  1. Slide 1: Resources Rising Stars

    For personal use only Resources Rising Stars Mark Williams (MD & CEO) November 2023 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence

  2. Slide 2: Competent Person's Statement and Disclaimer

    Competent Person’s Statement and Disclaimer Competent Person Statements for JORC 2012 Mineral Resource and Ore Reserves ● The information in this presentation that relates to the Mineral Resources for the King of the Hills deposit is extracted from the ASX announcement titled “Mineral Resource and O

  3. Slide 3: Red 5 asset overview

    Red 5 asset overview Red 5’s assets comprise the King of the Hills (KOTH) Gold Mine, Darlot Gold Mine and a 3.25% net smelter royalty over the Siana Gold Mine KOTH Summary For personal use only Mineral Resource5 4.5Moz 2H FY2023 Production6 103koz Ore Reserve5 2.5Moz Indicative Production2 >200koz p

  4. Slide 4: Red 5 Limited – corporate profile

    Red 5 Limited – corporate profile 0.5 Our Company Vision 0.4 “To be a successful multi-operational For personal use only exploration and mining company, providing benefits to all stakeholders, through the 0.3 consistent application of technical excellence, and responsible and sustainable industry 0.

  5. Slide 5: 4 years from concept to production

    4How weconcept years from did it, where we are going to production Delivered a large, modern, low-cost process plant For personal use only Constructed on time and on budget in 2022 FY24 guidance: 195-215koz, A$1,850-A$2,100/oz AISC Delivering safe, profitable ounces and free cash flow Accelerating r

  6. Slide 6: SAG mill – throughput up to 5.5Mtpa (nameplate 4Mtpa)

    SAG mill – throughput up to 5.5Mtpa (nameplate 4Mtpa) For personal use only www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 6

  7. Slide 7: Sept 2023 Quarter highlights

    Sept 2023 Quarter highlights Quarterly 12-month TRIFR ● One recordable injury for the quarter 20 ● Continued safety improvement, with 12-month TRIFR For personal use only 16 reducing to 7.6 (June Quarter: 9.0) 12 12-month TRIFR ● 55,009oz of gold produced for Sept Quarter 8 ● Sept Quarter AISC of $1

  8. Slide 8: Mining performance for Sept 2023 Quarter

    Mining performance for Sept 2023 Quarter ● All three mines are performing well, with operating Quarterly KOTH underground performance cash flows of $44.8m for the Quarter 1.93 2.00 300 1.70 KOTH open pit HG ore reduced whilst management 1.58 1.80 For personal use only ● 1.40 1.60 250 focused on sett

  9. Slide 9: Open pit currently mining the 5205 & 5195 mRL benches

    Open pit currently mining the 5205 & 5195 mRL benches For personal use only www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 10

  10. Slide 10: Main ore zone provides for large, contiguous high-grade blocks

    Main ore zone provides for large, contiguous high-grade blocks Stage 1 KOTH open pit Ore Reserve model – contained ounces by RL RL HG LG For personal use only 5295 5285 5275 5265 5255 5245 5235 5225 5215 5205 5195 5185 5175 5165 5155 5145 5135 5125 5115 5105 5215M Bench F4 - 5,000 10,000 15,000 20,0

  11. Slide 11: H2 FY23 mining performance confirms long-term mine plan

    H2 FY23 mining performance confirms long-term mine plan For personal use only 1. Red 5 ASX Release: 7 September 2023 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 12

  12. Slide 12: Growth potential for KOTH mine

    Growth potential for KOTH mine1 ● Resource definition and grade control drilling continues to For personal use only deliver high-grade assays ● 26.0m at 168.15g/t ● 16.5m at 16.50g/t ● 16.4m at 10.62g/t ● 29.5m at 5.11g/t ● 75.4m at 1.83g/t ● Grade control drilling now complete for over 85% of the F

  13. Slide 13: KOTH exploration – numerous surface targets

    KOTH exploration – numerous surface targets ● Three satellite deposits are already in the LOM plan: ● Rainbow For personal use only ● Centauri ● Cerebus-Eclipse ● Integrated datasets have identified priority targets along the Tarmoola and Ursus Fault corridors ● Tarmoola Fault Corridor Cerebus- Ecli

