    Capital Markets Day 2017 » Stuttgart, 20 September 2017 Frank Mastiaux, CEO Thomas Kusterer, CFO

  2. Slide 2: Today's topics

    Slide 2: Today's topics

    Today’s topics Erneuerbare Energien EnBW 2020: Current status of strategy execution Top-Entwickler und Treiber des Strategic focus for EnBW towards 2025 Ausbaus Wind, Onshore und Main commercial and technical drivers of success Offshore in the offshore wind business 2

  3. Slide 3: Current status of strategy execution EnBW 2020

    Slide 3: Current status of strategy execution EnBW 2020

    Erneuerbare Energien Thomas Kusterer, CFO Top-Entwickler und Treiber des Current status of strategy Ausbaus Wind, Onshore und execution Offshore EnBW 2020 3

  4. Slide 4: EnBW 2020 strategy remains the framework for our ongoing transforming

    Slide 4: EnBW 2020 strategy remains the framework for our ongoing transforming

    EnBW 2020 strategy remains the framework for our ongoing transforming 2012 2020 Generation and Trading 1.2 -80% 0.3 € bn € bn Renewable Energies 0.2 +250% 0.7 € bn € bn Grids 0.8 +25% 1.0 € bn € bn Sales 0.2 +100% 0.4 € bn Capital Markets Day 2017 € bn € 2.4 bn € 2.4 bn in Adjusted EBITDA 4

  5. Slide 5: Nuclear fuel tax reimbursement a positive one-off effect

    Slide 5: Nuclear fuel tax reimbursement a positive one-off effect

    Nuclear fuel tax reimbursement a positive one-off effect, but no easing of efforts to deliver 2020 strategy H1 2017 H2 2017 7 June Federal Constitutional Court ruling Remaining ~€300m refunded in July declared nuclear fuel tax unconstitutional, leading to tax refund Additional ~€200m in interest als

  6. Slide 6: Nuclear waste storage: uncertainty eliminated

    Slide 6: Nuclear waste storage: uncertainty eliminated

    Nuclear waste storage: uncertainty eliminated Nuclear waste disposal fund €4.8bn paid into fund Cash outflow 3 July 2017; no P&L impact; Law approved by Brussels on 16 June balance sheet contraction Financial assets of approx. €10bn covering Contract signed on 26 June creates long- long-term provisi

  7. Slide 7: Asset Liability Management Model: provisions still covered after payment into fund

    Slide 7: Asset Liability Management Model: provisions still covered after payment into fund

    Asset Liability Management Model: EnBW nuclear and pension provisions still covered after payment into fund EnBW’s CF-based model in € m 100% Coverage Asset contribution 16.000 16,000 projected 2029 OCF contribution Provisions 12.000 12,000 8.000 8,000 Financial assets 4.000 4,000 2040 NO 800 impact

  8. Slide 8: Solid credit quality based on prudent financial policies

    Slide 8: Solid credit quality based on prudent financial policies

    Solid credit quality based on prudent financial policies Asset Liability Management Model: Operating business: Coverage of long-term pension and nuclear Management of net investment to control obligations net financial debt Active management of related financial Internal financing capability as new

  9. Slide 9: Half-year 2017 key financials underpin 2020 strategy execution

    Slide 9: Half-year 2017 key financials underpin 2020 strategy execution

    Half-year 2017 key financials underpin 2020 strategy execution Adjusted EBITDA Net debt in € m in € m 1,073 10,003 968 181 8,948 138 Sales Net debt relating to pension and nuclear obligations Grids 6,358 Net financial debt 5,383 +11% 611 -11% Renewable Energies 524 Generation & Trading Other 153 152

  10. Slide 10: First-time consolidation of VNG is a strong booster of the transformation

    Slide 10: First-time consolidation of VNG is a strong booster of the transformation

    First-time consolidation of VNG is a strong booster of the transformation of our business portfolio EnBW is number 2 in gas transportation and number 3 in gas supply VNG a perfect fit with EnBW 2020 strategy ~50% of VNG’s future earnings are regulated First-time consolidation adds €41m to EnBW’s adj

  11. Slide 11: We will deliver earnings turnaround in 2017

    Slide 11: We will deliver earnings turnaround in 2017

    We will deliver earnings turnaround in 2017 Renewable Generation and Sales Grids Group Energies Trading Adj. EBITDA 2016 250 1,004 295 337 1,939 in € m Forecast 2017 +15 to -5 to +5 to -10 to 0 to in % +25 +5 +15 -20 +5 Capital Markets Day 2017 11

