Boss Energy Limited · ASX:BOE

Boss Energy — Boss Resources — Investor Presentation (October 2016)

24 slides from Boss Energy's investor presentation, Oct 11, 2016

  1. Slide 1: Honeymoon Uranium Project Investor Presentation

    HONEYMOON URANIUM PROJECT South Australia For personal use only INVESTOR PRESENTATION October 2016

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only The information contained in this presentation or subsequently provided to any recipient of this presentation whether orally or in writing by or on behalf of Boss Resources Limited (“Boss”) or its respective employees, agents or consultants (Information) is provided

  3. Slide 3: Why Uranium? Nuclear Power: The Best Solution

    WHY URANIUM? Nuclear Power: The Best Solution For personal use only • Nuclear power provides the best solution for a non-polluting 24:7 base load power source • Zero carbon emissions • Over 440 existing nuclear plants, focused in Europe, North America, Russia, South Korea and Japan • 1.7 billion of

  4. Slide 4: Climate Change Requires Nuclear Energy Involvement

    CLIMATE CHANGE REQUIRES NUCLEAR ENERGY For personal use only INVOLVEMENT “There’s really only one technology that we know of that supplies carbon-free power at the scale modern civilization requires, and that is nuclear power” - Ken Caldeira of Stanford University’s Department of Global Ecology

  5. Slide 5: Market Demand: Global Reactor Growth

    MARKET DEMAND Global Reactor Growth For personal use only • Global nuclear power generation capacity will increase 70% over the next decade from 374,067MWe to 636,693MWe • Annual uranium demand will increase from 177mlbs to 280mlbs by 2020, representing a 58% increase • Additional 390mlbs will be ne

  6. Slide 6: China

    CHINA For personal use only 223mlbs U3O8 purchased since 2009 Breaking ground on 6-8 new units per year (increasing to 10 per year post-2020) Air Quality Imperative – moratorium on new coal plants CURRENT NUCLEAR GROWTH PLAN 2020 58GWe 2025 97GWe 2040 160GWe

  7. Slide 7: India

    INDIA For personal use only Official Plan – 15 GWe installed by 2025 Uranium buying spree (long term contracts) – Canada, Kazakhstan, Uzbekistan Establishment of “Strategic Uranium Reserve” of between 13 and 39mlbs U3O8 21 6 4 REACTORS OPERATING UNDER CONSTRUCTION PLANNED With installed capacity of

  8. Slide 8: Japan

    JAPAN For personal use only 20-22% NUCLEAR POWER PLANNED Government approved 26 5 4 APPLICATIONS APPROVED RESTARTED NRA has received 26 reactor Five reactors approved for Four reactors have restart applications restart started

  9. Slide 9: Honeymoon Highlights

    HONEYMOON HIGHLIGHTS For personal use only PERMITTED TARGET INFRASTRUCTURE LOW CAPEX Fully permitted uranium Significant exploration target $170m plant and Expansion Study highlights operation infrastructure in place low CAPEX expansion Huge 80+ km potentially (1 of only 4 in Australia) mineralised

  10. Slide 10: Corporate Structure

    CORPORATE STRUCTURE For personal use only Shareholder Breakdown Existing Shares (ASX:BOE) 903 million 14% Directors & Related Parties Performance Rights* 58 million 12% Offshore Holdings Options ($0.02 Aug 18) 10 million Cash (30 June 2016) ~ $3 million 4% Nominee Companies Market Capitalisation ~$5

  11. Slide 11: Australian Uranium Projects

    AUSTRALIAN URANIUM PROJECTS For personal use only HONEYMOON URANIUM PROJECT • One of the highest grade un- mined uranium resources in Australia • 1 of only 4 fully permitted uranium projects in Australia • Curnamona Basin – a significant underexplored uranium province • Targeting >100mlbs resource •

  12. Slide 12: Honeymoon Uranium Project

    HONEYMOON URANIUM PROJECT For personal use only • Located 75Km NW of Broken Hill, in the Curnamona Region of South Australia • Resources amenable to ISL recovery • Mineralisation occurs at 90-120m depth • Over 5,300 drill holes in data base • Multiple styles of uranium mineralisation identified 12

