Silver Predator Corp · TSXV:SPD
Silver Predator — Investor Presentation (March 2013)
19 slides from Silver Predator's investor presentation, March 2013
Slide 1: Corporate Presentation March 2013
CORPORATE PRESENTATION MARCH 2013
Slide 2: Corporate Mandate
Corporate Mandate Corporate Mandate Silver Predator’s corporate mandate is to advance the previously operated Nevada-based Taylor project towards production. The Taylor project, with an existing mill onsite, pre-stripped open pit mineralization and a NI 43-101-compliant resource open to expansion, h
Slide 3: Competitive Advantages
Competitive Advantages NI 43-101 Compliant Resource (1) Resource Class Tonnes (1,000) Silver (g/t) Contained Oz Silver (1,000) Measured 1,123 85.71 3,095 Indicated 4,712 77.83 11,793 Measured & Indicated 5,835 79.20 14,888 Inferred 687 87.09 1,923 *At a 41.1 g/t (1.2 oz/ton) silver cutoff grade. Not
Slide 4: Board of Directors
Board of Directors William M. Sheriff, MSc | Chairman • Chairman of Americas Bullion Royalty Corp., Tigris Uranium Corp. and a Director of Western Lithium Corporation • Co-founder and Chairman of Energy Metals Corporation, NYSE listed company sold to Uranium One for 1.8 billion dollars in 2007 Natha
Slide 5: Technical Team
Technical Team Nathan A. Tewalt, BSc | Chief Executive Officer • Over 25 years of experience in exploration and executive management positions; led the technical teams that discovered the Storm and Hollister gold deposits at the north end of the Carlin Trend in northeastern Nevada • Former CEO and D
Slide 6: Capital Structure & Share Performance
Capital Structure & Share Performance (As at February 13th, 2013) Capital Structure Share Performance Market Capitalization 7.2 mm (@ $0.15) Issued & Outstanding Shares 47.7 mm Fully Diluted Shares 55.5 mm Warrants & Options Warrants(*) 2.9 mm SPD Options 4.9 mm • 2.9 mm Exercisable at $0.28 until D
Slide 7: Nevada – The Silver State
Nevada Nevada – The Silver State Preferred mining jurisdiction: • Established mineral tenure and permitting procedures • Politically stable • Established infrastructure • Proven mineral potential • Established silver jurisdiction TSX:SPD -7-
Slide 8: Flagship Project: Taylor Mine & Mill, Nevada
Flagship Project: Taylor Mine & Mill, Nevada • Open pit & mill operated from 1981-84; expanded mill and flotation circuit operated from 1989-91 and remains largely intact • Current resource estimate based on economic silver resources at a price of $13.50 per ounce(1) • Excellent infrastructure and h
Slide 9: Flagship Project: Taylor Mine & Mill, Nevada
Flagship Project: Taylor Mine & Mill, Nevada • Updated resource planned for Q1 2013; 85 reverse circulation, 2 core holes and 3 metallurgical core holes completed since last NI 43-101 estimate (2) • 60 RC holes completed in 2011 & 2012 extending mineralization(3) • 2012 mapping and soil sampling hav
Slide 10: New Discovery Potential at Taylor: Silver in Soil Samples
New Discovery Potential at Taylor: Silver in Soil Samples • Completed 1,166 sample soil grid testing for multiple elements • Excellent correlation between key geologic features and silver anomalies • Good overall correlation with gold • 17 samples above 5.0 g/t Ag with highs of 14.8, 15.4, 22.5, and
Slide 11: New Discovery Potential at Taylor: Gold in Soil Samples
New Discovery Potential at Taylor: Gold in Soil Samples • First indication that the Taylor project shows significant potential as a gold district • Gold grades found at surface exceeded expectations as geologic model suggests primary gold target is ~200’-450’ deep (upper Guillmette Formation) • Seco
Slide 12: New Carlin-Style Targets: Taylor Mine, Nevada
New Carlin-Style Targets: Taylor Mine, Nevada TSX:SPD -12-
Slide 13: High Grade Discovery Potential: Cornucopia, Nevada
High Grade Discovery Potential: Cornucopia, Nevada • 385 ha property in northern Nevada • Discovery of high grade silver in 1873 produced 762,000 oz of silver and 13,400 oz of gold at calculated grades of 24.6 oz/t silver and 0.43 oz/t gold(5) • Epithermal veins hosting silver with increasing gold n
Slide 14: Sonora Silver, Idaho
Sonora Silver, Idaho • 610 acres surrounded by patented claims of Hecla et al • Road accessible lying 3 miles north of Interstate 90, the Lucky Friday silver mine and Mullan, Idaho • Idaho is the United States’ largest silver producer Silver Predator’s Sonora Silver Project (bedded & vein targets) H
Slide 15: Major Objectives and Projected Completion Dates
Major Objectives and Projected Completion Dates Taylor Project 2013: • Compile 2012 geologic mapping and soil program to identify new gold and gold- silver target areas in the district (complete) • Permit top 3-5 gold target areas, conduct first pass RC drilling looking for near surface and deeper h
Slide 16: Investment Highlights
Investment Highlights • Advancing towards resumption of open pit mining and milling operations at the Taylor Mine and Mill • NI 43-101 compliant resource with an additional 88 holes to be included in updated 43-101 with anticipated Q1/2013 (3) NI 43-101 Compliant Resource (1) Resource Class Tonnes S
Slide 17: Disclaimer
Disclaimer ©2012 Silver Predator Corp. All rights reserved. Unless otherwise noted, “Silver Predator” and all other marks used in this presentation are trademarks of Silver Predator Corp. (the “Company”). Any reproduction or dissemination of any feature of this presentation, in whole or in part, or
Slide 18: Endnotes
Endnotes (1) Technical Report, NI 43-101 of the Taylor Silver Project, White Pine County, Nevada, USA by Michael G. Hester, FAusIMM, Independent Mining Consultants, Inc. dated December 14, 2010 (2) This figure references 35 holes drilled in 2011 as reported in Silver Predator News Release dated Augu
Slide 19: Silver Predator Corp.
Silver Predator Corp. | TSX:SPD Head Office 11521 N. Warren Street Hayden, Idaho USA 83835 T: 208 635 5415 F: 208 635 5465 Investor Relations T: 208 635 5415 F: 208 635 5465 E: info@silverpredator.com www.silverpredator.com