Tajiri Resources Corp. · TSXV:TAJ

Tajiri Resources — Investor Presentation (August 2024)

19 slides from Tajiri Resources's investor presentation, August 2024

  1. Slide 1: Corporate Presentation August 2024 Part I

    Corporate Presentation August, 2024 Part I Yono Project: Within 170m of 7.9Moz Au of neighbouring I+I Resources Reo Gold Project: Giant Poly Folded Gold System

  2. Slide 2: Gold Explorer: Diversified in Burkina & Guyana

    Gold Explorer: Diversified in Burkina & Guyana TSX-V: TAJ ▪ Very Desirable Address in Guyana and Longer-Term Potential Large Mining Camp in Burkina. ▪ Reo Project, Burkina Faso: ~1,000 km2- At the junction of the prolific Hounde, Bromo & Goren Greenstone belts. ▪ K4-5 prospects has potential to host

  3. Slide 3: Guyana – Yono, Not Your Average Nearology Play

    Guyana – Yono, Not Your Average Nearology Play TSX-V: TAJ Surrounded by G2 Goldfields & G Mining’s Oko and Oko West Projects 301 acres. Medium Scale Mining Permit of 1.5km x 1km. Small “Maybe a Postage stamp” but valuable. YONO G2 G Mining Co-incidentally, Guyana seems to specialize in highly valuab

  4. Slide 4: Just 90m from a planned open pit containing 4.8 Moz Au

    Yono – Just 90m from a planned open pit containing 4.8 Moz Au. TSX-V: TAJ Yono in Relation to Resources of G2 and G Mining S3 S5 ▪ Showing surface trace and down dip extent of resources of the Oko (G2) and Oko West Projects (G Mining). G2-Oko Main Zone 686k oz Au @ 9.03g/t Ind. ▪ Ghanie resource con

  5. Slide 5: Just Maybe Needed For Unimpeded Mine Development of Oko?

    Yono – Just Maybe Needed For Unimpeded Mine Development of Oko? TSX-V: TAJ TAJIRI Blast YONO Radius South-eastern Yono will be in the blast radius of the Kairuni Pit; ▪ All of the Eastern half of Yono will be in the blast radius of a pit on Ghanie; ▪ What if there was a small-scale mining treatment

  6. Slide 6: Tajiri – Dips & Pits Around the Place

    Tajiri – Dips & Pits Around the Place: 300 - 640m deep 60-70 east dips TSX-V: TAJ Showing Reported Information regarding Dips of Deposits in the Yono-Oko area 1 2 G2 May 2024 43-101 states: “The general deposit bearings and dips are 0 strike direction and -70 dip. In the OMZ the strike variation

  7. Slide 7: Yono – Potential For Deeper Resource Capture

    Yono – Potential For Deeper Resource Capture TSX-V: TAJ Showing surface envelopes of potential open pits of 100- 700m depth with 45 total wall slopes around simple down dip extensions of Ghanie’s surface trace. Envelopes shown in increments for each 100m of depth. ▪ Ghanie is currently being drille

  8. Slide 8: Additional Potential Ounce Capture – Ghanie West

    Yono – Additional Potential Ounce Capture – Ghanie West TSX-V: TAJ The Ghanie West Zone, is an underexplored 900m long zone of artisanal workings, G2 Drill holes lying between the Ghanie Zone and Yono. Likely OMZ S4 or S5 extensions. GDD 88 OKD 36 (0.85m @ 6.6g/t) GDD 58 Substantive bedrock (quartz

  9. Slide 9: Further Potential Ounce Capture Under Block 1

    Yono – Further Potential Ounce Capture Under Block 1 TSX-V: TAJ Here Yono is 90m from edge of Block 1’s shallow pit Unexplored, potential shallow extensions to Ghanie south are possible under Block 1 69m@ 1.9g/t ▪ Presently Kairuni Block 1 lightly drilled 58m@ 4.3g/t ▪ The zone of limited drilling e

