  1. Slide 1: An Emerging Canadian Gold Producer

    AN EMERGING CANADIAN GOLD PRODUCER Investor Site Visit – June 15-17, 2026 Queensway Gold Project

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation, and the information contained herein, has been provided to you by New Found Gold Corp. (“New Found Gold”, “NFG”, “NFGC” or the “Company”) solely for information purposes. While the information contained in this presentation is believed to be accurate, New Found Gold exp

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW KEITH BOYLE, CEO

  4. Slide 4: The New Found Gold Advantage

    THE NEW FOUND GOLD ADVANTAGE EMERGING GOLD PRODUCER | STRONG GOLD PRICE ENVIRONMENT FASTRACKING PRODUCTION | DERISKING QUEENSWAY TOP 10 JURISDICTION1 | NEWFOUNDLAND CANADA EXPERIENCED TEAM OF EXPLORERS, MINE BUILDERS & OPERATORS | FULLY FUNDED PROLIFIC PROPERTY PACKAGE | TREMENDOUS UPSIDE POTENTIAL

  5. Slide 5: Top 10 Jurisdiction

    TOP 10 JURISDICTION NEWFOUNDLAND & LABRADOR CONSISTENTLY RANKED A TOP 10 JURISDICTION1 GOVERNMENT PERMITTING Mining-supportive | Provincial Clear, timely provincial government goal to build 5 permitting process | Positive new mines by 2030 recent precedents WORKFORCE INFRASTRUCTURE Skilled workforce

  6. Slide 6: Directors & Senior Leadership

    DIRECTORS & SENIOR LEADERSHIP New Found Gold has a new board and management team with a solid track record of successful mine development and operation BOARD OF DIRECTORS Paul Andre Huet Chair Keith Boyle William Hayden1, 2 Dr. Andrew Furey1 Chad Williams1 Tamara Brown1 Allen Palmiere1 MANAGEMENT Si

  7. Slide 7: Building a Mid-tier Canadian Gold Producer

    Building a Mid-tier Canadian Gold Producer Queensway Gold Project: Milestones and Objectives Phase 1 production CAPEX secured MRE/PEA update Phase 1 Phase 1 Initial MRE PEA published EPCM first ore to commercial New Board and published Q3/25 underway Phase 1 EA submitted Phase 1 early works mill pro

  8. Slide 8: Queensway Life of Mine Plan

    QUEENSWAY DEVELOPMENT Queensway Life of Mine Plan 250 2000 ~$155M unlocks 1800 Annual Gold Production by Phase (koz) average annual 200 1600 production of 12.5 12.3 1400 AISC(1) US$/oz Au 172 Koz Au 150 1200 10.0 (Years 5-9) 1000 8.1 100 800 ✓ Phase 1 600 initial capital 50 3.6 2.4 2.5 400 secured 1

  9. Slide 9: Queensway Leverage to Gold Price

    QUEENSWAY LEVERAGE TO GOLD PRICE Queensway Offers Queensway PEA: After-Tax Economics High Leverage to Gold Price 197% 2,000 162% ✓ 100% of Revenue from Gold 136% ✓ $89MM increase in NPV5% for 115% 1,500 99% 1450 each US$100 increase in 74% 86% 1362 65% 1273 gold price 56% 1185 1097 NPV5 $MM 1008 1,0

  10. Slide 10: Capital Structure

    CAPITAL STRUCTURE CAPITALIZATION1 KEY SHAREHOLDERS5 Shares – Basic 384.1M Options & RSUs 8.2M ERIC SPROTT Warrants2 16.3M 19% Shares – F.D. 408.6M Share Price $2.14 Market Cap $822M 52 Week High/Low $4.89/$1.84 Average Daily Volume ~4M Cash and Marketable Securities3 $148M Credit Facility4 $105M Pot

  11. Slide 11: Attractively Positioned

    ATTRACTIVELY POSITIONED Production Growth Benchmarked to Peer Group Estimated 2026 Gold Production (koz Au per annum) Market Capitalization (C$ billion) $0.8 $1.2 $2.0 $1.8 $4.4 ? $1.5 $8.2 $7.9 278 260 231 191 191 (3) 131 121 93 ~172(4) 74 ~69(1) ~24(2) ~19(5) Integra New Found Gold (Phase 1) McEwe

  12. Slide 12: Key Reasons to Invest

    KEY REASONS TO INVEST EMERGING GOLD PRODUCER | STRONG GOLD PRICE ENVIRONMENT FASTRACKING PRODUCTION | DERISKING QUEENSWAY TOP 10 JURISDICTION1 | NEWFOUNDLAND CANADA EXPERIENCED TEAM OF EXPLORERS, MINE BUILDERS & OPERATORS | FULLY FUNDED PROLIFIC PROPERTY PACKAGE | TREMENDOUS UPSIDE POTENTIAL 1 Sourc

