  1. Slide 1: Australian Site Tour - Ravensthorpe Nickel Operation

    For personal use only Australian Site Tour Ravensthorpe Nickel Operation Isak Buitendag General Manager 29 October 2008

  2. Slide 2: Important notices

    Important notices Reliance on third party information The views expressed here contain infor mation that have been derived from publicly For personal use only available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliab

  3. Slide 3: Agenda

    For personal use only Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance Slide 3

  4. Slide 4: Key messages

    For personal use only Key messages • First major nickel laterite project in production in a decade • Now ramping up to reach full nameplate capacity • The process plant technology works • Enhanced HPAL technology will help BHP Billiton to take advantage of laterite growth opportunities Slide 4

  5. Slide 5: Agenda

    For personal use only Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance Slide 5

  6. Slide 6: Safety performance

    For personal use only Safety performance Actions and priorities • Increasing compliance with BHP Billiton Fatal Risk Control Protocols • Leading by example in the field • Simple, integrated systems • Improving the working environment • Creating positive attitudes • Ensuring that team members (both e

  7. Slide 7: Workforce

    Workforce • A hybrid residential and fly-in fly-out For personal use only strategy – Residential - Hopetoun and Ravensthorpe – Bus-in, bus-out, Esperance – Fly-in, fly-out, Perth • A diverse group of 650 employees – 6% indigenous – 16% female – 7% international • Operation a part of the local commun

  8. Slide 8: Agenda

    For personal use only Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance Slide 8

  9. Slide 9: Overview statistics

    For personal use only Overview statistics Location: Ravensthorpe, Western Australia BHP Billiton 100% Ownership: Reserves: 235 mt at 0.67% Ni¹ Resources: 386 mt at 0.62% Ni¹ Production 50,000 tpa contained nickel Capacity: 1,400 tpa cobalt Expected mine life 21 years Overview: • Open cut mine and hy

  10. Slide 10: Mining overview

    For personal use only Mining overview • Open cut operation • Three ore bodies • Two ore types – Limonite, Saprolite • BHP Billiton employee operated • Two Liebherr 994 excavators • Ten Caterpillar 785 trucks • Five Atlas Copco L8 drill rigs • Ancillary mining fleet Slide 10

  11. Slide 11: Processing overview – ore handling and beneficiation

    For personal use only Processing overview – ore handling and beneficiation Slide 11

  12. Slide 12: Processing overview - leach

    For personal use only Processing overview - leach Slide 12

  13. Slide 13: Processing overview – hydro-metallurgy

    For personal use only Processing overview – hydro-metallurgy Slide 13

  14. Slide 14: Processing overview - utilities

    For personal use only Processing overview - utilities Slide 14

  15. Slide 15: Ramp-up production

    For personal use only Ramp-up production Nickel in MHP (kt) 9 8 7 6 5 4 3 2 1 0 H1 FY08 H2 FY08 Q1 FY09 times 2 Slide 15

  16. Slide 16: Indicative operating cost structure at full capacity

    For personal use only Indicative operating cost structure at full capacity Cash operating cost (%) Royalties Travel 3% 3% Diesel • AUD spend is approx 85% 7% Consumables / Other Reagents 13% 32% Maintenance 18% Labour 24% Slide 16

  17. Slide 17: Agenda

    For personal use only Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance Slide 17

  18. Slide 18: Key milestones

    For personal use only Key milestones • Operations workforce successfully recruited and prepared • Mining operations performing well • First production H1 FY2008 • First 5000t of MHP H1 FY2008 • Ramp up toward nameplate capacity • Process plant technology proved and performing to expectation. Slide 1

  19. Slide 19: Ramp-up – key issues summary

    Ramp-up – key issues summary Issue Remedy For personal use only Materials handling Support and equipment deployed Component redesign underway Beneficiation dewatering Work around successfully installed Successful pilot Long term dewatering solution in design Tank failures Technology sound Repairs su

  20. Slide 20: Key messages

    For personal use only Key messages • First major nickel laterite project in production in a decade • Now ramping up to reach full nameplate capacity • The process plant technology works • Enhanced HPAL technology will help BHP Billiton to take advantage of laterite growth opportunities Slide 20

  21. Slide 21: For personal use only

    édl bhpbilliton ircing the future