  10. Slide 10: Maybe someone will want it to stop their pit flooding

    Yono – Maybe someone will want it to stop their pit flooding TSX-V: TAJ Yono controls the best location for construction of a dam to prevent / aid diversion of a ~4km2 Major stream major stream from flowing over debouching from the middle of the Ghanie Catchment Yono onto Ghanie Deposit Stream has a

  11. Slide 11: Oh and maybe there's gold there too – Grabs

    Yono – Oh and maybe there’s gold there too – Grabs: 800g/t, 126g/t & 22.7g/t Au. TSX-V: TAJ Grab Samples up to 800g/t Au from reconnaissance sampling together with extensive artisanal workings within and emanating from Yono indicate NE Corner G2 Oko Main Zone excellent potential. Quartz Float Sample

  12. Slide 12: Soil Geochem Trends from OMZ into Yono

    Yono – Soil Geochem Trends from OMZ into Yono TSX-V: TAJ To Oko Northwest G2’s soil sampling to the West of OMZ indicates a NW-SW trend from OMZ to Yono S2 - 008 / 88W Foliation Soil Au values Contoured from G2’s reported values • Green 25-100ppb Au Oko Main Zone • Orange 100-500ppb Au SW Elongati

  13. Slide 13: Magnetics & Topo Indicate Potential Fold Closure Target

    Yono – Magnetics & Topo Indicate Potential Fold Closure Target TSX-V: TAJ Reunion Scout RC Au Values S2 - 008 / 88W Foliation Oko Main Zone Anomalous gold values from > 500ppb Au Reunion’s RC geochemical Potential large F1 fold 100-500ppb Au closure within Yono & drilling follow a magnetic contact

  14. Slide 14: Yono – Putting it All together

    Yono – Putting it All together TSX-V: TAJ Oblique Aerial View of the Yono Property highlighting artisanal Worked Ravine Parallel trending 026 from Extent of workings to 1km west of Anomalous Reunion Scout holes towards OMZ the Kairuni-Ghanie-OMZ shear suggest its not the only workings Potential F1

  15. Slide 15: Yono – First Phase Exploration Plan

    Yono – First Phase Exploration Plan TSX-V: TAJ • Complete 43-101 • USD30,000 • Establish Camp • USD50,000 • 50m spaced ground magnetic + VLF survey - VLF survey to detect graphitic sediments which are major host rock for mineralization at OMZ and Oko Northwest. • USD100,000 • Traverse mapping in con

  16. Slide 16: Yono – Deal Structure

    Yono – Deal Structure TSX-V: TAJ • Tajiri to acquire a 65% interest in Yono by issuing the Vendor 40 million Shares valuing transaction at CAD 2.2M / USD 1.63M. Deal recognizes considerable embedded value of the property from its location irrespective of any exploration spend by Tajiri. • Post trans

  17. Slide 17: Tajiri – One gets a lot of value for: USD $5.4M

    Tajiri – One gets a lot of value for: USD $5.4M TSX-V: TAJ • Symbol TSXV: TAJ • Warrants & Options: 45,733,533 • $0.30 August 2025 20,602,934 • 52 Wk Price Range: $0.01 - $0.085 • $0.10 November 2024 14,680,599 • Shares On Issue: 133,666,618 • $0.10 January 2025 1,000,000 • $0.15 July 2025 8,450,000

  18. Slide 18: Board and Management

    Board and Management TSX-V: TAJ Experienced Board with > 20 Million Ounces Discovered, Western Australia, West Africa & Guyana Graham Keevil, President & Chief Executive Officer, Director Business analyst and financier with 18 years' experience in the mineral industry. Dominic O’Sullivan, Executive

  19. Slide 19: Disclaimers

    Disclaimers TSX-V: TAJ Cautionary Statement Regarding Forward-Looking Information: This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its business st

Tajiri Resources — Investor Presentation (August 2024) on 6ix