  13. Slide 13: Queensway & Hammerdown ESG Overview

    QUEENSWAY & HAMMERDOWN ESG OVERVIEW JARED SAUNDERS, VP SUSTAINABILITY

  14. Slide 14: Environmental, Social, Governance

    ENVIRONMENTAL, SOCIAL, GOVERNANCE COMMITTED TO RESPONSIBLE EXPLORATION, STRONG COMMUNITY PARTNERSHIPS AND ONGOING ENGAGEMENT OF KEY STAKEHOLDERS Environmental Local-First Monitoring Hiring NFG’s approach to project development is Local-first hiring and procurement strategy guided by environmental re

  15. Slide 15: Queensway Gold Project: EA Overview

    QUEENSWAY GOLD PROJECT: EA OVERVIEW PROJECT IN ENVIRONMENTAL ASSESSMENT (EA) INCLUDES 700 TPD MINE WITH THE FOLLOWING PHYSICAL COMPONENTS: • Four open pits and associated infrastructure (east of pits to increase distance from town) • Organics and overburden storage facility • Waste rock storage faci

  16. Slide 16: Queensway Gold Project: EA Overview

    QUEENSWAY GOLD PROJECT: EA OVERVIEW Pre-Environmental Assessment EA Registration Scoping, baseline studies, impact bio-physical and socio-economic assessment environmental affects Minister’s Decision Further Assessment Scheduled for June 21, 2026 OUTCOME B Develop guidelines, field work/modelling, a

  17. Slide 17: Social License to Operate

    SOCIAL LICENSE TO OPERATE INCLUDE ALL WHO NEED TO BE INCLUDED; BUILD POSITIVE RELATIONSHIPS OTHER KEY STAKEHOLDERS REGULATORY ENGAGEMENT • NL Power Companies • Energy and Mines* • Qalipu First Nations • Mineral Lands Division* • Miawpukek First Nation • Mineral Development Division* • Newfoundland &

  18. Slide 18: Employment at New Found Gold

    EMPLOYMENT AT NEW FOUND GOLD Other Parts of WE ARE PROUD TO BE OPERATING IN CENTRAL NEWFOUNDLAND Canada 9% • We continually aim to partner with communities surrounding our projects. MOVING FROM EXPLORATION TO MINING WILL CREATE NEW JOB OPPORTUNITIES • We believe the necessary workforce is located ri

  19. Slide 19: Engagement Approach

    ENGAGEMENT APPROACH STAKEHOLDER COMMUNICATION ✓ Involves ongoing communication with local communities, Indigenous groups, regulators, and stakeholders throughout the project lifecycle. PUBLIC INFORMATION SHARING ✓ Public meetings, information sessions, and project material distribution facilitate tr

  20. Slide 20: Community Partnerships

    COMMUNITY PARTNERSHIPS MOVING TOWARD COMMUNITY-MINDED SPONSORSHIPS • New Found Gold has recently implemented a new sponsorship strategy. • Types of sponsorships include: • community development projects • youth and education initiatives • environmental stewardship causes • health and wellness progra

  21. Slide 21: Environmental Protection

    ENVIRONMENTAL PROTECTION PREVENTION IS THE BEST MEANS TO REDUCE ENVIRONMENTAL IMPACT ONGOING ENVIRONMENTAL MONITORING ACTIVITIES • Pre-work environmental assessments • Daily environmental inspections • Dedicated environmental team PROGRESSIVE REHABILITATION AND RECLAMATION • Reclaiming of sumps • Tr

  22. Slide 22: Queensway Environmental Monitoring

    QUEENSWAY ENVIRONMENTAL MONITORING WATER RESOURCES SOCIO-ECONOMIC ENVIRONMENT • Surface water (multi-year program) • Historic Resources • Groundwater (multi-year program) • Land and Resource Use • Housing Capacity FISH AND FISH HABITAT • Fish presence/absence, Technical Studies Completed • Fish habi

  23. Slide 23: Queensway Project Overview & Exploration Update

    QUEENSWAY PROJECT OVERVIEW & EXPLORATION UPDATE: MELISSA RENDER, PRESIDENT

  24. Slide 24: Drill Count and Program Details

    ay NEWFOUNDGOLD DRILL COUNT + Adrills turning ,ramping up to 6 shortly PROGRAM DETAILS + $44M - fully funded + ~34,000m YTD / ~90,000m diamond drilling planned (37% complete) . Exploration & Growth Focus (45%): v AFZ Core: Depth extensions below key zones and proximal to infrastructure. v AFZ Periph

  25. Slide 25: Queensway - Grab Samples

    Queensway - Grab Samples POWERED BY #*VRIFY

  26. Slide 26: #*VRIFY

    #*VRIFY

  27. Slide 27: POWERED BY

    POWERED BY #*VRIFY

  28. Slide 28: AFZ Core Step-Out Exploration

    _AFZ CORE STEP-OUT EXPLORATION AFZ Core Step-Out Exploration (MRE Expansion) ¥ ~20,000 m planned v Bullseye ~4,500 m completed v Dome Ext. ~1,100 m completed v¥ Golden Dome expansion ~3,000 m planned v AFZ-KBFZ Target —- ~5,000-8,000 m planned. New discoveries in highly prospective region below and

