Raptor Metals Ltd · ASX:RAP
Raptor Metals — Diggers & Dealers Mining Forum 2026
19 slides from Raptor Metals's conference presentation, Aug 4, 2026
Slide 1: Investor Presentation
ASX Announcement | 4 August 2026 Investor Presentation Raptor Metals Limited (ASX: RAP) (“Raptor”) or (“the Company”) is pleased to release its updated Investor Presentation, which will be used during investor meetings at the Diggers & Dealers Mining Forum in Kalgoorlie this week. This announcement
Slide 2: Drill-Validated Copper Growth in Canada's Bathurst Mining Camp
Drill-Validated Copper Growth in Canada's Bathurst Mining Camp INVESTOR PRESENTATION – AUGUST 2026 ASX:RAP
Slide 3: 5 Reasons To Invest in Raptor Now
5 Reasons To Invest in Raptor Now Chester hosts a JORC 2012 Mineral Resource Final assays from all 16 HQ drill holes have Recent drilling returned copper, zinc, lead, of 6.685Mt @ 1.07% Cu, containing 158.6Mlbs validated the Chester Mineral Resource and silver and cobalt mineralisation across 13 cop
Slide 4: Why Copper – Why Canada – Why Now
Why Copper – Why Canada – Why Now
Slide 5: Bathurst Mining Camp
Bathurst Mining Camp Firefly Metals (FFM.AX) Green Bay Copper S0.4Mt M &| Resource @ 2.0% CuEq! | & 29,3MU Infer ° Newfoundland Osisko Metals (OSK.T0) Gaspé Past Production: T4Mt @ 0.9% Cu Québec » Novia Scotia Portland = 66 The Bathurst Mining Camp has produced over 475 million tonnes from more tha
Slide 6: Expanded New Brunswick Footprint
Expanded New Brunswick Footprint • JORC 2012 Resource: 6.685Mt @ 1.07% Cu (158.6Mlbs)1 • Objective: Validate and enhance the existing Chester JORC MRE19- hole diamond drill program completed March 2026(16 HQ and 3 PQ holes) • Final assay results from all 16 HQ drill holes have validated the existing
Slide 7: Refer to Appendix A; Recompliance Prospectus references
*Refer to Appendix A; Refer ASX Announcement – Recompliance Prospectus dated 10 October 2025 and Pre-Reinstatement Disclosure dated 7 January 2026. CuEq calculation methodology and metal assumptions refer Appendix / JORC tables in ASX announcement dated 27 May 2026.
Slide 8: Chester drilling results reference
2. Refer Chester drilling results announcement dated 13 July 2026.
Slide 9: Multiple zones of high-grade, sulphide-rich mineralisation
Multiple zones of high-grade, sulphide-rich mineralisation containing copper and previously unreported zinc, lead, and silver were intersected across all drill holes: • 14m @ 2.39% CuEq (0.74% Cu, 4.44% Zn, 1.6% Pb & 22.02g/t Ag) from 13m; and • 11.02m @ 2.04% CuEq (1.98% Cu, 0.5% Zn & 4.81g/t Ag) f
Slide 10: Resource Growth Potential
Resource Growth Potential Final two holes of the program, CDH015 and CDH016, tested the interpreted Copper Stringer Zone Broad copper intersections and west of the Central Zone. confirmed continuity strengthen confidence in Chester as a CDH015 broader mineralised stacked VMS 16.0m @ 1.26% and 16.4m
Slide 11: Coyote Project 16km Polymetallic Corridor
COYOTE PROJECT 16KM POLYMETALLIC CORRIDOR Mafic-hosted VMS analogous to producing Bathurst Camp deposits; historic (non-JORC) MRE: 3.3Mt @ 1.5% Cu (subject to validation and JORC assessment) Key Drilling Results 3.53% Cu over 15m (Hole ID F08-01) 2.12% Cu over 11 m (Hole ID F09-01) 4.08% Cu over 8.7
Slide 12: Headway Prospect
HEADWAY PROSPECT VMS-style massive sulphide system 3.8km from Brunswick No. 12 Comparable geological setting and stratigraphy to Brunswick No. 12 High-grade rock chip results at the Headway prospect includes 3.1% Cu, 7.8% Pb, 7.5% Zn and 110 g/t Ag Known mineralised horizon largely untested by moder
Slide 13: Next steps: BHTEM interpretation and drill planning
Interpretation of completed downhole BHTEM surveys Metallurgical test work from the 2026 drilling program, Planning the next phase of resource definition and step- across 11 holes and a 940m × 500m survey area to refine together with geological modelling, historic core sampling out drilling to evalu
Slide 14: Corporate Snapshot
Corporate Snapshot Board and Management Capital Structure Adam Sierakowski — Non-Executive Chairman Lawyer and founder of Palisade Corporate; 25+ years across M&A, IPOs, resources and corporate advisory. Currently a director of Kinetiko Energy ASX Code RAP (ASX:KKO) and Connected Minerals (ASX:CML).
Slide 15: Disclaimers
Disclaimers This presentation contains summary information about Raptor Metals Limited (“Raptor”, “Raptor Metals” or the The information in this presentation that relates to previously reported Exploration Results at the Company’s projects “Company”). The information in this presentation is of gener
Slide 16: References
References 1. *Refer to Appendix A, page 19 of Raptor Resources Ltd Presentation & Refer to Annexure E in the Company’s Re-Compliance Prospectus dated 10 October 2025; Pre-Reinstatement Disclosure dated 7 January 2026. Refer Appendix A 2. RAP ASX Announcement , Chester drilling results, dated 27 May
Slide 17: Appendix A
Appendix A INDICATED MINERAL RESOURCE 4.87 Mt @ 1.13% Cu: containing 120.28 Mlbs Cu, 13.66 Mlbs Pb, 10.52 Mlbs Zn & 69,000oz Ag INFERRED MINERAL RESOURCE 1.82 Mt @ 1.01% Cu: containing 38.35 Mlbs Cu, 3.17 Mlbs Pb & 1.57 Mlbs Zn Notes: Mineral resource estimates are reported at a cut-off grade of 0.5
Slide 18: Appendix B
Appendix B The historical resource estimates ("Headway Historical Resource Estimates") have been extracted from the Technical Reports entitled Evaluation Report dated 6 April 1966 and Exploration Consultants and the Report on Diamond Drilling on the Property of Headway Red Lake Gold Mines Limited, G
Slide 19: Company contacts
Company E. brettwallace@raptormetals.com M. +61 431 684 627 Media and Investor Relations E. melissa@nwrcommunications.com.au M. +61 417 094 855