprates

    Reversal of Early Retirements - Plant Life Extensions - Uprates • Nuclear phase-outs or reductions are being abandoned • License renewals – Operational extensions to 80 years • Power uprates – Equivalent to 8 new, large-scale reactors in the U.S. alone 47 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | U

  48. Slide 48: Global Approval for Nuclear Power Continues to Grow

    Global Approval for Nuclear Power Continues to Grow EU Taxonomy Includes Nuclear as an Environmentally Sustainable Investment 48 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM Source: U.S. Energy Information Administration; Orano Group

  49. Slide 49: Nuclear Emits the Lowest CO2 Emissions Over Lifecycle

    Nuclear Emits the Lowest CO2 Emissions Over Lifecycle of a Power Plant Source: TradeTech Uranium Market Study 2023: Issue 3 49 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  50. Slide 50: Nuclear Power = Safest Form of Electricity Generation

    Nuclear Power = Safest Form of Electricity Generation “Nuclear energy is the safest of all the electricity technologies we have.” - Patrick Moore, former director of Greenpeace(1) © 2019 Source: World Nuclear Association – Harmony Program (1) Nuclear NewsWire July 13, 2022 50 URANIUM ENERGY CORP | N

  51. Slide 51: 2022 Polar Vortex – Nuclear Reliability at 93%

    2022 Polar Vortex – Nuclear Reliability at 93% Nuclear 92.6% Capacity Factor by Natural Gas 61.7% Energy Source in 2022 Coal 49.3% Hydropower 37.4% Wind 36.1% Solar 24.8% Source: Stout bit.ly/3Qrop2v 51 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  52. Slide 52: Nuclear Power = Lowest Levelized Cost of Electricity

    Nuclear Power = Lowest Levelized Cost of Electricity For Extended Life Plants vs any Other Source Most nuclear plants in the U.S. have or will extend their operational lives by at least 20 - 40 years1 80 years Second license renewals will extend carbon-free production to 80-years3 more than 3x the u

  53. Slide 53: Support for Nuclear Energy is Strong and Increasing

    Support for Nuclear Energy is Strong and Increasing Public favors nuclear for reliability, clean air, energy security, energy independence Favorability to Nuclear Energy 1983-2024 • 77% of the public favored nuclear energy Public Support for Nuclear Energy Stays at Record Level For Fourth Year in a

  54. Slide 54: Small Modular Reactor (SMR) An Important Emerging Market

    Small Modular Reactor (SMR) An Important Emerging Market Small Modular Reactors (SMR’s) 300 SMRs (99 GWe of nuclear power) expected to be Scalable, factory-built, smaller footprint, added to the U.S. grid over the next 25 years - would double today’s U.S. nuclear output, NEI recent Chief Nuclear Off

  55. Slide 55: Utility Procurement Cycle: Old Contracts Rolling Off

    Utility Procurement Cycle: Old Contracts Rolling Off…New Contracts Need to be Signed 1.24 Billion Pounds of Contracting needed by 2035! Utility Uncommitted Demand Historic Long-Term Contracting Source: UxC Market Outlook Q2 2024 55 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  56. Slide 56: Bottom Line - Positive Market Outlook

    Bottom Line - Positive Market Outlook ✓ Carbon Free Energy Goals – Renewed focus on the Clean, Safe, Reliable Energy Nuclear Power provides is prompting new reactor development and programs around the world. ✓ Demand Growth – 68 reactors added to the grid in the past 10 years; 61 under construction,

  57. Slide 57: Appendix

    Appendix 57 URANIUM ENERGY CORP | NYSE AMERICAN: UEC | URANIUMENERGY.COM

  58. Slide 58: The Environmentally Friendly In-Situ Recovery Method

    The Environmentally Friendly In-Situ Recovery Method VISIT OUR WE BSITE ISR is considered considerably more environmentally friendly compared to alternative, traditional mining approaches, as the ISR FOR MORE INFORMATION process does not require blasting or waste rock movement, resulting in less dam

  59. Slide 59: UEC's Role in the Nuclear Energy Value Chain

    UEC's Role in the Nuclear Energy Value Chain In-Situ Recovery Enrichment Reactors Electrical Users Uranium ore is extracted from the ground. UEC uses the cost- The utility that purchases our Nuclear reactors, which use the End users receive safe, effective and environmentally friendly in-situ recove

  60. Slide 60: UEC is a Sustainability Leader

    UEC is a Sustainability Leader ▪ UEC has the lowest reported carbon intensity of uranium mining companies, with 39.06 lbs CO2e / lb of yellowcake ▪ UEC holds the leading Sustainalytics and ISS Quality Score ESG ratings amongst uranium mining companies assessed ▪ UEC is ranked in the 95th percentile

  61. Slide 61: An Industry Leader in Sustainability

    An Industry Leader in Sustainability Governance Enhanced diversity on UEC’s Board of Directors achieving 33% 67% 100% Zero 3 3 % female Female Directors Ethnically diverse members Employees confirmed adherence with Whistleblower or representation and 67% on the Board of Directors. UEC's Code of Busi

  62. Slide 62: The Road to Net-Zero

    The Road to Net-Zero We believe nuclear energy willcontinueto be an importantpart of theenergy transitionand low carbon economy.As such,we are focused onscaling our business tomeet thefuture energy needs fornuclear intheU.S. andglobally. Further, we recognize the critical natureofthe fightagainst cl

  63. Slide 63: UEC U.S. and Paraguay Resource Summary

    UEC U.S. and Paraguay Resource Summary(1) Measured Resources Indicated Resources M+I Inferred Exploration Target Historic** PROJECTS Tons Grade lbs. U3O8 Tons Grade lbs. U3O8 lbs. U3O8 Tons Grade lbs. U3O8 Tons Grade lbs. U3O8 Tons Grade lbs. U3O8 ('000) (% U3O8) ('000) ('000) (% U3O8) ('000) ('000)

  64. Slide 64: Canadian Attributable Resource Summary

    Canadian Attributable Resource Summary S-K 1300 Resources (1) Project Indicated Resources Inferred Resources Tonnes Grade M lbs. Tonnes Grade M lbs. (000's) (% U3O8) U3O8 (000's) (% U3O8) U3O8 Roughrider 389 5.91 27.84 359 8.36 36.04 Christie Lake - - - 488 1.57% 16.84 Horseshoe-Raven 10,353 0.16% 3

  65. Slide 65: Uranium Energy Corp Contact

    URANIUM ENERGY CORP Toll Free: (866) 748-1030 info@uraniumenergy.com www.uraniumenergy.com Corporate Office 500 North Shoreline Ste. 800N Corpus Christi, TX 78401 Tel: (361) 888-8235 Fax: (361) 888-5041 Investor Relations: Bruce J. Nicholson President and CEO: Amir Adnani Executive Vice President Sc