  29. Slide 29: POWERED BY

    POWERED BY #*VRIFY 250m 4000m Depth Potential soo 24-2700 eb gr sour Somat ott Och \ sosanonnlstanses \\\) Semen MN Block Vodel Grad Au gft Pee O bome Bost0 (Golden Dome. vetoes sn enon ets ecietigngeoltGo gh snndnnnnen rigs Br. ‘Sapmnvoan tocar ta sate

  30. Slide 30: AFZ-KBFZ Target

    AFZ-KBFZ TARGET a = F NW SE Deep mineralized structures in the AFZ footwall (east of the AFZ) > N 2.10 g/t Au/ 7.05m 6.16 g/t Au/3.10m -600m 1.63 gf Au/5.15m 2.55 git Au/2.85m CROSS-SECTION LOOKING NE Prunge oo i) ‘imuth 032 50 100_150 200

  31. Slide 31: AFZ-KBFZ Target

    AFZ-KBFZ TARGET a LIZATION NW SE Deep mineralized structures in the AFZ footwall. - 600m CROSS-SECTION LOOKING NE Phunge-06 ‘Aci 028 050 100150 200 ———

  32. Slide 32: Iceberg Grade Control Pad Development

    zy Iceberg grade control pad development ~55% Pre-Development (Advanced Exploration) v v v AFZ CORE ADVANCED EXPLORATION Phase 2 Pit Infill (inferred to indicated) ~10,500 m planned Phase 3 UG Infill (inferred to indicated) ~25,000m Grade Control: NQ test program, Keats & Iceberg grid expansion, Lot

  33. Slide 33: AFZ Core Excavations

    J AFZ CORE EXCAVATIONS ay NEWFOUNDGOLD ACTIVITY SUMMARY (5 KEY ZONES) ee | (proposed & | «y |— completed) | 2526 KEATS. + Excavated, mapped and channel sampled (Results reported) 7.11m@ 28.1 git Au inal 1.42m @ 49.5 g/t Au incl. 3.37m @ 34.3 g/t Au J cm 15.12m @ 23.9 g/t AU inet 1.72m @ 152 g/t Au I

  34. Slide 34: UG Infrastructure & Stopes

    UG Infrastructure & Stopes Keats South Jackpot Jnderground Development. BB osecone B oe 13 PEA Underground Infrastructure and Stope Design POWERED BY #*VRIFY

  35. Slide 35: Keats Completed Grade Control Grid

    Keats Completed Grade Control Grid

  36. Slide 36: Grade Control Drill - Iceberg 2026

    ay NEWFOUNDGOLD Grade Control Drill - Iceberg 2026 Iceberg Vein & Cameron VG specimens from Lotto Excavation VG specimens from Keats Excavation

  37. Slide 37: AFZ-P Step-Out & Blue-Sky Exploration

    \\ \\ \\ ey \w | AFZ-P STEP-OUT & BLUE-SKY EXPLORATION AFZ P Step-Out Exploration Dropkick: MRE Expansion + ~7,000m step-out drilling planned + New near-surface high-grade outside of MRE on east and west side of AFZ. * 11km northeast of AFZ Core along the AFZ + Mineralization characteristics similar

  38. Slide 38: POWERED BY

    POWERED BY #*VRIFY Greenwood Appleton Fault Zone Pauls Pond Queensway - Grab Samples Duder Lake Gazeebow South AFZ Peripheral AFZ Core we

  39. Slide 39: Strike Potential

    Strike Potential Dropkick ~~~ / AFZ Peripheral al Pistachio AFZ Core POWERED BY #*VRIFY

  40. Slide 40: Dropkick

    POWERED BY #*VRIFY Dropkick DROPKICK L7£ NFGC-25-2518 (6.79 git Au over 18.35 m) AFZ NFGC-25.2448 (72 gft Au over 1035 m)

  41. Slide 41: Dropkick Drill Results

    POWERED BY #*VRIFY NFGC-25-2624 1.25 g/t Au over 10.60 m NFGC-25-2403. 4.54 g/t Au / 19.00m NFGC-25-2390. 20.9 g/t Au /11.10m NFGC-25-2394. 8.31 g/t Au /18.20m NFGC-25-2317. 29.2. g/t Au/ 9.25m NFGC-25-2686 24.8 g/t Au over 14.00 mo NFGC-25-2448. 7.20 g/t Au | 10.15m 5.76 Au g/t over 5.75m NFGC-24-2

  42. Slide 42: Regional Exploration

    ~ REGIONAL EXPLORATION Regional Blue Sky & Step-Out Exploration ¥ ~7,000 m DDH planned * Pauls Pond: Step-out and new target testing + Greenwood: New target testing, follow up from past trenching + New targets generated in the 2026 field program v Trenching + Extensive trenching planned for Greenwoo

