Iluka Resources Limited · ASX:ILU

Iluka Resources — Sierra Rutile — FY2015 Earnings Presentation

42 slides from Iluka Resources's earnings presentation, Mar 31, 2016

  1. Slide 1: 2015 Preliminary Results Presentation

    2015 PRELIMINARY RESULTS PRESENTATION 31 MARCH, 2016

  2. Slide 2: Disclaimer

    DISCLAIMER Forward-Looking Information This document may contain forward-looking statements. These forward-looking statements are made as of the date of this document and Sierra Rutile Limited (the “Company”) does not intend, and does not assume any obligation, to update these forward-looking statem

  3. Slide 3: The Sierra Rutile Team

    THE SIERRA RUTILE TEAM Experienced, committed and innovative Robert Edwards John Bonoh Sisay Matthew Hird Wayne Venter Derek Folmer Neil Gawthorpe Chairman Chief Executive Officer Chief Financial Officer Chief Operating Officer Chief Marketing Officer Marketing Director •Over 20 years experience •Si

  4. Slide 4: FY 2015 Highlights

    FY 2015 HIGHLIGHTS Record production(1), guidance achieved and strong financial results in 2015 Operational Performance > Annual rutile production 126Kt – 10% increase YoY (2) > Strong cost controls – 5% reduction in Production Cash Cost YoY > Gangama Dry Mine project on-track and on-budget Financia

  5. Slide 5: Production Profile and Cash Costs

    PRODUCTION PROFILE AND CASH COSTS Production from Gangama Dry Mine raises production capacity in H2 2016 160,000 800 140,000 700 120,000 Production Cash Cost ($/tonne rutile) 600 Annual Rutile Production (tonnes) 100,000 500 80,000 400 60,000 300 40,000 200 20,000 - 100 2011 2012 2013 2014 2015 2016

  6. Slide 6: The Sierra Rutile Story

    THE SIERRA RUTILE STORY Company Highlights Geographic Segmentation(3) PLANT CAPACITY 5 YR PRODUCTION High INFRASTRUCTURE TO PRODUCE CAGR grade 200Kt 13% 94% Titanium feedstock 2ND BIGGEST RUTILE NUMBER OF STAFF 5 YR PRODUCTION CASH COST(2) 95% FROM SIERRA LEONE RESOURCE WORLDWIDE CAGR 8.2Mt 1,481 In

  7. Slide 7: 2015 Preliminary Results: Operations and Gangama Project

    2015 PRELIMINARY RESULTS OPERATIONS AND GANGAMA PROJECT WAYNE VENTER

  8. Slide 8: Operational Performance

    OPERATIONAL PERFORMANCE Achieved upper end of production targets in 2015 2015 Highlights % change Actual 2015 2014 > Record production and guidance achieved / bps > Solid performance from all mining units Ore mined (Kt) 7,984 7,584 5.3 – Dredge produced 155kt HMC Average grade (%) 1.60 1.69 (0.09) –

  9. Slide 9: Health & Safety

    HEALTH & SAFETY Continued strong commitment to improved health & safety performance across the organization and community 2015 Highlights (1) > LTIFR YoY reduction of 26% > Re-launched HSE program across the organisation YoY reduction 2015A > Completed safety re-induction of all employees and in LTI

  10. Slide 10: Community

    COMMUNITY Significant contribution made in 2015 to the local community 2015 Highlights > Significant contribution > Constructed a primary school for the local community > Significant ongoing support towards Sierra Leone’s efforts pre and post Ebola > Local technical college, sponsored by Sierra Ruti

  11. Slide 11: Gangama Construction Update

    GANGAMA CONSTRUCTION UPDATE Gangama project progressing on time and on-budget > Gangama Dry Mine construction remains on-schedule and on-budget: – As of March 28, 2016, $26m of project expenditure incurred with 88% of construction complete > Significant project milestones achieved to date, include:

  12. Slide 12: 2015 Preliminary Results: Sales and Marketing Update

    2015 PRELIMINARY RESULTS SALES AND MARKETING UPDATE NEIL GAWTHORPE

  13. Slide 13: Sales Performance

    SALES PERFORMANCE Deep customer relationships with value placed on premium product 2015 2016 Outlook – Record production volumes sold to long- – In excess of 90% of 2016 maximum targeted standing customers volumes committed – Average realised price YoY decrease of 3% – Supply chain destocking in bot

  14. Slide 14: Market Update

    MARKET UPDATE Deep customer relationships with value placed on premium product Geographic Sales Breakdown(1) Demand Outlook for Sierra Rutile’s Product – Sierra Rutile provides a premium product which it believes enables the company to withstand the challenging market conditions – Sierra Rutile supp

