  1. Slide 1: An Exciting Copper-Gold-Silver Development Company

    An Exciting Copper-Gold-Silver Development Company …’producing’ results CORPORATE PRESENTATION June 2018

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation and responses to questions constitute "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information") concerning the business, operations and financial performa

  3. Slide 3: Content

    Content Company Share & Capital Milestones Management & Overview Structure Timeline Board 4 5 6 7 PEA 2018 YTD 2018 PFS WIP 2017 In Review & Outlook 10 16 20 22

  4. Slide 4: Company Overview

    COMPANY OVERVIEW Ø Flagship Project - Filo del Sol 100% Interest • Large-scale deposit w/several different zones of mineralization (AuOx, CuAuOx, Silver-rich, and primary sulphide) • Copper dominant benefiting from excellent gold and silver credits PACIFIC OCEAN • Top-rated mining jurisdiction along

  5. Slide 5: Share & Capital Structure Overview

    SHARE & CAPITAL STRUCTURE OVERVIEW Capital Structure* Share Ownership FIL TSX-V, Nasdaq First North Board & Management 5% $2.40 Share Price (CA$) 28% 76.7 Fully Diluted Shares (million) 67% $173.1 Market CapitalizaXon (CA$ million) Lundin Ins4tu4onal Family & Retail $2.80/$1.81 52 week high/low (CA$

  6. Slide 6: Milestones Timeline

    MILESTONES TIMELINE $CA/sh Positive metallurgical test work program September 2017 $3.50 Raised CAD 25.5m February 2018 $3.00 Raised CAD 20m October 2016 Resource Update August 2017 $2.50 $2.00 $1.50 Completed Exploration Program Positive PEA Results Positive Assay Results March 2017 November 2017 A

  7. Slide 7: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING Adam Lundin, President and CEO Wojtek Wodzicki, Technical Consultant • See biography on next slide (Board of Directors) • See biography on next slide (Board of Directors) Jamie Beck, Vice President Corporate Development

  8. Slide 8: Strong & Reputable Board of Directors

    STRONG & REPUTABLE BOARD OF DIRECTORS EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS Lukas Lundin, Chairman (non-executive) Paul McRae • Successful entrepreneur focused on natural • Distinguished global reputation in project and resources. construction management for both sur

  9. Slide 9: The Filo del Sol Project

    THE FILO DEL SOL PROJECT 9

  10. Slide 10: Preliminary Economic Assessment (PEA)

    PRELIMINARY ECONOMIC ASSESSMENT (PEA) USD 1,163m Pre-Tax NPV8% & IRRF 28.7% IRR Ø SRK Consulting (Canada) USD 705m NPV Inc. commissioned Sept AYer-Tax NPV8% & IRR 23.3% IRR 2017 Undiscounted AYer-Tax Cash Flow (LOM) USD 1,763¸m Payback Period from start of processing 3.6 Years (undiscounted, aYer-ta

  11. Slide 11: PEA - Resource Overview

    PEA - RESOURCE OVERVIEW PEA FOCUSED ON THE LEACHABLE ZONES WITHIN THE OVERALL RESOURCE GOLD OXIDE – COPPER-GOLD OXIDE - SILVER INDICATED PORTION OF RESOURCE ONLY Gold Oxide Zone Copper Gold Zone Silver Zone • 59 Mlbs of copper • 1.6 Blbs of copper • 0.4 Blbs of copper • 710 koz of gold • 1.6 Moz of

  12. Slide 12: PEA - Resource Overview: Cut-off Grades

    PEA - RESOURCE OVERVIEW ZONES CUT OFF GRADES - BASE CASE HIGHLIGHTED Gold Oxide Tonnes Cu Tonnes Au Cu Ag Au lbs Cu AgOunces AulbsOunces Cu Ag Ounces Au Ounces Ag CutoffZone Category Cutoff Category (millions) (%) (millions) (g/t) (%) (g/t) (g/t) (millions) (g/t) (thousands) (millions) (thousands) (

  13. Slide 13: PEA – Estimated Revenue Contribution

    PEA – ESTIMATED REVENUE CONTRIBUTION PROPOSED ANNUAL METAL PRODUCTION PROFILES Revenue by Metal 900,000 700,000 000s USD 500,000 300,000 100,000 (100,000) -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 Produc4on Year Copper Gold Silver LoM Revenue Contribu4on (by Metal) See News Release dated November 28, 2017

  14. Slide 14: PEA – Production Estimates

    PEA – PRODUCTION ESTIMATES PROPOSED ANNUAL METAL PRODUCTION PROFILES Recovered Cu (kt) Recovered Au (koz) 80 72 200 178 175 68 69 70 58 58 57 148 60 54 150 131 50 48 109 107 102 109 111 118 000's ounces 000's tonnes 50 42 105 40 34 100 78 28 30 20 50 8 20 10 - - - - - - -2 -1 1 2 3 4 5 6 7 8 9 10 11