  43. Slide 43: POWERED BY

    POWERED BY #*VRIFY Greenwood Appleton Fault Zone Pauls Pond Queensway - Grab Samples Duder Lake Gazeebow South AFZ Peripheral AFZ Core we

  44. Slide 44: Queensway South Highlights

    Queensway South = ies & OL Highlights 7 ‘Grab Samples «Aug Sods A Ba% ; © i eh x ¢ ss == a Devils Pond ee: > "vf Bstronaut 2 Bes * - Pauls Pond Trend / nat Greenwood Pond Le 5 ¥ ceed 2 ars eta 4 in! Devils Pond South a Bk ee a : we ee “| NFGC-QS-24-88 L

  45. Slide 45: Orogenic Au Environment

    / OROGENIC AU ENVIRONMENT QUEENSWAY PROJECT ‘VALENTINE GOLD MINE Ps is POLLOCK et al., 2007 newfoundgold.ca Continent-Continent collision and terrane accretion Development of major regional-scale deep-seated structures Magmatism, metamorphism, deformation Turbidite sediments unconformably deposited

  46. Slide 46: Geologic Setting

    GEOLOGIC SETTING immuno The Queensway Project is located along a continental a | collision margin formed as part of the Appalachian Orogeny - the collision of Laurentia with Gondwana and its micro-continents (Ganderia and Avalonia). DOG BAY LINE Britain Greenland The Dog Bay Line (DBL) is a major Si

  47. Slide 47: Litho-Structural Architecture

    ay LITHO-STRUCTURAL ARCHITECTURE NEWFOUNDGOLD Structural evolution of the Davidsville group in the Exploits subzone NW SE NW SE NW mineralized penetrative SE slip on décollement increasing stip on décollement oceanic crust tow-di NO) DogBayline A Au Hydrothermal Fluids oceanic erust (metamorphism) s

  48. Slide 48: Property Geology

    + Predominantly Ordovician Davidsville Group * Fold-thrust sequence of shallow marine siliciclastic sedimentary rocks (turbidites) + Unconformably overlies the Gander River Complex of ultramafic and mafic rocks in the east * Conformably underlies the Indian Island Group in the west (shallow marine s

  49. Slide 49: AFZ Mineralization

    AFZ MINERALIZATION a Au-bearing faults + epizonal veins cross-cut stratigraphy at a high angle NFGC-23-1729 | 2 | SSRs wz gt au/675m — Mas BLACK SHALE MONTE | | == CARLO } oe a) 2 wagtau/ 885m NFGC-21-201, if 150 gRAU/T.50m_| Consistent style across all zones =| (NFGC-21-115) 20.9 g/tAu/8.4m A REA [

  50. Slide 50: NB gat

    06 NB gat 93 ee NFGC-23-1128 12.6 g/t Au /7.60m i 13.1 g/t Au/1 FG 1141 on g/t Au / 20.35m NFGC-23-1306 i 33.1 g/t Au/4.80m NFGC-23-1141 35.6 g/t Au / 10.65m NFGC-23-1141 NFGC-22-833 10.5 g/t Au / 6.65m 2.41 g/t Au / 35.00m NFGC-22-911 4.27 g/t Au / 31.55m GREYWACKE GREYWACKE newfoundgold.ca TSX-V:

  51. Slide 51: Deformation and Gold

    DEFORMATION AND GOLD D1A - Acadian Orogeny (~418 Ma): Early fold-thrust development, Steepening and Sinistral Transpression X-Section ik es Spplne ns126) ‘¢Fiplungelo=17) ay NEWFOUNDGOLD » NW-SE Directed Sinistral Transpression + Early thrust development- AFZ, Dog Bay Line, Reach Fault, etc. * Tight

  52. Slide 52: Deformation and Gold

    \\ V DEFORMATION AND GOLD eee . |! A Secondary Splays Appl C09 Foye - Three main orientations: - NE Striking (Keats Main/Iceberg) Conjugate SSE (e.g. Lotto) o== - EW (EW Vein) Striking Faults ~ Three main plunge groups: = "Pha T. - SW shallow-mod * a my - NE moderate 19 -SSteep 3 5 sw NE AFZ EAST LO

  53. Slide 53: High-Grade Shoot Controls

    \ } HIGH-GRADE SHOOT CONTROLS Iceberg Cross-Section Keats Cross-Section a High-Grade Au Fault Segment Au-bearing Fault/Vein » High-grade shoot location and geometry is largely controlled by intersecting faults/veins + Breccia “pipes” developed at structural intersections. + Rapid depressurization an

  54. Slide 54: Queensway Project PEA & Engineering Studies

    QUEENSWAY PROJECT PEA & ENGINEERING STUDIES ROB ASSABGUI, COO

  55. Slide 55: Queensway Development Strategy

    QUEENSWAY DEVELOPMENT STRATEGY Phase 1 (Years 1-4): Open Pit Mine with Off-Site Toll Milling • Queensway site prep and installation of infrastructure for a small OP mine. • High-grade material crushed and transported to an off-site toll mill, at a rate of 700 tpd starting in year 1 • Lower grade mat