  12. Slide 12: Portfolio transition shows substantial progress

    Slide 12: Portfolio transition shows substantial progress

    Portfolio transition shows substantial progress, in line with EnBW’s 2020 strategy Adjusted EBITDA1 Share of low-risk earnings 10% ~15% 15% ~17% 30% 48% 2012 33% ~15% 2017² 15% 2020 Sales 10% ~52% 40% Grids Renewable Energies 2.4 1.9 – 2.0 2.4 Generation &Trading Capital Markets Day 2017 € bn € bn €

  13. Slide 13: 2017-2019 investment program kept flexible

    Slide 13: 2017-2019 investment program kept flexible

    2017-2019 investment program kept flexible with focus on growth in low-risk businesses Investment/Divestment volume 2012–20201 Investment volume 2017–2019 in € m 14.1 Low-risk earnings (80%) 5.5 17% Growth investments 9.0 (77%) 3% 4.1 42% 5.1 8.6 1.4 Generation & Trading/Sales 4.9 3.7 Grids 38% Rene

  14. Slide 14: Efficiency targets already to be met by 2019

    Slide 14: Efficiency targets already to be met by 2019

    Efficiency targets already to be met by 2019 Efficiency programs: launch Efficiency measures: ramp-up in € m in €m 1,400 1,400 1,250 250 1,050 400 500 300 750 FOKUS 750 750 Additional program FOKUS 2012 2014 2016 2020 2016 2017 2019 › Unprofitable power plants incorporated in German power plants net

  15. Slide 15: Progress toward 2020 targets supports solid ratings

    Slide 15: Progress toward 2020 targets supports solid ratings

    Progress toward 2020 targets supports solid ratings One-notch downgrade by Moody’s in May 2017 – S&P and Fitch ratings confirmed; all agencies with stable outlook Long-term rating: Baa1 Long-term rating: A- Long-term rating: A- Outlook: stable Outlook: stable Outlook: stable Agencies expect continua

  16. Slide 16: Concrete measures underpin delivery of 2020 strategy targets

    Slide 16: Concrete measures underpin delivery of 2020 strategy targets

    Concrete measures underpin delivery of 2020 strategy targets Adjusted EBITDA 2017 15% › Efficiency programs 30% › No nuclear fuel tax from 2017 › Earnings contribution from VNG 15% 2020 › Growth in onshore wind › Growth in offshore wind: Hohe See/Albatros › Increasing sales earnings:  Exit from B2B

  17. Slide 17: Strategic focus for EnBW towards 2025

    Slide 17: Strategic focus for EnBW towards 2025

    Erneuerbare Energien Frank Mastiaux, CEO Top-Entwickler und Treiber des Strategic focus for Ausbaus Wind, Onshore und EnBW towards Offshore 2025 17

  18. Slide 18: Key elements of the energy business are shifting (again)

    Slide 18: Key elements of the energy business are shifting (again)

    Key elements of the energy business are shifting (again) – change becomes the norm Phase 1 Phase 2 Increasingly market-driven: Mainly driven by energy cost efficiency gains, technical policies and regulation innovation, changing customer needs, changing competitive landscape Increased competitivenes

  19. Slide 19: We have extended our strategic thinking towards 2025

    Slide 19: We have extended our strategic thinking towards 2025

    We have extended our strategic thinking towards 2025 Reasons for extension Methodology and approach Timely anticipation of market/environment and Medium-term planning 1 regulatory changes reaching end of long-term 2025 strategic period (2020) Best possible fit between market potential and EnBW 2 cap

  20. Slide 20: Our assessment of future trends pinpoints six key developments

    Slide 20: Our assessment of future trends pinpoints six key developments

    Our assessment of future trends pinpoints six key developments 1 Decarbonization continues to be a main driver of political and regulatory action 2 Renewable energies and grids will remain pillars of growth in the markets we serve 3 New competitors and technological developments will impact the valu

  21. Slide 21: Strategic conclusions we have drawn for our business towards 2025

    Slide 21: Strategic conclusions we have drawn for our business towards 2025

    Strategic conclusions we have drawn for our business towards 2025 Renewable energies, grids and customer-facing businesses will remain EnBW’s key future 1 growth areas We are developing new growth areas in the field of (critical) infrastructure, 2 including beyond energy 3 We attach great importance