  15. Slide 15: PEA – Proposed Recovery Methods

    PEA – PROPOSED RECOVERY METHODS COMMONLY USED TO RECOVER GOLD, SILVER, AND COPPER FROM OXIDE ORES Simple and Low-Cost Proposed Heap-Leaching Operation • PEA assumes process feed is mined and placed on one of three leach pads or “heaps” • It is sprinkled with a solution that dissolves the metals • Me

  16. Slide 16: 2018 Year to Date

    2018 YEAR TO DATE Ø Capital Raise (closed Feb 28, 2018) • C$ 25.5 Million Gross Proceeds • C$ 15.3 million - Bought Deal o 5,894,231common shares at C$2.60/share • C$10.2 million - Non-Brokered Private Placement (concurrent) o 3,938,964 common shares at C$2.60/share Ø Wrap-up of 2017/2018 Field Seas

  17. Slide 17: 2017/2018 Field Program Assay Results

    2017/2018 FIELD PROGRAM ASSAY RESULTS 50m of 236.4 g/t silver, 0.56% copper, 0.50 g/t gold and 36m of 1.45% copper ( ( )URQWHUD)DXOW HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t Zone Purpose VRC135 134 250 116 0.33 0.4 38 Filo Resource Conversion incl 178 198 20 0.54 0.96 208 2SHQ VRC136 40

  18. Slide 18: 2017/2018 Field Program Assay Results

    2017/2018 FIELD PROGRAM ASSAY RESULTS 68m of 0.74% copper, 1.34 g/t gold, 100.1 g/t silver and 64m of 1.10% copper, 0.69 g/t gold ( ( )URQWHUD)DXOW 2SHQ HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t Zone Purpose VRC154 94 176 82 0.29 0.25 3.2 Filo Resource Addition 1 incl 168 176 8 0.63 0.61

  19. Slide 19: 2017/2018 Field Program Assay Results

    2017/2018 FIELD PROGRAM ASSAY RESULTS 130m of 1.25% copper and 40m of 1.50 g/t gold HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t Zone Purpose ( ( )URQWHUD)DXOW FSDH016 30 92 62 0.21 0.18 103.1 Resource incl 68 88 20 0.2 0.16 293.5 Filo Conversion 2SHQ incl 82 86 4 0.22 0.19 1001 and Additio

  20. Slide 20: Pre-Feasibility Study – 2018 WIP & Outlook

    PRE-FEASIBILTY STUDY – 2018 WIP & OUTLOOK Ø 2018 Field Work Program • Planning for the 2018 program • 10km drill program • Infill/resource conversion • Metallurgical sampling • Geotechnical information • Step out drilling • Metallurgical test work • Geotech • Water drilling • Environmental baseline

  21. Slide 21: PFS & Expansion of Project Opportunities

    PFS & EXPANSION OF PROJECT OPPORTUNITIES Ø Unique processing options to evaluate at PFS • Fast leach kinetics suggest a simple wash stage to recover the soluble copper could replace the copper heap facilities, reducing capital and operating costs Ø Optimizing the mine plan • Opportunities exist to h

  22. Slide 22: 2017 in Review

    2017 IN REVIEW Ø Updated Mineral Resource Estimate • Effective July 2017 Ø Appointment of Adam Lundin, President & CEO • Wojtek Wodzicki remains Director, and assumes role as Advisor to Technical Team Ø Positive Metallurgical Test Work • Critical data for a Preliminary Economic Assessment (“PEA”) Ø

  23. Slide 23: Updated Mineral Resource Estimate

    UPDATED MINERAL RESOURCE ESTIMATE 1. CuAuOx copper equivalent (CuEq) assumes metallurgical recoveries of 82% for copper, 55% for gold and 71% for silver based on preliminary metallurgical testwork, and metal prices of USD 3.00/lb copper, USD 1,300/oz gold, USD 20.00/oz silver. The CuEq formula is: C

  24. Slide 24: Updated Mineral Resource Estimate

    UPDATED MINERAL RESOURCE ESTIMATE Ø 2016/2017 FIELD PROGRAM • <9,000m drilling • 61% increase to overall resource in all categories • 98% conversion of Inferred to Indicated • Four distinct zones based on metallurgical characteristics – AuOx, CuAuOx, Ag with underlying CuAu Sulphide (untested during

  25. Slide 25: 2017 Metallurgical Test Work Highlights

    2017 METALLURGICAL TEST WORK HIGHLIGHTS Ø Refined recovery estimates for the AuOx, and Cu-AuOx zones at Filo del Sole through column leaching and sequential column leaching. • Cyanide column leach tests on AuOx material returned Au of 92.8% and Ag of 69.8%, • Sequential, acid-Cu-AuOx material yielde

  26. Slide 26: Notes

    NOTES 26

  27. Slide 27: Notes

    NOTES 27

  28. Slide 28: Filo Mining Corp. contact details

    Filo Mining Corp. Suite 2000 885 West Georgia Street Vancouver, BC Canada V6C 3E8 filo-mining.com info@filo-mining.com +1.604.689.7842