  56. Slide 56: Initial MRE Conversion

    INITIAL MRE CONVERSION Initial MRE Summary (Effective Date March 15, 2025) MRE Conversion to PEA Mine Plan Zone Category Tonnage Grade Contained Metal MRE Mine Plan Conversion (Mt) (g/t Au) (Moz) (kt) (g/t Au) koz koz % Indicated 17.3 2.25 1.25 Open Pit Open Pit Inferred 9.0 1.24 0.36 Indicated 0.8

  57. Slide 57: Mining Methods

    MINING METHODS Conventional open pit truck and shovel mining with complementary high-grade underground cut-and-fill Open Pit Mine • Conventional OP truck and shovel operation with 17 pits • The three main pits (Iceberg, Keats and Keats West) are sequenced early in the mine life and will subsequently

  58. Slide 58: Open Pit Mining Schedule

    OPEN PIT MINING SCHEDULE 18,000 9.0 4,500 9.00 16,000 8.0 4,000 8.00 14,000 7.0 3,500 7.00 12,000 6.0 3,000 6.00 Stripping Ratio – Waste to Mineralized Minerealized Material Mined (ktpa) Mineralized Material Mined ktpa 10,000 5.0 2,500 5.00 Grade g/t Au 8,000 4.0 2,000 4.00 6,000 3.0 1,500 3.00 4,00

  59. Slide 59: Material Classification

    MATERIAL CLASSIFICATION 250 • High Confidence Mineral Resources Open Pit Indicated in the mine plan Open Pit Inferred • Years 1-5: >80% of ounces in Underground Indicated the indicated category Underground Inferred 200 • LOM: >75% of ounces in the Annual Gold Production by Resource Classification (k

  60. Slide 60: Queensway Processing and Recovery

    QUEENSWAY PROCESSING AND RECOVERY Metallurgical Test Work1 Phases I & II Summary: • Based on phases 1 and 2, the PEA assumes an 92% recovery, with 48% of the gold reporting to doré, and 44% of the gold reporting to concentrate. • Gold reporting to doré will be recovered by gravity concentration, as

  61. Slide 61: In-Pit Tailings Deposition

    IN-PIT TAILINGS DEPOSITION Iceberg, Keats, Keats West scheduled for in-pit tailings deposition (Combined excavated rock volume of 30.6 Mm3) • Tailings discharged from high ground, ponds formed in middle area • Allows for centralized water management operations • Utilizes topography for beach slopes

  62. Slide 62: Production and Cost Profile

    PRODUCTION AND COST PROFILE Average Annual Gold Production 250 2000 LOM ~100 koz 1800 Years 1-4 69.3 koz Years 5-9 172.2 koz Annual Gold Production by Phase (koz) 200 1600 1400 12.5 12.3 Average Daily Mining Rate AISC(1) US$/oz Au 150 1200 10.0 Years 1-4 700 tpd 1000 8.1 Years 5-15 7,000 tpd 100 800

  63. Slide 63: Capital Cost Summary

    CAPITAL COST SUMMARY Sustaining (C$ millions) Phase 1 Phase 2 Phase 3 Total Capital Mining $47.7 - $104.2 $321.4 $473.3 Onsite Processing $220.5 - - $220.5 Onsite Infrastructure $15.7 $23.5 - $4.0 $43.2 Offsite Infrastructure $40.5 - - - $40.5 Indirects/Owner's Costs/EPCM $19.9 $109.8 $10.0 - $139.7

  64. Slide 64: Operating Cost Summary

    OPERATING COST SUMMARY Life of Mine Operating Cost(1)(2) Unit Value Mining (Open Pit) $M 906.6 Mining (Underground) $M 188.5 Unit Operating Costs Unit Value Third-Party Processing $M 57.5 Mining $/ t proc. 40.01 Material Handling $M 86.2 Processing $M 549.5 Processing $/ t proc. 25.33 G&A $M 188.7 G

  65. Slide 65: EPCM Contract

    EPCM CONTRACT • EPCM contract awarded to WSP Canada Inc. for Queensway Phase 1 project development (January 2026) • EPCM work currently underway; advancing Queensway site development and detailed engineering for the expansion and upgrade of Pine Cove Mill • Expanded Pine Cove Mill to process feed fr

  66. Slide 66: Queensway Development Schedule

    QUEENSWAY DEVELOPMENT SCHEDULE 2026 2027 2028 2029 2030 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Continued community and government engagement PHASE 1 PEA/MRE Permitting Engineering Early works, Construction Production PHASE 2-3 Permitting Feasibility Detailed Eng