  22. Slide 22: The German infrastructure market will grow strongly

    Slide 22: The German infrastructure market will grow strongly

    The German infrastructure market will grow strongly, with opportunities in our existing business portfolio and in areas beyond energy German infrastructure market in € bn 150 1 Enhanced emphasis on infrastructure aspects in our existing businesses 100 +50% Infrastructure New growth areas beyond ener

  23. Slide 23: Infrastructure pilots beyond energy already underway

    Slide 23: Infrastructure pilots beyond energy already underway

    Infrastructure pilots beyond energy already underway Pilot segment Business case Broadband/ Expand NetCom’s telco and broadband activities into major earnings pillar for 1 EnBW Group telco E-mobility/ Launch and build substantial e-mobility activities focused on grid and charging charging 2 infrastr

  24. Slide 24: Huge business opportunities in urban infrastructure development

    Slide 24: Huge business opportunities in urban infrastructure development

    Example: Huge business opportunities in urban infrastructure development Intelligent street Broadband expansion lighting Public security Sustainable mobility infrastructure 13 9 Integrated development Environmental sensors of residential areas 8 Smart customer Traffic and parking solutions managemen

  25. Slide 25: Specific growth targets until 2025

    Slide 25: Specific growth targets until 2025

    We have defined specific growth targets until 2025, with a clear set of priorities Development of earnings In € bn 0.1–0.2 3.0–3.3 0.3–0.4 0.2–0.3 2.4 Sustainable power System-critical Intelligent infrastructure infrastructure infrastructure for the customer 2020 2025 › Expansion of onshore › Expans

  26. Slide 26: Investment priorities 2021–2025

    Slide 26: Investment priorities 2021–2025

    Resulting investment priorities 2021–2025: 80% targeting growth, 90% targeting regulated businesses Allocation of investment spending Intelligent Growth Existing business Sustainable infrastructure for activities power 10% the customer 20% infrastructure 30% €10bn €10bn 80% 90% (quasi) 60% System-cr

  27. Slide 27: Strategic long-term plan: growth and improved financial situation by 2025

    Slide 27: Strategic long-term plan: growth and improved financial situation by 2025

    Strategic long-term plan: growth and significant improvement in our financial situation by 2025 Significant increase in operating result (adjusted EBITDA) to ≥ €3bn (approx. +30% compared to 2020 target) Increased retained cash flow, stronger balance sheet and higher quality earnings €10bn total (gr

  28. Slide 28: Clear-cut goals for EnBW in 2025

    Slide 28: Clear-cut goals for EnBW in 2025

    Clear-cut goals for EnBW in 2025 EnBW transformed into a sustainable and innovative infrastructure company Balanced portfolio with three key areas and high proportion of stable and regulated businesses: power, infrastructure, customers New growth areas beyond energy closely linked to EnBW’s core com

  29. Slide 29: Main commercial and technical drivers of success in offshore wind

    Slide 29: Main commercial and technical drivers of success in offshore wind

    Erneuerbare Stefan Kansy,Energien New Projects Offshore Top-Entwickler und Treiber des Main commercial and technical Ausbaus Wind, Onshore drivers of success in theund Offshore offshore wind business 29

  30. Slide 30: Topics

    Slide 30: Topics

    Topics Portfolio and status update How does the world‘s first zero-subsidy bid work? EnBW’s path to its current market position The future of offshore wind – EnBW’s next steps Capital Markets Day 2017 30

  31. Slide 31: Offshore wind portfolio and project pipeline

    Slide 31: Offshore wind portfolio and project pipeline

    Offshore wind portfolio and project pipeline › Installed capacity 2015: 336 MW › Under construction: 609 MW › Secured pipeline: 900 MW EnBW He Dreiht: ~900 MW Barhöft EnBW Hohe See: 497 MW Rostock EnBW Albatros: 112 MW › 71+16 = 87 x Siemens SWT 7.0-154 on monopile foundations Hamburg › Commissionin