  15. Slide 15: 2015 Preliminary Results: Financial Update

    2015 PRELIMINARY RESULTS FINANCIAL UPDATE MATTHEW HIRD

  16. Slide 16: Financial Highlights

    FINANCIAL HIGHLIGHTS Resilient financial performance > EBITDA margin increased to 15.2% % change KPI’s 2015 2014 / bps > Strong FCF generation demonstrates cash conversion ability Revenue $m 105.8 117.8 (10.2) > Lower sales volumes to protect margins EBITDA(1) $m 16.1 14.8 8.8 > Successful cost cont

  17. Slide 17: Revenue to EBITDA

    REVENUE TO EBITDA Generated EBITDA of $16.1 million despite lower prices and sales volumes Rutile sales volumes of 118 Kt, a 9% decrease YoY Sales volumes: 118 Kt Production volumes: 126 Kt Realised price of $775/t, a 3% decrease YoY 120,000 5,058 On a per unit basis Production Cash Cost(1): $614/t

  18. Slide 18: Production Cash Costs

    PRODUCTION CASH COSTS Reduction in costs remains key focus 800 750 Production Cash Costs 2015(1) 59 48 700 Support and 44 67 infrastructure 650 18 31% Mining 50% $/t - - 51% 600 Fixed 550 643 50% 500 614 Variable 450 Processing 18% 400 2014 Higher ore Contract mining Fuel price Increase rutile Other

  19. Slide 19: EBITDA to Free Cash Flow to Movement in Net Debt

    EBITDA TO FREE CASH FLOW TO MOVEMENT IN NET DEBT Cash flow conversion increased through robust working capital management 30,000 6,762 (978) (4,580) 20,000 (2,795) (26,058) 10,000 16,103 17,307 $‘000 0 (1,005) (12,551) (10,000) (2,795) (20,000) (12,551) (1,005) (30,000) (1) (2) EBITDA Working Capita

  20. Slide 20: 2016 Financial Outlook

    2016 FINANCIAL OUTLOOK Low-cost base and improved financing arrangements create a platform for growth Costs: Capex: Financing: > Production cash costs(1): > Stay-in-business: $5m to $7m > Gangama Senior Loan Facility $540/t to $590/t – First quarterly repayment in > Expansionary: $20m to $22m – Bene

  21. Slide 21: 2015 Preliminary Results: Growth Plans

    2015 PRELIMINARY RESULTS GROWTH PLANS JOHN SISAY / WAYNE VENTER

  22. Slide 22: Market-Led Flexibility

    MARKET-LED FLEXIBILITY Long-term mine plan with flexibility to adapt to customer demand Positioning the Business Into 2016 Market-Led Production Forecast(1) 250,000 > Sierra Rutile expects to become world’s largest primary producer of natural rutile in 2016 200,000 Rutile (tonnes) 150,000 > Market-l

  23. Slide 23: Optimised Long-Term Mine Plan

    OPTIMISED LONG-TERM MINE PLAN Refinement of expansion projects delivering enhanced returns and greater flexibility Gangama Dry Mine Production Forecast(1) > Previously planned second 500tph unit replaced with a 250tph 250,000 bolt-on brownfield plant expansion – Would generate production capacity of

  24. Slide 24: Gangama Dry Mine and Lanti Dry Mine

    GANGAMA DRY MINE AND LANTI DRY MINE Bolt-on expansions provide throughput flexibility and allow for staged capital Revised Near-Term Dry Mining Expansion Plans Gangama + Lanti Bolt-On Expansions vs. Original Gangama > Internal feasibility studies completed New(1) Old(2) % change > Two 250tph bolt-on

  25. Slide 25: Sembehun Dry Mine

    SEMBEHUN DRY MINE Significant improvement of the Sembehun project > Finalised third party PFS by DRA projects (Pty) Sembehun Dry Mine – PFS vs. Scoping Study(1) PFS Scoping % change > Improved flexibility, enabling operation at 500tph or 1,000tph Study(1) depending on market dynamics 1,000tph Throug

  26. Slide 26: 2015 Preliminary Results: Guidance and Outlook

    2015 PRELIMINARY RESULTS GUIDANCE AND OUTLOOK JOHN SISAY

  27. Slide 27: A Strong Track Record of Delivery

    A STRONG TRACK RECORD OF DELIVERY Sierra Rutile has continued to deliver and develop the business despite broader market challenges Deliverable Status When Lanti dry mine constructed on time and on budget  Q3 2012 Mineral Separation Plant capacity increased to 200ktpa  2014 Gangama Dry Mine financ

  28. Slide 28: Guidance and Outlook

    GUIDANCE AND OUTLOOK Gangama Dry Mine production start in Q2 2016 to provide for an inflection point for Sierra Rutile 2016 Guidance Outlook > Market-led business model > Optimisation of brownfield expansion projects - Focusing on maximising profitability of sales - 250 tph bolt-on expansion at Gang