  67. Slide 67: Appendix

    PADD DDD DAPECKM OWOOD DD

  68. Slide 68: Queensway Overview

    QUEENSWAY OVERVIEW High-Grade Core = Low Capital-Intensive Phased Approach Rapid Advancement to Cash Flow • Solid low-cost production profile from year one via a phased mine plan: • Phase 1: Low Initial capital cost ($155 million), builds average annual gold production2 of 69.3koz oz Au at an AISC3

  69. Slide 69: Queensway Mineral Resource Estimate

    QUEENSWAY MINERAL RESOURCE ESTIMATE Mineral Resource Estimate - Queensway (Effective Date: March 15, 2025) Zone Category Tonnage Grade Contained Gold (kt) (g/t Au) (koz) Indicated 17,267 2.25 1,249 Open Pit Resources Inferred 8,960 1.24 358 Indicated 771 5.76 142 Underground Resources Inferred 1,749

  70. Slide 70: Non-GAAP Measures

    NON-GAAP MEASURES Non-GAAP Financial Measures The Companies have included certain non-GAAP financial measures in this presentation, including AISC, cash cost, cash cost per ounce and cash flow. These financial measures are not defined under International Financial Reporting Standards (“IFRS”) and sh

  71. Slide 71: Mineralization Style

    VISIBLE GOLD IN QUARTZ-CARBONATE VEINS MINERALIZATION STYLE VEIN STYLES: • Stylolitic- massive to vuggy (Crack-seal / fault fill) • Breccia- vuggy • Stockwork METALLIC MINERALS: • +/- arsenopyrite, chalcopyrite boulangerite/bournonite, pyrite SILICATE MINERALS: NH4 muscovite, Qtz, Fe-Carb

  72. Slide 72: Alteration

    A A’ ALTERATION Inclined view * Visually non-distinct alteration adjacent to Lotto vein looking down-dip on Keats Baseline Fault. High Grade Au Zone White Mica Alteration Footprint NH4 Muscovite Kaolinite • NH4 Muscovite and Fe-carbonate proximal to and within Au-bearing * Kaolinite alteration assoc

  73. Slide 73: Pathfinder Geochemistry

    PATHFINDER GEOCHEMISTRY Arsenic Tungsten Keats West Keats West • Au-As-Sb-W-Cu-Pb Metal association Keats Keats • Typical orogenic signature 200M 200M • Early low-grade min event Au-As Antimony Gold • Later high-grade min event Keats West Au-As-Cu-Pb Keats West Keats Keats 200M 200M TSX-V: NFG | NYS

  74. Slide 74: QWS Exploration

    DEVILS TREND QWS EXPLORATION DEVILS 2022 Inaugural Program NORTH • Inaugural program: 8 targets drilled (7,255m in 33 DDH) • Significant gold mineralization in 27 of 33 DDH PAULS TREND • Visible gold in 10 DDH from 4 target areas • Paul's Pond Trend: 2.5km extent Indian NFGC-QS-22-15 0.47 g/t Au / 8

  75. Slide 75: Field Relationships

    FIELD RELATIONSHIPS Vuggy Breccia Vein w/ Gold KEATS TRENCH Au in Breccia N Bedding at High angle to vein wall PENUMBRA EAST-WEST VEIN Fault Fill / Crack-Seal Vein w/ Gold TSX-V: NFG | NYSE-A: NFGC newfoundgold.ca TSX-V: NFG 64 Au in Crack-Seal Vein TSX-V: MAE

  76. Slide 76: Iceberg

    ICEBERG A KEATS W DOME COKES • New Found’s most recent high-grade discovery made in TCH GOLDEN JOINT March 2023. • This high-grade, at-surface discovery is likely the eastern continuation of the Keats Main Zone. ICEBERG-ICEBERG E. • High-grade fault segment ~570m strike. • KBFZ now spans ~1.9km stri

  77. Slide 77: Keats West

    KEATS W KEATS WEST A COKES GOLDEN JOINT • New Found’s first major discovery located on the west TCH A’ side of the AFZ, made in September 2022. • Shallow-dipping thrust fault associated, quartz vein- ICEBERG-ICEBERG E. hosted with 315m+ strike length and 305m+ down-dip extent. KEATS • Average thickn

  78. Slide 78: Contact

    CONTACT Fiona Childe | Ph.D., P.Geo. VP, Communications & Corporate Development +1-416-775-2700 contact@newfoundgold.ca https://www.linkedin.com/company /newfound-gold-corp

  79. Slide 79: An Emerging Canadian Gold Producer – Hammerdown

    TSX-V: NFG | NYSE-A: NFGC AN EMERGING CANADIAN GOLD PRODUCER Investor Site Visit – June 2026 Hammerdown Gold Project

  80. Slide 80: Disclaimer

    DISCLAIMER This presentation, and the information contained herein, has been provided to you by New Found Gold Corp. (“New Found Gold”, “NFG”, “NFGC” or the “Company”) solely for information purposes. While the information contained in this presentation is believed to be accurate, New Found Gold exp