  14. Slide 14: Darlot adds value as satellite mine to KOTH

    Darlot adds value as satellite mine to KOTH ● Darlot benefiting from development investment and For personal use only reduced cost base ● FY25 & 26 mine plan locked in ● Second jumbo scheduled in H2FY24 ● FY24 focus on Resource conversion Middle Walters South1 ● 4.4m at 16.0g/t Centurion1 ● 4.6m at

  15. Slide 15: "King of the Mills" in the Leonora district

    “King of the Mills” in the Leonora district KOTH process plant is the lowest cost Regional process plants – mill size, unit cost and distance to Leonora ● mill in the Leonora district ● Large mill drives site-wide economies For personal use only of scale 60 ● 30MW hybrid gas-solar power ● Operating

  16. Slide 16: Standout value opportunity – de-risked steady-state operations

    Standout value opportunity – de-risked steady-state operations ● Red 5 EV/Reserve relative to its 2,000 peers Ramelius For personal use only ● Valuation of WA based-gold companies1 1,600 Bellevue Bubble size = Enterprise Value EV / Reserve (A$/oz) ● ● The new KOTH Gold Mine 1,200 positions Red 5 as

  17. Slide 17: Thank you

    For personal use only THANK YOU Level 2, 35 Ventnor Avenue, West Perth, Western Australia 6005 Australia (61-8) 9322 4455 (61-8) 9481 5950 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 18

  18. Slide 18: Appendices

    For personal use only Appendicies www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 19

  19. Slide 19: Leadership Team with strong mining expertise

    Leadership Team with strong mining expertise Following the recent Board renewal process, Red 5 has a strong and capable Board and Executive team with many years of mining and development experience. For personal use only Board Management team Appointed Chair in Jul-2023. Mining Engineer with >40 Rus

  20. Slide 20: KOTH Mineral Resource of 4.5Moz

    KOTH Mineral Resource of 4.5Moz1 Total Open Pit & Underground KOTH Resource as at June 2023 Cut-off Mining Gold Contained Gold Classification Tonnes (000t) For personal use only (g/t) Method (g/t) (000oz) Measured 0.4-1.0 OP+UG 4,092 1.1 145 Indicated 0.4-1.0 OP+UG 67,559 1.5 3,286 Inferred 0.4-1.0

  21. Slide 21: KOTH Ore Reserve of 2.5Moz

    KOTH Ore Reserve of 2.5Moz1 Total KOTH Ore Reserves as at June 2023 Cut-off JORC 2012 Tonnes Gold Contained Gold Deposit Mining Method (g/t) Classification (Mt) (g/t) (Moz)2 For personal use only KOTH Open pit 0.4 Proved 4.6 0.8 0.1 KOTH Open pit 0.4 Probable 54.2 1.2 2.0 KOTH Underground 1.4 Probab

  22. Slide 22: Top Gold Deposits in Australia

    Top 20 Gold Deposits in Australia Resources Reserves Mt g/t Moz Mt g/t Moz Cadia 3374 0.4 46.6 Cadia 1280 0.4 17.4 For personal use only Golden Mile – KCGM 565 1.6 28.3 KCGM (100%) 286 1.3 12.2 Boddington 788 0.6 15.2 Boddington 525 0.6 10.6 Mallina Gold Project 278 1.3 11.7 Mallina Gold Project 121

  23. Slide 23: Australian Top Gold Deposits

    Australian Top 20 Gold Deposits1 Resources Reserves Resources Reserves Resources Reserves Mt g/t Moz Mt g/t Moz Mt g/t Moz Mt g/t Moz Mt g/t Moz Mt g/t Moz Cadia Newcrest St Ives Goldfields Sunrise Dam AngloGold Ashanti Measured 32.0 0.30 0.3 Proven Measured 0.9 3.30 0.1 Proven 5.9 2.60 0.5 Measured

  24. Slide 24: Thank you