  1. Slide 1: 2006 Annual General Meeting

    Prairie Downs Metals Limited 2006 Annual General Meeting

  2. Slide 2: Disclaimer

    Disclaimer The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase any security in Prairie Downs Metals Ltd (“PDZ”) nor does it form the basis of any contract or commitment. PDZ makes no representation or warr

  3. Slide 3: Corporate Objectives

    Corporate Objectives 1. Increase the existing resource of one million tonnes at 8.3% zinc, 1.7% lead and 22g/t silver to a size that justifies mine development 2. Finance and develop a zinc mine with production commencing in 2008/09 3. Continue exploration with current evidence indicating potential

  4. Slide 4: Investment Rationale

    Investment Rationale 1. Strong future for zinc 2. Significant value in the current zinc resource 3. Excellent project economics 4. Outstanding exploration upside from a very large mineralised system Prairie Downs Metals Limited Page 4

  5. Slide 5: The Future for Zinc

    The Future for Zinc ¾ Main use is galvanising ¾ Strong demand ¾ Low price elasticity and limited substitution ¾ Stockpiles now very low ¾ No exploration, no new supply Prairie Downs Metals Limited Page 5

  6. Slide 6: Prairie Downs Metals Limited

    Prairie Downs Metals Limited Prairie Downs Zinc-lead-silver Perenjori Copper-lead-zinc- silver-gold Longreach Well Zinc-lead-silver Coppermine Bore Copper-gold- uranium Prairie Downs Metals Limited Page 6

  7. Slide 7: Existing Resources

    Existing Resources Lode Category Tonnes Zinc Lead Silver Zinc Lead Silver Grade Grade Grade Metal Metal Metal (t) (%) (%) (g/t) (t) (t) (oz) Main Indicated 802,000 8.0% 1.7% 21 64,160 13,634 541,543 Gabbro Inferred 124,000 6.9% 0.7% 5 8,556 868 19,936 East Inferred 106,000 11.9% 3.0% 47 12,614 3,180

  8. Slide 8: Potential Project Economics

    Potential Project Economics The following is based upon a minimum treatment rate of 250,000 tonnes of ore per year: ¾ Mine life of eight years ¾ Producing 20,000 tonnes of zinc & 3,000 tonnes of lead per year ¾ NPV (8%) - $287 million at USD4,400/t zinc ¾ NPV (8%) - $50 million at USD2,000/t zinc NO

  9. Slide 9: Excellent Location and Infrastructure

    Excellent Location and Infrastructure Prairie Downs Metals Limited Page 9

  10. Slide 10: Outstanding Exploration Potential

    Outstanding Exploration Potential Prairie Downs Metals Limited Page 10

  11. Slide 11: Gravity over Magnetics

    Gravity over Magnetics Prairie Downs Metals Limited Page 11

  12. Slide 12: Zed Lode – A New Discovery

    Zed Lode – A New Discovery Prairie Downs Metals Limited Page 12

  13. Slide 13: Lode Mineralisation

    Lode Mineralisation Prairie Downs Metals Limited Page 13

  14. Slide 14: Questions

    Questions Prairie Downs Metals Limited Page 14