  81. Slide 81: Hammerdown Gold Project - Exploration

    HAMMERDOWN GOLD PROJECT - EXPLORATION MELISSA RENDER, PRESIDENT

  82. Slide 82: Hammerdown District Potential

    ¥ \ HAMMERDOWN DISTRICT POTENTIAL alt ( Hammerdown Gold Project @ Deposit @ Prospect/ Historic Mine oO Mu Trans-Canada Highway — Road | @ Gityrown ARGYLE (i) ) -{ MING MINE % FireFly (@) stoc’eR TIGHT } (@ pine cove } Baie Verte (7 a ay 532" | * ® Fd @) NUGGET POND HGP 2 Gy astenoown |/, PROPERTY Ro

  83. Slide 83: Hammerdown Deposit

    \ HAMMERDOWN DEPOSIT LONG SECTION VIEW (LOOKING NORTH) | CROSS SECTION VIEW (LOOKING WEST) PINE COVE HISTORIC MINE q Tsomvo yy \ HAMMERDOWN RESOURCE EXPANSION POTENTIAL a NEWFOUNDGOLD SHALLOW RESOURCE GROWTH OPPORTUNITIES | Limited testing below 200 m VD across all advanced target areas OPEN FOR EXP

  84. Slide 84: Hammerdown Exploration & Drilling Update

    MN \ ay NY HAMMERDOWN EXPLORATION & DRILLING UPDATE ‘*ewrounncotp wae ¥ New and growing experienced exploration team ¥ Project-wide data compilation underway v Advancing toward property-wide geological interpretation, updated geological models and targeting. Y Defining both near-deposit resource exp

  85. Slide 85: Deer Cove

    Deer Cove ee. ‘Stoyer Tight Pine Cove = Legend 1 Haminerconn Gold Project @) vecoste © Prospects mis (C) hectares ewe Mejor Fouts @ 6214 shonings Rock Samples (Au g/t) @-x ) Bos. Boros <0a POWERED BY #*VRIFY

  86. Slide 86: POWERED BY

    POWERED BY #*VRIFY

  87. Slide 87: POWERED BY

    POWERED BY #*VRIFY Deposit lHammersown' Deposit Orion? Tetatindicated 1.234 Total Inforre Historic Workings Ova Stockpile Hamnmerdown Pit Weste Stocksile Sorter reject stockpile VE Stockoie Settling Ponds ~ ov Sinckpte Omne Stocks

  88. Slide 88: Pine Cove Mill

    Pine Cove Mill Stog'er Tight Deposit In-Pit Tailings L ¢ Deep Water Port ructure pads eralized Stockpile jerburden Storage Facility ste Rock Storage Facility

  89. Slide 89: POWERED BY

    POWERED BY #*VRIFY

  90. Slide 90: Block Model Class

    Block Model Class _ Previously Mined Pit POWERED BY #*VRIFY

  91. Slide 91: Baie Verte Peninsula Regional Geology

    BAIE VERTE PENINSULA REGIONAL GEOLOGY sewro peou % Gold showing #Gold prospect Kerr & Selby, 2014 = {Deer Cove Goidenviie Former gold producer (dormant or exhausted) DUNNAGE ZONE Major crustal suture zone (1* order), Baie Verte Line, adjacent to the significant past and currently producing gold in t

  92. Slide 92: Hammerdown Property Geology

    HAMMERDOWN PROPERTY GEOLOGY Hammerdown Rumbullion & Wisteria ay NEWFOUNDGOLD Multiple Gold Environments & Deposit Types: Three gold trends Volcanic hosted, orogenic-gold (Hammerdown) Felsic Intrusion hosted, epithermal (Whisker Valley) Gold VMS Potential Gold mineralization is concentrated along sec

  93. Slide 93: Hammerdown Property Au Mineralization

    HAMMERDOWN WHISKER VALLEY HAMMERDOWN PROPERTY AU MINERALIZATION Whisker Valley epthermal mineral ion within the granodiorite adjacent to a mafic dyke HOSS! SECTION LOOKING WEST a NEWFOUNDGOLD HAMMERDOWN Steeply dipping, stacked gold- bearing quartz-sulphide veins hosted in ~250 m segment of the 1.8

  94. Slide 94: Pine Cove Property Geology & Gold

    PINE COVE PROPERTY GEOLOGY & GOLD scenes A * THREE GOLD TRENDS (Thrust Faults): * Scrape — Pine Cove, Stog’er, Argyle DCT = Deer Cove Thrust GC =Green Cove = * Goldenville BH = Big Head y + Deer Cove MB = Ming’s Bight ; DG = Dunamagon Granite and volcano sedimentary rocks * Gold mineralization is co

  95. Slide 95: Hammerdown Gold Project - Mining

    HAMMERDOWN GOLD PROJECT - MINING ROB ASSABGUI, COO

  96. Slide 96: Hammerdown Ramping Up

    HAMMERDOWN RAMPING UP September 5, 2025 Announced definitive agreement to acquire Maritimes Resources Corp. (MAE) November 13, 2025 New Found Gold completes acquisition of MAE; Hammerdown ramp-up commenced with the objective of reaching commercial production in H2/26 February 26, 2026 Announced PEA