  32. Slide 32: Update on the EnBW Hohe See and Albatros offshore wind farms

    Slide 32: Update on the EnBW Hohe See and Albatros offshore wind farms

    Update on the EnBW Hohe See and Albatros offshore wind farms › Partner on board › Key equipment secured › HS3: all lots started Design › Design ready and certified Fabrication Installation › FOU4, IAG5, OSS6: 2018 › ALB: directly after HS › ALB1: new OTM2 › WTG7/feed-in: 2019 Capital Markets Day 201

  33. Slide 33: Update on the EnBW Hohe See and Albatros offshore wind farms

    Slide 33: Update on the EnBW Hohe See and Albatros offshore wind farms

    Update on the EnBW Hohe See and Albatros offshore wind farms Capital Markets Day 2017 Offshore Substation (Hoboken, Belgium) Internal array grid (Lochem, The Netherlands) 33

  34. Slide 34: Update on the EnBW Hohe See and Albatros offshore wind farms

    Slide 34: Update on the EnBW Hohe See and Albatros offshore wind farms

    Update on the EnBW Hohe See and Albatros offshore wind farms Capital Markets Day 2017 1st coated monopile (Rotterdam, The Netherlands) Transition piece (Hoboken, Belgium) 34

  35. Slide 35: How does the world's first zero-subsidy bid work?

    Slide 35: How does the world's first zero-subsidy bid work?

    How does the world‘s first zero-subsidy bid work? He Dreiht Technical aspects Current state of project development › Size: 63 km2 › Approval granted since 2007 › Water depth: 39-40 m › Principal surveying of seafloor and › Distance to shore: 85 km subsoil in 20112 › Wind speed: ø 10.1 m/s › Years of

  36. Slide 36: Remuneration for offshore wind in Europe: declining since 2015

    Slide 36: Remuneration for offshore wind in Europe: declining since 2015

    Remuneration for offshore wind in Europe: strong trend of declining remuneration since 2015 Projects in order of FID (€/MWh) Competitive tenders 175 164 140 103 Rostock 73 65 50 55 0,0 No subsidy Walney (UK) Beatrice East Anglia Horns Ray Borssele Vesterbay Kriegers Borssele 1. German Capital Market

  37. Slide 37: Two rounds of offshore wind auctions in 2017/2018

    Slide 37: Two rounds of offshore wind auctions in 2017/2018

    Two rounds of offshore wind auctions in 2017/2018 – overview of the competitive situation Competition within cluster Competition across all clusters 900 ~800 900 ~800 ~7.200 Cl.1 Cl.5 4.700 NOR-1-1 Projects NOR-5-2 Projects 1.550 1.550 Baltic (2024) (2025) Sea 500 ~1,900 1.800 Qualified projects Gri

  38. Slide 38: Results of the first German offshore wind auction 2017

    Slide 38: Results of the first German offshore wind auction 2017

    Results of the first German offshore wind auction 2017 The German Federal Network Agency published its acceptance of the following bids on 13 April 2017 in accordance with § 15 WindSeeG in conjunction with § 35 section 1 EEG 2017: › Date of auction 03/04/2017 › Accepted volume 1,490 MW (of max. 1,55

  39. Slide 39: Unique conditions of the project

    Slide 39: Unique conditions of the project

    Unique conditions of the project EnBW He Dreiht combines cost and efficiency benefits in a unique way: 1. Project development, realisation and operation by a company with profound experience and existing portfolio 2. Size: 900MW – by far the largest single project in the auction 3. Synergies: EnBW H

  40. Slide 40: Success factor #1: experienced project developer – project portfolio

    Slide 40: Success factor #1: experienced project developer – project portfolio

    Success factor #1: experienced project developer Example: project portfolio › Installed capacity 2015: 336 MW › Under construction: 609 MW Kriegers Flak (DK): 2016 tender EnBW He Dreiht: ~900 MW Barhöft EnBW Hohe See: 497 MW Rostock EnBW Albatros: 112 MW › 71+16 = 87 x Siemens SWT 7.0-154 on monopil

  41. Slide 41: Success factor #1: experienced project developer – project team

    Slide 41: Success factor #1: experienced project developer – project team

    Success factor #1: experienced project developer Example: project team EnBW approach Areas of in-house expertise › Project office in Hamburg has grown continuously Project management since 2009 Wind turbine technology › All areas of expertise in project development Foundations and substation steel c

  42. Slide 42: Success factor #2: size of wind farm

    Slide 42: Success factor #2: size of wind farm

    Success factor #2: size of wind farm Comparison of project sizes Overview of the qualified projects according to size1 › EnBW He Dreiht was by far the largest project in the auction › Economies of scale: fixed planning, construction and operation costs distributed over a larger installed 900 generat

