Goodman Group · ASX:GMG

Goodman — Corporate Update (March 2020)

20 slides from Goodman's corporate update, March 2020

  1. Slide 1: Stakeholder Consultation Meeting

    Stakeholder Consultation Meeting Oakdale West Estate March 2020 1

  2. Slide 2: Overview

    Overview • Welcome and Introductions • Project Summary • Management of Environmental Aspects • Approvals and Proposals Update • Upcoming Project Program • Environmental Performance Update • Community Interactions Update • Safety Update • Communications and Consultation Channels • Stakeholder Feedbac

  3. Slide 3: Welcome and Introductions

    Welcome and Introductions Project Team: Organisation Goodman AT&L Burton Robson Civil SLR Ersed Ecologique Contractors Projects Consulting Role Proponent Project Manager Oakdale West Western Stakeholder Environmental Kat Duchatel & Contract – Stage 1 North South Engagement Representative Superintend

  4. Slide 4: Project Summary

    Project Summary • Approval for SSD 7348 granted including: – Concept Approval for the full site identifying primary access, road layouts, developable areas and biodiversity offsets – Stage 1 development, facilitating construction of: • Civil works including earthworks, roads, drainage and services •

  5. Slide 5: Site Plan

    Site Plan lODas Server verereensen ain aeewiseny GF ——_ 5

  6. Slide 6: Master Plan

    SSDA Estate Masterplan 7 = , WY) Y4 a Master Plan global environmental and advisory solutions

  7. Slide 7: Management of Environmental Aspects: Traffic and Transport

    Management of Environmental Aspects There are a number of key environmental aspects applicable to the project, with associated management plans prepared to address the potential for impact including: • Traffic and Transport: – A Construction Traffic Management Plan (CTMP) has been prepared with a ke

  8. Slide 8: Management of Environmental Aspects: Water and Soil

    Management of Environmental Aspects • Water and Soil Management: – Management plans include: • Erosion and Sediment Control Plan • Salinity Management Plan • Fill Importation Protocol • Dewatering and Management Procedure – Sediment laden runoff is managed to capture and treat runoff prior to leavin

  9. Slide 9: Management of Environmental Aspects: Flora and Fauna

    Management of Environmental Aspects • Flora and Fauna: – Management Plans include: • Aquatic Flora and Fauna Management Plan • Terrestrial Flora and Fauna Management Plan – Preclearance surveys and inspections have been undertaken by qualified ecologists to minimise impacts on site flora and fauna –

  10. Slide 10: Management of Environmental Aspects: Heritage

    Management of Environmental Aspects • Heritage: – An Unexpected Finds Protocol – Archaeological Items protocol has been established to guide construction – Contactors are trained in the implementation of the Unexpected Finds Protocol – Works would cease in the event of a potential find, prior to the

  11. Slide 11: Management of Environmental Aspects: Noise and Vibration

    Management of Environmental Aspects • Noise and Vibration: – Noise and vibration are managed by the Construction Noise and Vibration Management Plan supported by real time monitoring – The Management Plan focuses on the limiting of noise where possible, timing of noisy activities to less intrusive t

  12. Slide 12: Management of Environmental Aspects: Air Quality

    Management of Environmental Aspects • Air Quality: – Air Quality is managed by the Construction Air Quality Management Plan, supported by real time monitoring – Local weather conditions are monitored to guide construction activities, with wind speeds directing mitigation measures and work programs –

  13. Slide 13: Approvals and Proposals

    Approvals and Proposals • Approval granted by the NSW State Government to increase hours of works for a limited area of the site (Lots 2A and 2B) temporarily. • Modifications 1, 2, and 3 to SSD 7348 and SSD 10397 still under assessment by the NSW State Government. 13

  14. Slide 14: Project Program – March/April

    Project Program – March/April Oakdale West Estate – Burton Western North South Link Road – Contractors Robson Civil Northern Section: • Acceleration works to Lot 2B • Importation of fill to pavement • Earthworks to Western Noise Bund subgrade level • Cut to Fill in Precinct 1 • Continuation of storm

  15. Slide 15: Environmental Performance

    Environmental Performance ER INSPECTIONS AND AUDITS INCIDENTS AND COMPLAINTS AS INCLUDED IN MONTLY REPORTS 15

  16. Slide 16: Community Interactions & Traffic Arrangements

    Community Interactions & Traffic Arrangements • Targeted consultation meetings held with Emmaus College, Trinity Primary and Mamre Anglican Schools to discuss the use of Bakers Lane for construction traffic (as requested by TfNSW instead of Goodman’s proposal to use Abbotts Road/Aldington Road). • C

  17. Slide 17: Traffic Arrangements

    Traffic Arrangements oan | Be <> global environmental and advisory solutions S L Re 17

  18. Slide 18: Safety

    Safety • No external safety incidents • Minor internal safety incidents. No injuries • Minor unexpected finds onsite, including asbestos finds, have now all been addressed, with the last of the impacted material having been removed in accordance with EPA, the Unexpected Finds Protocol and Council gu

  19. Slide 19: Communications and Consultation Channels

    Communications and Consultation Channels Sources of information and complaints/enquiries via: • Website: oakdaleopportunities.com • Email: community.oakdalewest@goodman.com • Phone: 1300 002 887 • Post: Level 17, 60 Castlereagh Street, Sydney, NSW 2000 • Community Meetings: Subject to scheduling • E

  20. Slide 20: Stakeholder Feedback & Questions

    Stakeholder Feedback & Questions 20

Goodman Group — Corporate Update (March 2020) on 6ix