Lundin Mining Corporation · TSX:LUN

Lundin Mining — 2009 RBC Global Mining and Materials Conference

15 slides from Lundin Mining's conference presentation, Jun 9, 2009

  1. Slide 1: 2009 RBC Global Mining and Materials Conference

    June 9, 2009 TSX: LUN OMX: LUMI 2009 RBC Global Mining and Materials Conference June 9-10, 2009

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking statements. These forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events. These forward-looking statements are s

  3. Slide 3: 2008: "Stronger for Longer"

    2008: “Stronger for Longer” Corporate Operations Projects Exploration Growth

  4. Slide 4: Global Financial Crisis

    Global Financial Crisis Corporate Operations Projects Exploration Growth

  5. Slide 5: Operating in a Global Recession

    Operating in a Global Recession INDUSTRY ƒ Metal prices collapsed. Size of movement less surprising than the speed. ƒ Debt and equity markets seized, demand collapsed as destocking took place and global inventories built. LUNDIN RESPONSE ƒ Operating plans were revised with the objective of ensuring

  6. Slide 6: Where We Are Today

    Where We Are Today Lundin Mining has three key assets: ƒ A 24.75% equity interest in the Tenke copper/cobalt project ƒ 100% ownership of Neves-Corvo copper/zinc/lead mine in Portugal ƒ 100% ownership of Zinkgruvan zinc/lead/silver/copper mine in Sweden The 100% owned Aguablanca nickel/copper mine in

  7. Slide 7: Tenke – Copper/Cobalt Deposit, DRC

    Tenke – Copper/Cobalt Deposit, DRC ƒ First copper cathode produced in March followed by first shipment in April ƒ Phase 1 levels of 115,000 tpa copper and 8,000 tpa cobalt on track for second half of 2009 ƒ Lundin Mining 2009 funding estimated in the range of $40 to $50 million ƒ Cost overruns funde

  8. Slide 8: Tenke Copper Production

    Tenke Copper Production Corporate Operations Projects Exploration Growth

  9. Slide 9: Tenke Plant Site

    Tenke Plant Site Corporate Operations Projects Exploration Growth

  10. Slide 10: Neves-Corvo – Copper/Zinc Mine, Portugal

    Neves-Corvo – Copper/Zinc Mine, Portugal ƒ Zinc production remains suspended due to low zinc price ƒ Zinc facility continues to treat copper ore and allowed for record tonnages of copper ore to be treated ƒ Expansion of the zinc processing capacity planned in anticipation of improved zinc prices but

  11. Slide 11: Neves-Corvo: Growing World Class Deposit

    Neves-Corvo: Growing World Class Deposit 24m @ 2.4% Cu 77m @ 1.2% Cu Corporate Operations Projects Exploration Growth

  12. Slide 12: Zinkgruvan – Zinc/Lead/Silver Mine, Sweden

    Zinkgruvan – Zinc/Lead/Silver Mine, Sweden ƒ Operations continued to achieve record levels for tonnes of ore mined and treated and for total lead and zinc production ƒ Copper project continues within budget and is on track for first copper production in 2010. Corporate Operations Projects Exploratio

  13. Slide 13: Financial Position

    Financial Position ƒ More than US$250 million of new equity raised ƒ Company has entered into multiple option collar arrangements covering 40,000 tonnes of copper over the next 12 months: weighted average floor price of $1.87/lb and cap of $2.39/lb Corporate Operations Projects Exploration Growth

  14. Slide 14: Summary

    Summary ƒ Recent equity raising, coupled with a limited‐term copper hedge, has removed the liquidity concerns the market had at the start of the year and we are now in a position to be able to finalize a suitable debt facility in the near future ƒ Our wholly-owned operations continue to perform well

  15. Slide 15: 2009 Annual Meeting of Shareholders

    May 15, 2009 TSX: LUN OMX: LUMI 2009 Annual Meeting of Shareholders

Lundin Mining — 2009 RBC Global Mining and Materials Conference on 6ix