  43. Slide 43: Success factor #3: synergies in operation

    Slide 43: Success factor #3: synergies in operation

    Success factor #3: synergies in operation Example: EnBW cluster in the North Sea Joint offshore logistics for three wind farms with a capacity of more than 1,500 MW › EnBW cluster consisting of the Hohe See (497 MW), Albatros (116 MW) and He Dreiht (900 MW) wind farms › The small distance of just 7

  44. Slide 44: Success factor #4: time of commissioning in 2025 – grid connection schedule

    Slide 44: Success factor #4: time of commissioning in 2025 – grid connection schedule

    Success factor #4: time of commissioning in 2025 Example: schedule for connection to the grid in accordance with O-NEP Auction scheme and Offshore Network Development Plan (O-NEP) define the time schedule for the realisation of the accepted projects › Time schedules for the offshore wind farms under

  45. Slide 45: Success factor #4: time schedule & selection of technology

    Slide 45: Success factor #4: time schedule & selection of technology

    Success factor #4: time of commissioning in 2025 Example: time schedule & selection of technology Due to the later connection to the grid via NOR-7-1, the technology for EnBW He Dreiht only needs to be chosen in early 2022 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Regulation Around 5 ye

  46. Slide 46: Success factor #4: technology and innovation

    Slide 46: Success factor #4: technology and innovation

    Success factor #4: time of commissioning in 2025 Example: technology and innovation Turbine manufacturers are already developing the next generation of wind turbines › Current turbine technology in the 8 – 10 MW range with rotor diameters of 154 to 180 metres will be deployed in 2018/2019 Technology

  47. Slide 47: Success factor #4: enhanced yield, reduced foundation costs

    Slide 47: Success factor #4: enhanced yield, reduced foundation costs

    Success factor #4: time of commissioning in 2025 Example: enhanced yield, reduced foundation costs More powerful turbines with larger rotors have three positive effects: › Energy yield = function of rotor surface › Larger turbines mean that fewer turbines are required to › Effect of larger rotor dia

  48. Slide 48: Time to break even

    Slide 48: Time to break even

    Time to break even € 1. Drivers for lowering LCoE: a) Total size of wind farm (fixed cost degression) b) Technological developments/innovation (turbine capacity) c) O&M synergies with surrounding wind farms LCoE 2. Drivers for increasing merchant power prices: Margin a) Price increase for CO2 and fo

  49. Slide 49: EnBW's path to its current market position

    Slide 49: EnBW's path to its current market position

    EnBW’s path to its current market position Organizational aspects – Transform Expertise and excellence existing DNA as an asset operator to a best- Approach and skills in-class project team for offshore wind Benefit from decades of experience in developing, Start small and simple, transfer lessons l

  50. Slide 50: The future of offshore wind/EnBW's next steps

    Slide 50: The future of offshore wind/EnBW's next steps

    The future of offshore wind/EnBW’s next steps Future of offshore wind Next steps Mature markets (NL, F, D): increased competition, Completion of EnBW Hohe See and Albatros by more zero-subsidy bids/market integration end of 2019 Young markets (Taiwan, USA, Korea): establishment of regulatory framewo

  51. Slide 51: The future of offshore wind – EnBW's next steps

    Slide 51: The future of offshore wind – EnBW's next steps

    The future of offshore wind – EnBW’s next steps 1 2 3 Offshore wind will be a High competitiveness The Hohe See and significant pillar of our enables the successful Albatros offshore projects strategy even after 2020 acquisition of new are making a major Therefore, we will offshore wind projects, co

  52. Slide 52: Questions & Answers

    Slide 52: Questions & Answers

    Questions & Answers 52

  53. Slide 53: Disclaimer

    Slide 53: Disclaimer

    Disclaimer Unless indicated otherwise, all data contained hereinafter the context, but may also be identified by the use of the words refers to the EnBW group and is calculated according to IFRS. “may”, “will”, “should”, “plans”, “intends”, “expects”, “believes”, “assumes”, “forecasts”, “potentially

Source: Internet Archive copy of enbw.com

More decks from ENBW Energie Baden-Wuerttemberg AG

All 141 ENBW Energie Baden-Wuerttemberg decks