  97. Slide 97: Hammerdown & Pine Cove Overview

    HAMMERDOWN & PINE COVE OVERVIEW HUB AND SPOKE MINE STRATEGY 3 deposits – Hammerdown, Orion and Stog’er Tight - centered around the Company’s Pine Cove Mill TWO PROPERTIES; ONE PROJECT Hammerdown and Pine Cove properties – located in Central Newfoundland and Labrador, Canada ACCESS TO INFRASTRUCTURE

  98. Slide 98: Hammerdown Mineral Resource Estimate

    HAMMERDOWN MINERAL RESOURCE ESTIMATE PEA mine plan developed from: • Measured and Indicated Mineral Resources of 3,328 kt grading 2.43 g/t gold: 260,000 ounces • Inferred Mineral Resources of 2,132 kt grading 2.34 g/t gold: 161,000 ounces Hammerdown Deposit Updated MRE Tonnage Grade Deposit Mining M

  99. Slide 99: Hammerdown PEA & Mine Plan

    HAMMERDOWN PEA & MINE PLAN Hammerdown Gold Project Life of Mine Plan1 Economics - Base case (US$3,656)2 After-tax NPV5% C$199.2M LOM AISC ($/oz) US$2,429 / oz Total After-Tax Free Cash Flow C$243.3M 3 At US$5,000 gold price, after-tax NPV5% increases to C$415.1M Mining & Milling Mine Life 13 years T

  100. Slide 100: Hammerdown Site Plan

    HAMMERDOWN SITE PLAN MINE SETTLING POND WASTE ROCK MANAGEMENT STOCKPILE PARKING ‘power OS bry se OFFICES siTE EAYDOwn SHOAL'POND BYPASS ROAD

  101. Slide 101: Hammerdown Site Development Highlights

    HAMMERDOWN SITE DEVELOPMENT HIGHLIGHTS HEALTH & SAFETY Zero Lost Time Incidents and Total Recordable Incident Frequency Rate of 0 after a total of over 64,175 person-hours worked in 2026 MINING DEVELOPMENTS Production mining, drilling and haulage contracts with NL-based contractors in place; additio

  102. Slide 102: Hammerdown Site Development

    HAMMERDOWN SITE DEVELOPMENT

  103. Slide 103: Hammerdown Site Development

    HAMMERDOWN SITE DEVELOPMENT June 3, 2026 Lookout Point

  104. Slide 104: Pine Cove Mill

    PINE COVE MILL cams Land Use Details - Explosives Magazine Access road Shoreline Dock

  105. Slide 105: Pine Cove Mill Flowsheet

    PINE COVE MILL FLOWSHEET • Single stage ball mill • 4 x flotation cells • 4 x leach tanks • 2 x drum filters • Merill Crowe circuit • Onsite refining • In pit tailings storage

  106. Slide 106: Pine Cove Mill Development Highlights

    PINE COVE MILL DEVELOPMENT HIGHLIGHTS HEALTH & SAFETY Zero Lost Time Incidents and Total Recordable Incident Frequency Rate of 0 after a total of over 43,703 person-hours worked in 2026 MILL DEVELOPMENTS Mill commissioned with on-site low-grade stockpiles; transitioning to Hammerdown mineralized mat

  107. Slide 107: Pine Cove Mill

    NEWFOUNDGOLD - = = ui > fe) O Lu z oO.

  108. Slide 108: Appendix

    APPENDIX) (/) Nay gi \)

  109. Slide 109: Hammerdown Mineral Resource Estimate

    HAMMERDOWN MINERAL RESOURCE ESTIMATE Hammerdown Deposit Updated MRE (effective date January 22, 2026). Orion deposit MRE (effective date January 22, 2026). Tonnage Grade Contained Oz Tonnage Grade Contained Oz Deposit Mining Method Category Deposit Mining Method Category (kt) (g/t Au) (koz) (kt) (g/

  110. Slide 110: Hammerdown Life of Mine Model

    HAMMERDOWN LIFE OF MINE MODEL1 Queensway (NFLD) LOM YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 YR 12 YR 13 Open pit ROM (000t) 54,078 4,296 5,979 6,529 6,690 6,700 6,500 4,998 4,001 2,500 2,501 2,490 895 - OP ROM Grade (g/t Au) 2.19 2.28 2.47 2.49 2.06 1.58 1.65 2.11 3.30 2.30 1.62 1.9

  111. Slide 111: Non-GAAP Measures

    NON-GAAP MEASURES Non-GAAP Financial Measures The Companies have included certain non-GAAP financial measures in this presentation, including AISC, cash cost, cash cost per ounce and cash flow. These financial measures are not defined under International Financial Reporting Standards (“IFRS”) and sh