  29. Slide 29: Additional Information

    ADDITIONAL INFORMATION

  30. Slide 30: Investor Highlights

    INVESTOR HIGHLIGHTS  > Tier I natural rutile deposit supporting established mining operations  > Low cost producer generating healthy cash flows  > Transitioning to a highly flexible and capital-efficient operation through dry mining expansions  > Unlocking value through the construction of Gang

  31. Slide 31: Sembehun Dry Mine Pre-Feasibility Study

    SEMBEHUN DRY MINE PRE-FEASIBILITY STUDY Sembehun Dry Mine will have throughput flexibility and staged capital Pre Feasibility Study (PFS) Results Key Project Highlights > PFS conducted by DRA Projects (Pty) Sembehun Dry Mine Summary 1,000tph 500tph > 1,000tph open pit, dry mining operation to be dev

  32. Slide 32: Operational Overview

    OPERATIONAL OVERVIEW Mining and Initial Processing Wet Mining Unit Bucket ladder Single Plant Lanti Dredge Dredge designed to dig at a rate of 1,000 Mineral Separation Plant tonnes per hour separates the heavy mineral concentrate into our final products: rutile, ilmenite and zircon concentrate. Inst

  33. Slide 33: Why Rutile?

    WHY RUTILE? Unmatched Quality Chloride Consumption > Highest grade feedstock at 94% TiO2 14 13 times less > Low contaminants and material consistency 12 chloride consumption indexed to natural rutile Chloride consumption 10 > Promotes high value-in-use, essential to the manufacture of 8 than ilmenit

  34. Slide 34: Deposit and Peer Comparison

    DEPOSIT AND PEER COMPARISON Large, High-Quality Deposit Well-Positioned Against Peers(2) Bubble Size: In-situ Contained Rutile Resource > One of the world’s largest natural rutile deposit 1.20% — Mining leases over a land area of 560km Sierra Rutile, 8.2 Mt — JORC-compliant resource of approximately

  35. Slide 35: Revenue Contribution and Peer Comparison

    REVENUE CONTRIBUTION AND PEER COMPARISON Unmatched Quality SRL Revenue Split > “SRL’s high quality rutile product places the company at the forefront to benefit from any demand-led recovery in the TiO2 sector. SRL has the greatest exposure to rutile amongst the mineral sands peers.” > “SRL benefits

  36. Slide 36: End Markets

    END MARKETS Natural rutile is the preferred feedstock for titanium pigment and metal Titanium Pigment (TiO2) Titanium Metal > TiO2 creates the purest, brightest and most durable form of > Titanium is valued for its light weight, chemical inertness white pigment available for the production of paints

  37. Slide 37: Summary Income Statement

    SUMMARY INCOME STATEMENT Income Statement ($’000) 2015 2014 Gross revenue 105,760 117,759 Gross revenue ($’000) 2015 2014 Rutile 91,165 103,576 Rutile 91,165 103,576 By-products & freight costs 14,595 14,183 Ilmenite 5,236 6,781 Zircon and other concentrates 6,807 3,436 Cost of sales (99,890) (112,7

  38. Slide 38: Reconciliation of Cash Costs

    RECONCILIATION OF CASH COSTS Production Cash Costs - Reconciliation All-in Cash Costs - Reconciliation 650 750 21 4 600 700 98 49 550 $/t rutile sold 650 $/t rutile produced 500 537 614 600 450 667 720 400 550 Q4 2015 Change in Re-mapping of 2015 Preliminary (1) Production Report methodology certain

  39. Slide 39: Summary Cash Flow Statement

    SUMMARY CASH FLOW STATEMENT Summarised Cash Flow ($’000) 2015 2014 EBITDA 1 (refer to slide 37) 16,103 14,791 Working capital movements: (Increase)/decrease in inventories (8,728) 11,240 (Increase)/decrease in trade and other receivables 11,141 (15,260) Increase/(decrease) in trade and other payable

  40. Slide 40: Summary Balance Sheet

    SUMMARY BALANCE SHEET Assets ($’000) 2015 2014 Non-current assets ($’000) 2015 2014 Intangible assets 11,494 11,624 Non-current assets 188,449 175,827 Tangible assets 171,825 159,276 Cash and cash equivalents 5,017 6,564 Investment in joint venture 5,130 - Other current assets 62,440 70,235 Biologic

  41. Slide 41: Debt Management

    DEBT MANAGEMENT Net Debt Movement in Gross Debt 10,000 60,000 0 2,439 50,000 1,700 5,017 9,194 (10,000) Government Loan 40,000 $'000 (20,000) $’000 30,000 51,455 (30,000) Working Capital Facility 43,000 20,000 (40,000) Senior Loan 10,000 Facility (46,438) (50,000) (51,455) 0 Opening debt Gangama Exc

  42. Slide 42: Sierra Rutile

    SIERRA RUTILE Sierra Rutile Limited 30 Siaka Stevens Street 2nd Floor, Access Bank Building Freetown Sierra Leone www.sierra-rutile.com

Sierra Rutile — FY2015 Earnings Presentation on 6ix