Kenadyr Mining Corp

Kenadyr Mining — Investor Presentation (December 2019)

23 slides from Kenadyr Mining's investor presentation, December 2019

  1. Slide 1: Corporate Presentation

    TS X- V: KEN C O R P O R AT E P R E S E N TAT I O N

  2. Slide 2: Disclaimer

    2 Disclaimer This presentation, and the information contained herein, is not for release, distribution or publication into or in the United States or any other jurisdiction where applicable laws prohibit its release, distribution or publication. This presentation (“Presentation”) is being issued by

  3. Slide 3: Investment Highlights

    3 Investment Highlights ❖ Kenadyr Mining Corp holds a 100% interest in the 164 km 2 Borubai exploration license in the Kyrgyz Republic. ❖ The license encircles Zijin’s Taldybulak Levoberejnyi Mine (“TBL” mine) which is newly built and producing with a cap cost of $296 million, it contains 3.2M oz Au

  4. Slide 4: The Borubai Gold Project

    4 The Borubai Gold Project Kyrgz Republic, Central Asia TSX-V: KEN

  5. Slide 5: The Borubai Project

    5 The Borubai Project ❖ Located in the Kyrgyz Republic in Central Asia ❖ 100% interest ❖ 164km2 Exploration License ❖ Encircles Zijin’s Taldybulak Levoberejnyi Mine (TBL Mine), a newly built and producing mine containing 3.2M oz in reserves and resources at a Above: Zijin’s producing Taldybulak Levo

  6. Slide 6: Borubai shares a connecting deposit with a producing high grade gold mine

    6 Borubai shares a connecting deposit with a producing high grade gold mine. TSX-V: KEN

  7. Slide 7: Surrounding Zijin

    7 Surrounding Zijin Historic Unclassified Resources on the Borubai License (based on Soviet drilling, based on a cut-off grade of Au 1.0 g/t) C1 + C2: 1.8M oz Au @ 2.3 g/t – 3.6 g/t P1: 5.2M oz Au @ 3.4 g/t – 4.7 g/t High Grade South Zone alone contains a historic unclassified Soviet Resource Estima

  8. Slide 8: Zijin: Investing in the World's Highest Quality Projects

    Zijin: Investing in the World’s Highest 8 Quality Projects 2011 ❖ Zijin purchases 60% of the Talybulak Levoberejnyi (TBL) Project in Kyrgyz Republic for USD$66M and subsequently spends USD$296M on mine construction; current producer 2015 ❖ Zijin purchases 50% of Barrick’s Porgera Mine for USD$298M ❖

  9. Slide 9: Location

    9 Location Borubai License ❖ The project area lies 100 km away along a major highway from Bishkek, capital of the Kyrgyz Republic. ❖ The area has well developed infrastructure with 2 lines of high-voltage power grid and access roads to all prospects. ❖ The license is at foothill area with low altitu

  10. Slide 10: Map

    10 ae LEGEND ee Bona teense rea (9 Orewa Rare Ear MG wa J Eerema cone Pb SS Oriled mineralized zones arcund TAL: cemeees Highway Bishiex-China erat no 10km PETRY Ce cata) —— rata A (22 Rian ode showings Ngh-otage power ines \y MINING CORP.

  11. Slide 11: Geology

    11 Geology ❖ The main rock types in the project area are Lower Proterozoic amphibolite, gneiss and mica schist intruded by a sub-volcanic complex of Carboniferous to Permian (C3) diorites to monzonites, which are considered to be almost synchronous with mineralization and genetically and spatially a

  12. Slide 12: Map

    12 Map Kenadyr Mining’s South Zone has a historic unclassified resource of 900,000 oz Au @ 8.3 g/t (based on a cutoff of 4.0 g/t) TSX-V: KEN

  13. Slide 13: Soviet Drilling at Borubai

    13 Soviet Drilling at Borubai ❖ Kenadyr has a complete database from 410 drill holes (including drilling at the TBL Deposit) ❖ 139 holes (81,000m) were drilled on the Borubai License TBL Zijin adjacent to the TBL Mine Mining ❖ Soviet drilling showed that the TBL mineralization continues Surrounded b

  14. Slide 14: The South Zone

    14 The South Zone ❖ High-grade mineralized zone extending along the South border of Zijin’s TBL license ❖ Unclassified historic resource of 900,000 oz Au @ 8.3 g/t (using a cut-off grade of 4.0 g/t) ❖ Based on Soviet drilling (24 holes) TSX-V: KEN

  15. Slide 15: The East Zone

    15 The East Zone ❖ Gold mineralization at shallow depth ❖ Mineralization intersected by both Soviet drill holes and an adit driven from the TBL Deposit ❖ Thick mineralized zones ❖ Possible open-pit mineable target TSX-V: KEN

  16. Slide 16: The West Zone

    16 The West Zone ❖ Located immediately west of TBL mine. Gold mineralization extends over 500m and was intersected in 11 Soviet core drill holes TSX-V: KEN

  17. Slide 17: Soviet and Malaysian Drill Holes

    17 Soviet and Malaysian Drill Holes TSX-V: KEN

  18. Slide 18: Potential to Increase the Size and Grade: Core Recovery Aspect

    18 Potential to Increase the Size and Grade of the Mineralization: Core Recovery Aspect ❖ Soviet drilling experienced poor core recoveries (40% - 85%; averaging 60%); ❖ Soft mineralized material was preferentially lost during core drilling; ❖ Subsequent drilling at the TBL Mine by Malaysian Mining C

  19. Slide 19: The Tien Shan Gold Belt

    19 The Tien Shan Gold Belt The Tien Shan gold belt bisects the Kyrgyz Republic, it is among the world’s richest – hosting some of the world’s largest mines including Muruntau (170M oz gold) and Kumtor (18M oz). ❖ Centerra Gold – Kumtor: 8.5M oz Au @ 3 g/t remaining (+ 5.2M oz and inferred 1.9m oz un

  20. Slide 20: Chairman and Advisors

    20 R. Stuart (Tookie) Angus, Chairman Dr. Alexander Becker, Advisor Mr. Angus is an independent business adviser to the mining industry. For more than 35 Dr. Becker has a long and distinguished career in mining including acquiring and targeting years, Mr. Angus has focused on structuring and financi

  21. Slide 21: Share Structure

    21 Share Structure As at December 31, 2019 Issued & Outstanding 101,642,413 Warrants 13,448,050 TSX-V: KEN Options 7,120,000 Fully Diluted 122,210,463 Kenadyr began trading on the TSX Venture exchange on March 31, 2017. TSX-V: KEN

  22. Slide 22: Investment Summary

    22 Investment Summary ❖ Highly Experienced Management Team ❖ Large & Strategic Land Package in a World Class Geological Setting ❖ Giant Mine Potential - The Tien Shan Gold Belt Hosts Some of the World’s Largest Gold Mines ❖ Significant Past investment and expenditure advancing the project towards pr

  23. Slide 23: Contact

    23 Contact Investor Relations Head Office info@kenadyr.com 488 – 1090 W. Georgia St. 604-687-7130 Vancouver, BC V6E 3V7 TSX-V: KEN Learn More at www.kenadyr.com

Kenadyr Mining — Investor Presentation (December 2019) on 6ix