  13. Slide 13: Infrastructure

    Water Treatment Plant INFRASTRUCTURE Production Well Fields $170M EXISTING INFRASTRUCTURE IN PLACE For personal use only Control Admin Buildings Centre Production Facility Camp PLS Ponds Workshop

  14. Slide 14: Honeymoon Resource

    HONEYMOON RESOURCE SIGNIFICANT EXISTING HIGH GRADE RESOURCES – HIGHEST GRADE AMONGST ASX-LISTED PEERS For personal use only Million U3O8 Contained U3O8 Contained U3O8 Classification Tonnes ppm (Mkg) (Mlb) Measured 1.7 1720 2.95 6.5 Indicated 5.9 810 4.80 10.6 Inferred 32.5 569 18.50 40.7 Total 40.1

  15. Slide 15: Expansion Study

    EXPANSION STUDY LOWEST CAPEX URANIUM PLAY ON ASX WHILST MAINTAINING LOW OPEX For personal use only • Completed September 2016 by GR Engineering and ANSTO • The Expansion Study was based on results from past production operations • A hybrid ELUEX process utilizing $170m existing infrastructure • Low

  16. Slide 16: Eastern Tenements Exploration Potential

    EASTERN TENEMENTS EXPLORATION POTENTIAL For personal use only • Eastern Tenement Resource of 32.8mlb U3O8 YARRAMBA • Additional regional Exploration Target of 18-47mlb U3O8 NORTH JASONS • 30 strike km of potential mineralision LAWLORS • Drill ready targets - historical drilling shows numerous >1,000

  17. Slide 17: Western Tenements Exploration Potential

    WESTERN TENEMENTS EXPLORATION POTENTIAL For personal use only • Western Tenement Resource of 25mlb U3O8 • Additional regional Exploration Target of 24-53mlb U3O8 • 54 strike km of potential mineralision • Goulds Dam / Billeroo system underrated: – 12km strike length – Under drilled highly prospectiv

  18. Slide 18: Milestones

    MILESTONES For personal use only ✓ Project Acquisition Lowest cost per lb acquisition in recent history ✓ Resource Upgraded Total resource of 57.8mlb U3O8 @ 654ppm – 3.5 times the resource at acquisition in December FEASIBILITY PLANNING SCHEDULE 2015 ✓ Project Activities Q₃ 2016 Q₄ 2016 Q1 2017 End

  19. Slide 19: Directors: Experienced Board and Management

    DIRECTORS EXPERIENCE BOARD AND MANAGEMENT For personal use only • Mark Hohnen Chairman Mr Hohnen has extensive international business experience in a wide range of industries. He is currently a Board member of Swakop Uranium and was the founding Executive Chairman of Kalahari Minerals Plc. • Marat A

  20. Slide 20: Competitive Advantage

    COMPETITIVE ADVANTAGE BOSS RESOURCES For personal use only TEAM ASSETS APPROVALS LOW COST Executives with project Honeymoon Uranium All approvals are in Expansion Study management, asset in South Australia place highlights low CAPEX development, financing, expansion (US$57m) Underestimated Only non-

  21. Slide 21: Uranium Peers Cost Analysis

    URANIUM PEERS COST ANALYSIS – ASX Uranium Companies For personal use only Athabasca Basin (Canada) Ultra high grade 1% plus However ultra high costs Typical CAPEX ~ $1 Billion Kazakhstan Produces ~ 40% world uranium Typical OPEX $20-30/lb Berkeley (Spain) ISL production Peninsula (USA) ASX:BKY Typic

  22. Slide 22: Peer Comparison ASX Listed Stocks

    PEER COMPARISON ASX LISTED STOCKS For personal use only Initial Capex Mining Resource Market Cap $ C1 Costs Company Grade ppm Mining Type Resource (US$) Permit mlb (AUD$) Valuation/lb US$/lb Toro Energy (ASX:TOE) $315m ✗ 84 482 Bulk surface $100m $1.94 $31 Vimy (Energy & Minerals) (ASX:VMY) $378m ✗

  23. Slide 23: For personal use only

    For personal use only 23

  24. Slide 24: Contact

    For personal use only Contact Grant Davey – Operations Director Suite 23, 513 Hay Street +61 (0) 447 753 163 Subiaco, WA 6008 www.bossresources.com.au 24 +61 8 6143 6730