Slide 1: Q3 2020 Operations and Financial Update
Q3 2020 Operations and Financial Update Third Quarter 2020 Mike Nicholson, CEO Christophe Nerguararian, CFO November 3, 2020 NC00185 p01 04.20

Slide 2: Q3 2020 Highlights
International Petroleum Corp. Q3 2020 Highlights(1) Q3 average net production of 41,800 boepd Production(1) Strong performance with faster than forecast production ramp-up at the Canadian assets Full year guidance revised upwards to above 41,000 boepd [Previously 37,000 to 40,000 boepd] Q3 operating

Slide 3: 2020 Production
International Petroleum Corp. 2020 Production Production – all assets Canada International Q3 2020 production of 41,800 boepd (1) 60 Low Pricing - Above forecast Bertam A20 online Bertam rig heavy lifts and move 50 Canada Paris Basin Bertam planned shutdown - Oil: Suffield and Onion Lake Thermal Ram

Slide 4: Production - Q3 Update
International Petroleum Corp. Production - Q3 Update Production Growth Through Time(1) 50 46 Increasing full year 2020 guidance >41 40 40 37 34 37 Previous guidance 37,000 to 40,000 boepd Mboepd Mboepd 30 30 YTD average net production 41,200 boepd 20 Expect full year 2020 average net production abov

Slide 5: 2020 Investment Strategy - Q3 Update
International Petroleum Corp. 2020 Investment Strategy - Q3 Update(1) CAPEX & Decommissioning OPEX Maintaining >50% reduction Continued delivery on OPEX reduction Low pricing strategy maintained in all regions Major oil assets ramped back up to pre-curtailment rates Expect to be towards lower end of

Slide 6: Maximising Liquidity Headroom
International Petroleum Corp. Maximising Liquidity Headroom(1) Credit facilities International facility increased to 140 MUSD; maturity extended to December 2024 Canadian facility refinanced to 350 MCAD; maturity extended to May 2022 No leverage covenants French 13 MEUR unsecured facility put in pla

Slide 7: Suffield Area Assets
Suffield Area Assets Suffield IPC Canada Suffield Asset(1) Steady performance from the Suffield gas asset Oil production ramped back up to pre-curtailment rates N2N EOR(2) pool production ramp up ahead of expectation CFB Suffield Alderson 0 KM 20 2020 development activity remains on hold IPC Licence

Slide 8: Onion Lake Thermal
IPC Canada Onion Lake Thermal(1) Strong reservoir performance at Onion Lake Thermal Ramp up ahead of forecast Continued production ramp up and rate optimisation in Q4 2020 Onion Lake Thermal D’ pad drilling completed in 2020 -> positioned for 2021 start-up R1W4 R27W3 Forecast Actual 16,000 D’ Pad F-

Slide 9: IPC Malaysia Operations Update
IPC Malaysia Operations Update(1) Malaysia High facility uptime and strong base well performance A15 activity suspended in 2020, side track planned for 2021 Maturation of 2021 organic growth programme New well target maturation Base well rate optimisation Bertam Field Gross Production A15 potential

Slide 10: IPC France Operations Update
Villeperdue Facilities Paris Basin IPC France Operations Update(1) France Stable production from all major producing fields Aquitaine Basin All development activity on hold due to low pricing environment Total to discontinue crude oil refining at the France Grandpuits facility in Q1 2021 Contract in

Slide 11: Sustainability & ESG
International Petroleum Corp. Sustainability & ESG Sustainability strategy Integration of all ESG aspects in our governance framework and business activities Publication of IPC’s first Sustainability Report in line with the Global Reporting Initiative Participant company to the United Nations Global

Slide 12: Third Quarter 2020 Financial Highlights
Third Quarter 2020 Financial Highlights 12

Slide 13: Financial Highlights
First Nine Months 2020 Financial Highlights Third Quarter First Nine Months 2020 2020 Production (boepd) 41,800 41,200 Average Dated Brent Oil Price (USD/boe) 42.9 41.1 Operating costs (USD/boe) (1) 12.4 11.9 Operating cash flow (MUSD) (1) 37.2 73.4 EBITDA (MUSD) (1) 34.3 65.4 Net result (MUSD) 8.8

Slide 14: Realised Oil Prices
First Nine Months 2020 Realised Oil Prices YTD Q3 2020 Q2 2020 Q1 2020 2019 2018 Brent 41.06 42.94 29.56 50.10 64.21 71.31 Malaysia 43.51 (+2.45) 45.55 (+2.61) 31.61 (+2.05) 48.92 (-1.18) 69.87 (+5.66) 74.88 (+3.57) France 32.83 (-8.23) 40.23 (-2.71) 24.08 (-5.48) 33.59 (-16.51) 63.46 (-0.75) 70.22

Slide 15: Realised Gas Prices
First Nine Months 2020 Realised Gas Prices YTD Q3 Q2 Q1 Full Year CAD/mcf 2020 2020 2020 2020 2019 Realised Price CAD/Mcf AECO 2.09 2.24 1.99 2.03 1.80 Empress 2.08 2.23 1.99 2.03 2.49 Empress / AECO differential Realised 2.12 (+0.04) 2.16 (-0.07) 1.93 (-0.06) 2.28 (+0.25) 2.77 (+0.28) AECO Day Ahea

