Image Resources Nl · ASX:IMA

Image Resources Nl — Investor Presentation (February 2019)

28 slides from Image Resources Nl's investor presentation, February 2019

  1. Slide 1: Boonanarring Mineral Sands Project Investor Presentation February 2019

    1 Boonanarring Mineral Sands Project 100%-owned; high-grade; zircon-rich 80km north of Perth in Western Australia On-track for positive cashflow end 1st QTR 2019 Investor Presentation February 2019 Patrick Mutz Managing Director Image Resources NL ASX: IMA

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements 2 This presentation has been prepared by the management of Image Resources NL ("Image”, “IMA“ or the ‘Company’) in connection with meetings with investors and potential investors and not as specific advice to any particular party or person. The information is based on publ

  3. Slide 3: Investor Snapshot

    Investor Snapshot 3 Company transitioning to profitable miner and realisation of full valuation  Company fully funded to positive cashflow  Project construction and commissioning complete 30 Nov 2018 • ‘on-budget’ and ‘on-schedule’  Production commenced 1 Dec 2018  First bulk shipment HMC produc

  4. Slide 4: Investor Snapshot: Supply Shortage of Zircon

    Investor Snapshot 4 Company transitioning to profitable miner at a time of supply shortage of zircon  Binding off-take agreements in place for 100% of HMC production for life of mine  Project NPV A$235 million1; IRR 125%1; 13 month payback1  metrics have strengthened with 12% zircon price rise on

  5. Slide 5: Products and Applications: Zircon

    Products and Applications 5 Key products are zircon and titanium dioxide  Zircon sand is processed into zirconium compounds, intermediate products and zirconium metal for a variety of applications;  Ceramics (tiles); 55% demand  Foundry Sands (castings); 14%  Refractories (furnace linings); 10%

  6. Slide 6: Products and Applications: Titanium Dioxide

    Products and Applications 6 Key products are zircon and titanium dioxide  Titanium dioxide (TiO2) from rutile and ilmenite is processed into titanium based products and titanium metal for a variety of applications;  Ultra-white pigments (paint, paper, plastic); ~90% demand  Welding rods (flux coa

  7. Slide 7: Project Location

    Project Looking Forward LocationStatement 7  LOCATION  North Perth Basin in Western Australia  80 km north of Perth CBD  Proven mineral sands address  Including majors Iluka and Tronox  Infrastructure rich  paved roads, power, gas pipeline water, telecommunications etc.  Local communities an

  8. Slide 8: Project Types and Locations

    Project Types and Locations 8  1,000 km2 tenements portfolio Atlas Ore Reserves  100% focus on mineral sands Probable: 9.5Mt @ 8.1% HM  Strandline projects (dry mining)  Dredge mining prospects Boonanarring Ore Reserves Proved: 9.3 Mt @ 8.6% HM Multiple opportunities for a second Probable: 10.5M

  9. Slide 9: Ore Reserves

    Ore Reserves Forward Looking Statement 9  QUALITY ORE RESERVES  JORC Code (2012) Compliant  High HM, VHM and very high zircon at Boonanarring High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes VHM Ilmen

  10. Slide 10: Ore Reserves Comparison

    Ore Reserves Forward LookingComparison Statement 10 IMAGE X Source: TZMI; May 2017

  11. Slide 11: Project Capital Comparison

    Project ForwardCapital LookingComparison Statement 11 Source: TZMI; May 2017

  12. Slide 12: Products and Prices

    Products and Prices 12 Notes: VHM assemblages and commodity prices are estimates based on Boonanarring project heavy mineral concentrate product.

  13. Slide 13: Bankable Feasibility Study

    Bankable Forward Feasibility Looking Study Statement 13 Base Assumptions  Start mining at Boonanarring  Dry, open-cut mining  Production rate - 500 dry tonnes per hour • 3.7M dry tonnes per year  Conventional gravity separation using spirals  Product: Heavy Mineral Concentrate (HMC) • Productio

  14. Slide 14: Boonanarring – Production Statistics

    Boonanarring – Production Statistics 14 Average annual production at Boonanarring (5 yrs)  240k tonnes HMC; containing; • 60kt zircon (70kt/year in 2019-20) • 130kt ilmenite • 6kt rutile • 4kt leucoxene  5.5 years mine life with ability to add 3-4 years additional ore reserves

  15. Slide 15: Boonanarring – BFS Production Statistics

    Boonanarring – BFS Production Statistics 15 Boonanarring Project Production Forecast - updated July 2018 2018 2019 2020 2021 2022 2023 Total Ore processed (Kt) 700 350 3,600 3,800 3,700 3,800 3,500 19,100 Ore grade (%HM) 6% 7% 8% 11% 6% 8% 11% 8% Assemblage (% of HM) 42.7 270.0 429.4 207.2 285.0 378

