Tennessee Valley Authority · NYSE:TVC

Tennessee Valley Authority — Airport Ground Support Equipment RFP Pre-Bid Webinar (July 2015)

17 slides from Tennessee Valley Authority's conference presentation, Jul 10, 2015

  1. Slide 1: Webinar Etiquette

    Webinar Etiquette  Participants will be muted during this webinar.  You may submit questions in writing by using the Q&A tool or using the ‘raise hand’ tool. Both are visible on the webinar toolbar.  Audio Pin MUST be entered after you dial to allow you to speak.  To minimize the Webinar toolbar

  2. Slide 2: EnergyRight & Renewable Solutions: Airport Ground Support Equipment RFP Pre-Bid Webinar

    ® EnergyRight & Renewable Solutions Airport Ground Support Equipment RFP Pre-Bid Webinar Brent Kent, Program Manager EnergyRight® Solutions for Business/Industry July 10, 2015

  3. Slide 3: Background

    Background • In April 2011, the Tennessee Valley Authority (TVA) board approved clean air agreements with the Environmental Protection Agency, four states, and three environmental groups that support TVA’s vision for low- cost and cleaner energy. • TVA chose projects to align with its vision for a c

  4. Slide 4: Airport Ground Support Equipment

    Airport Ground Support Equipment • The Airport Ground Support Equipment (GSE) Program will be delivered through a request for proposal (RFP) released June 29, 2015. • The RFP will target airports across the TVA service territory • The available funding for the GSE Program is $1,170,000 • The program

  5. Slide 5: RFP Applicants

    RFP Applicants • This RFP is open to airports, airport authorities, airlines, cargo carriers, corporate procurement offices, and other airport stakeholders, and any other businesses that operate Ground Support Equipment (“GSE”) in the TVA service area 4

  6. Slide 6: Projects to Consider

    Projects to Consider • Electric Pushback or Electric Aircraft Tractors • Electric Belt Loaders • Electric Tugs and Tow Tractors • Ground Power Units (GPUs) • Pre-Conditioned Air Units (PCAs) • Charging Infrastructure • Other fossil-fueled (gas/diesel) technologies that can be replaced with electric

  7. Slide 7: Key Dates

    Airport Ground Support Equipment Key Dates MILESTONE DATE Solicitation Release Date June 29, 2015 Q&A Webinar Session for Potential Offerors July 10, 2015 Intent to Bid/Not Responding Due July 15, 2015 Questions Due July 17, 2015 Responses to Questions July 24, 2015 Proposals Due August 21, 2015 Eva

  8. Slide 8: Acceptable Proposals

    Acceptable Proposals • Proposals must contain the information requested and shall be in sufficient form and detail to enable a comprehensive understanding and analysis. • Prior to evaluation, the Contracting Officer may review proposals to determine compliance with preparation instructions, terms an

  9. Slide 9: Proposal Response Form

    Proposal Response Form 1. Respondent Contact Information 2. Project Participant Information a) Airport b) Airlines c) GSE Operators d) Vendors e) Additional Information 3. Local Power Company a) Account Number 8

  10. Slide 10: Proposal Response Form

    Proposal Response Form 4. Project Scope a) Quantity and type of GSE being converted or replaced with electric b) Description of how project will improve airport operations c) Emission reduction potential d) Project Implementation Plan e) Project Cost f) Funding amount requested g) Proposed Incentive

  11. Slide 11: Emissions Reduction Potential

    Emissions Reduction Potential Proposal emissions reduction potential will be calculated by TVA in concurrence with the standardized methodology published by the U.S. Environmental Protection Agency (EPA.) Symbol Emission Type HC Hydrocarbons CO Carbon Monoxide NOx Nitrogen Oxides PM Particulate Matt

  12. Slide 12: Emissions Reduction Potential

    Emissions Reduction Potential GSE Unit Worksheet a Microsoft Excel spreadsheet with a table for the required information. Offerors are required to complete and return the required data. Failure to submit a proposal pursuant to the requirements of this solicitation may result in disqualification of t

  13. Slide 13: Evaluation Process

    Evaluation Process • TVA will evaluate the proposals using numeric scoring and a total score will be computed for each proposal. Using these scores, TVA will establish a competitive range. • TVA may, at its discretion, request clarifications or conduct discussions with any or all Offerors, or only t

  14. Slide 14: Evaluation Factors

    Evaluation Factors Evaluation criteria to be considered by TVA in determining which proposal is most advantageous to TVA will include total cost of ownership to TVA. Evaluation criteria considered may also include: 1. Abilities of Offeror to Perform the Work described in Attachment A 2. Estimated Nu

  15. Slide 15: Next Steps

    Next Steps • Submit Intent to Bid Form – July 15, 2015 • Submit Questions – July 17, 2015 • Complete Proposal – Due August 21, 2015 – ENCLOSURE I – PROPOSAL STATEMENT FORM – ENCLOSURE II – PROPOSAL RESPONSE FORM – ENCLOSURE III – INTENT TO BID FORM – ENCLOSURE IV – VENDOR INFORMATION DATA – ENCLOSUR

  16. Slide 16: Questions?

    AG4 Airport Ground Support Equipment RFP Questions? Please send ALL clarifying questions in writing to Brad Wagner, at brwagner0@tva.gov no later than 5:00PM ET on July 14, 2015. 15

  17. Slide 17: Slide 16 AG4 Somewhere in here you should note that participants should not contact

    Slide 16 AG4 Somewhere in here you should note that participants should not contact anyone at TVA to discuss or question this RFP Angela Gordon, 6/21/2015

Tennessee Valley Authority — Airport Ground Support Equipment RFP Pre-Bid Webinar (July 2015) on 6ix