Slide 16: Financial Results – Operating Cash Flow & EBITDA
First Nine Months 2020 Financial Results – Operating Cash Flow & EBITDA (1) Operating Cash Flow EBITDA 250 250 229.1 225.2 200 200 150 150 Million USD Million USD 100 100 65.4 50 73.4 50 0 0 9M 9M 9M 9M NC00184 p14 04.20 2020 2019 2020 2019 (1) Non-IFRS Measure, see MD&A 16

Slide 17: Operating Costs
First Nine Months 2020 Operating Costs (1) USD/boe USD/boe operating costs 20 20 16 16 2020 Operating Costs: 12 12 12-13 USD/boe guidance 8 8 4 4 0 0 Q1 2020 Q2 2020 Q3 2020 Q4 2020 Actual Actual Actual Forecast NC00184 p17 08.20 (1) Non-IFRS Measure, see MD&A 17

Slide 18: Netback (USD/boe)
First Nine Months 2020 Netback (1) (USD/boe) Third Quarter First Nine Months 2020 2020 Average Dated Brent oil price (42.9 USD/bbl) (41.1 USD/bbl) Revenue 24.8 19.6 Cost of operations -10.3 -10.1 Tariff and transportation -1.4 -1.3 Production taxes -0.7 -0.5 Operating costs (2) -12.4 -11.9 Cost of b

Slide 19: Cash Flows and Closing Net Debt
First Nine Months 2020 Cash Flows and Closing Net Debt(1) (MUSD) 0 0 -200 -200 Operating Cash Flow Development capex MUSD 73.4 MUSD -65.7 -250 -250 G&A MUSD -8.0 -300 Fx on net debt -300 Opening Net Debt MUSD 3.6 1 Jan 2020 Exploration & evaluation MUSD -304.5 (2) Closing Net Debt MUSD -4.2 30 Sep 2

Slide 20: G&A / Financial Items
First Nine Months 2020 G&A / Financial Items MUSD Third Quarter 2020 First Nine Months 2020 G&A 2.9 8.0 G&A – Depreciation 0.4 1.2 G&A Expense 3.3 9.2 Third Quarter 2020 First Nine Months 2020 Interest expense 3.1 9.5 Loan facility commitment fees 0.4 0.9 Amortisation of loan fees 0.6 1.4 Foreign ex

Slide 21: Financial Results
First Nine Months 2020 Financial Results 250 Revenue 250 MUSD 220.8 41,200 boepd 200 Production costs 200 MUSD -147.4 Operating costs (1) 11.9 USD/boe Million USD 150 150 Million USD 100 100 Cash Margin MUSD 73.4 Depletion 50 MUSD -91.0 50 0 G&A 0 MUSD -9.2 Gross profit Net result MUSD -23.4 Explora

Slide 22: Balance Sheet
First Nine Months 2020 Balance Sheet MUSD 30 Sep 2020 31 Dec 2019 Assets Oil and gas properties 1,119.8 1,105.5 Other non-current assets 172.9 147.1 Current assets 85.3 112.0 1,378.0 1,364.6 Liabilities Financial liabilities 301.4 244.7 Provisions 190.1 180.0 Other non-current liabilities 45.6 49.5

Slide 23: Financial Hedging in Canada
30 September 2020 Financial Hedging in Canada Oil Hedges Period Volumes Type Weighted bbls per day average per bbl October 1, 2020 - December 31, 2020 350 WTI SWAP CAD 71.25 October 1, 2020 - December 31, 2020 8,050 WCS SWAP USD 24.41 January 1, 2021 - March 31, 2021 2,200 WCS SWAP USD 27.28 April 1

Slide 24: Q3 2020 Highlights
International Petroleum Corp. Q3 2020 Highlights(1) Q3 average net production of 41,800 boepd Production(1) Strong performance with faster than forecast production ramp-up at the Canadian assets Full year guidance revised upwards to above 41,000 boepd [Previously 37,000 to 40,000 boepd] Q3 operating

Slide 25: Reader Advisory
Reader Advisory Forward Looking Statements This presentation contains statements and information which constitute “forward-looking statements” or “forward-looking information” (within the meaning of applicable securities legislation). Such statements and information (together, “forward-looking state

Slide 26: Reader Advisory
Reader Advisory Non-IFRS Measures References are made in this presentation to “operating cash flow” (OCF), “free cash flow” (FCF), “Earnings Before Interest, Tax, Depreciation and Amortization” (EBITDA), “operating costs” and “net debt”, which are not generally accepted accounting measures under Int

Slide 27: Reader Advisory
Reader Advisory Contingent resources are further classified based on project maturity. The project maturity subclasses include development pending, development on hold, development unclarified and development not viable. All of the Corporation’s contingent resources are classified as either developm

Slide 28: www.international-petroleum.com
www.international-petroleum.com 28
Source: Internet Archive copy of international-petroleum.com
More decks from International Petroleum Corp. (British Columbia)
Q3 2026 Earnings Presentation31 slides · Nov 3, 2026
Investor Presentation (October 2026)54 slides · October 2026
Q2 2026 Earnings Presentation32 slides · Aug 4, 2026
Q1 2026 Earnings Presentation32 slides · May 5, 2026
Q1 2026 Earnings Presentation29 slides · May 5, 2026
Investor Day (February 2026)75 slides · Feb 10, 2026
All 56 International Petroleum Corp. (British Columbia) decks