  16. Slide 16: Boonanarring – BFS Project EBITDA

    Boonanarring – BFS Project EBITDA 16 Boonanarring Project EBITDA Summary - updated July 2018 (AU$million) 2018 2019 2020 2021 2022 2023 Total Revenue 5 0 127 181 100 139 101 653 Revenue/tonne HMC 455 0 580 566 526 604 439 544 Operating Costs Mining 18 46 43 42 42 35 226 Processing 1.2 7 7 7 7 8 37 S

  17. Slide 17: Boonanarring – Ramp-up Production

    Boonanarring – Ramp-up Production 17 December 2018 Operating Statistics Jan. Jan. Prelim. Prelim. (TBC) (TBC)

  18. Slide 18: Zircon Prices Actual and Forecast

    Forward Looking– Statement Zircon Prices Actual and Forecast 18 Current price for Tronox premium grade zircon

  19. Slide 19: BFS Financial Metrics

    BFS Financial Forward LookingMetrics Statement 19 Key Financial Metrics Original BFS1 Updated BFS2 Updated BFS3  Pre-Tax NPV (@ 8%) A$135M A$197M A$235M  Pre-Tax IRR 64% 104% 125%  Payback period (months) 22 16 13  Mine life 8+ years  Project capital cost A$52M  includes ~$8M for land 1 - ASX

  20. Slide 20: Project Development Schedule

    Project Development Schedule 20 Constructed to schedule/budget with first production in 4th QTR 2018 Simplified Boonanarring Project Construction Schedule - (high level) 2018 2019 May Mar Mar Aug Nov Dec Apr Feb Feb Sep Oct Jun Jan Jan Jul WCP & Equipment Relocation Project Construction Pre-Strippin

  21. Slide 21: Upside Potential

    UpsideLooking Forward Potential Statement 21 Upside potential at and near Boonanarring  Confirmed potential to extend mine life with high grade mineralisation (ASX announcement 13 March & 26 June 2017);  Assuming mineralisation in extension area is identical to known Ore Reserves in all aspects an

  22. Slide 22: Boonanarring High-Grade Extension

    Boonanarring High-Grade Extension 22 ASX - 13 March & 26 June 2017 New Drilling Results (Feb 2017)  Confirm 5.6km northern extension of Boonanarring mineralisation  Outstanding high grade intersections:  8m @ 23.8% HM in IX00245  8m @ 21.1% HM in IX00244 and  8m @ 16.3% HM in IX00250 Importantl

  23. Slide 23: Projects – Strand Deposits

    Projects – Strand Deposits PyramidStatement Forward Looking 23 Mineral Resources – Accessible by Dry Open-Cut Mining Projects ranked by combined Zircon (Zr) plus Rutile (Ru) BFS assumes mining at Boonanarring Tonnes-grades are for Mineral Resources; Boonanarring and Atlas per JORC Code (2012); follo

  24. Slide 24: Projects – Dredge Prospects

    Projects – Dredge Prospects PyramidStatement Forward Looking 24 Mineral Resources – Accessible by Dredge Mining Projects ranked by HM Grade Positive attributes • 90+%VHM; • <5% slimes; Tonnes-grades are for historic Mineral Bidaminna • 25-67% Leucoxene; Resources per JORC Code (2004). 45Mt; 3.0%HM;

  25. Slide 25: Potential Royalty from Tronox

    Potential Royalty from Tronox 25 Royalty agreement in place as of 2014  Small cash payment (already received)  Sliding-scale royalty on production Avg. HM Grade Royalty 2.5% 1.25% 3.0% 2.50% 3.5% 3.75% 4.0% 5.00%  Indefinite production schedule  Potential for future arrangements with Tronox or o

  26. Slide 26: Image Corporate Snapshot

    Image Corporate Snapshot 26 Diverse and experienced Board and Management ASX Code: IMA Board of Directors Share Price: A$0.15* Bob Besley – Independent Chairman 12-Month Price Range: A$0.07– 0.17 Patrick Mutz – Managing Director Shares on Issue: 957m Chaodian Chen - Non-Executive Director Market Cap

  27. Slide 27: Use of Solar Energy

    Use of Solar Energy 27 Heads of Agreement with Sunrise Energy Group Pty Ltd to provide 3-4 MWAC solar farm to be:  Constructed and operated by Sunrise Energy;  Located on Image owned land adjacent to Boonanarring mine site; and  Providing 25% of total electricity requirements for mine and process

  28. Slide 28: Contact

    Contact For further information 28 Patrick Mutz Managing Director Image Resources NL info@imageres.com.au Office: +61 8 9485 2410 Ground Floor, 23 Ventnor Avenue West Perth, WA 6005 PO Box 469, West Perth, WA 6872 www.imageres.com.au

Image Resources NL — Investor Presentation (February 2019) on 6ix