Fortescue Ltd · ASX:FMG

Fortescue — Fortescue Metals Group — Diggers and Dealers 2008

31 slides from Fortescue's conference presentation, Aug 5, 2008

  1. Slide 1: Fortescue Metals Group – Diggers and Dealers

    Fortescue Metals Group For personal use only Diggers and Dealers 4 August 2008 Why do we exist? • To generate shareholder value by opening the Pilbara and breaking the duopoly • To create a new global iron ore supply and resource major Proving, once and for all, the efficiency of third party infrast

  2. Slide 2: Production Report to 31 July 2008

    Production Report to 31 July 2008 For personal use only Project formally certified as complete 18 July 2008 • 4.2mt shipped • US$390m gross revenues including shipping • 229 rail journeys • 26 vessels loaded • All cargoes accepted Fortescue Metals Group Ltd DISCLAIMER Important Notice The purpose of

  3. Slide 3: Executive Summary

    Executive Summary For personal use only Multi-decade market growth drives strategy • Permanent growth in China, India and Asia drives FMG strategy • FMG has major reserves and resources with very strong exploration upside • World class production assets commencing g in the bottom q quartile of cost

  4. Slide 4: Project Completion – July 2008

    Project Completion – 18 July 2008 Mined Preparation Railed Loaded For personal use only Last 4 Weeks 2,035,400 t 2,334,020 t 2,017,309 t 2,007,368 t (21/06/08 – 18/07/08) TARGET EXCEEDED TARGET Actual 887,315 t EXCEEDED TARGET Actual 821,806 t TARGET EXCEEDED EXCEEDED Actual 671,238 t Actual 613,851

  5. Slide 5: Surface miners hard at work

    Surface miners hard at work For personal use only Heavy haul fast trains keep stockpiles working 5

  6. Slide 6: Rolling stock exceeded expectations

    Rolling stock (particularly wagons) have exceeded expectations For personal use only Train unloader step from Rail to Port working well 6

  7. Slide 7: The Herb Elliot Port

    The Herb Elliot Port, an iconic part of Australian Infrastructure For personal use only A massive footprint with built in expansion capacity 7

  8. Slide 8: FMG: Australians working smart, working hard

    FMG: Australians working smart, working hard For personal use only 8

  9. Slide 9: Our raw material role in developing prosperity

    Our raw material role in developing prosperity For personal use only Wearing the Fortescue Colours 18 9

  10. Slide 10: China requires that Australia recover market share

    Actual & Project Chinese Iron Ore Imports For personal use only China requires that Australia recover Market Share Chinese Im ports by Source 80.00% Infrastructure constraints limits 70.00% Australia, leads to falling market share 60.00% 50.00% Aust Brazil 40.00% India S.Africa 30.00% Others 20 00%

  11. Slide 11: History remains the best guide to the future

    History remains the best guide to the future For personal use only The growth engines of Asia need the Pilbara • No iron ore major has the expansion leverage of Fortescue • Australia is the most competitive supplier to Asia Sovereign Risk Location • Three companies globally set price and dominate th

  12. Slide 12: Analysts prediction for relative operating costs

    Analysts prediction for relative operating costs Iron Ore Cash Costs for 2009 - y p Mine y and Pellet by Company For personal use only • Saleable 90 Port Loading 80 Royalty Pellets Transport p ArcelorMittal P US$/dry tonne in real terms Cleveland-Cliffs Pellets Maintenance 70 US Steel Pellets Rio Ti

  13. Slide 13: Hamersley Group Stratigraphy – Regional

    Hamersley Group Stratigraphy – Regional For personal use only A B C Microband Lateral Continuity • A to B – 10m apart (adjacent holes 5 cm at Wittenoom Gorge) • B to C – 130 km apart (Wittenoom to Paraburdoo) (Ewers and Morris 1981) Project pipeline underpinned by geology • The largest bedrock hoste

  14. Slide 14: FMG Pilbara Holdings Dwarfs Others

    FMG Pilbara Holdings Dwarfs Others FMG – 52,000 sq. km, Rio – 11,000 sq. km, (Robe 5,000 sq.km) BHP – 6,500 sq. km For personal use only FMG Pilbara resources and targets to underpin the project pipeline Current Current Further Total Area Resources* Targets Potential Upside Chi h t Range Chichester

  15. Slide 15: Product Quality Forecast

    Product Quality Forecast For personal use only • Actual shipments for 2008: – 4.2mt shipped to 21 customers – Fe and SiO2 on target – Higher calcined Fe – More Rocket Fines produced than HG The FMG Mining Systems 15

  16. Slide 16: Cloudbreak timelapse of construction

    Cloudbreak timelapse of construction For personal use only 4 June 2007 to 18 July 2008 Mining operations Excavator in Overburden action trucks Surface miner in action OVERBURDEN ORE BODY Ore trucks ORE BODY 16

  17. Slide 17: Surface miners well proven in operations

    Surface miners well proven in operations For personal use only Daydream Pit Hayman Pit Note the flat, clean, tyre friendly pit floor 17

  18. Slide 18: FY09 Mining Production – Overburden and Ore

    FY09 Mining Production - Overburden For personal use only Waste Mined (BCM's) 7,000,000 70,000,000 6 000 000 6,000,000 60 000 000 60,000,000 5,000,000 50,000,000 Cum. BCM's 4,000,000 40,000,000 BCM's 3,000,000 30,000,000 2 000 000 2,000,000 20 000 000 20,000,000 1,000,000 10,000,000 0 0 Aug-08 Apr-0

  19. Slide 19: Australia's leading iron ore and infrastructure construction team

    Fortescue has Australia’s leading iron ore and infrastructure construction team For personal use only From Concept p y To Reality Fortescue Mine Site - 2007 Fortescue Mine Site - 2008 Cloudbreak Village – a new standard in Pilbara accommodation 19

  20. Slide 20: Pilbara's longest corporate airfield

    Pilbara’s longest corporate airfield For personal use only Major equipment maintenance shed 20

  21. Slide 21: Ore on Cloudbreak mine conveyor

    Ore on Cloudbreak mine conveyor from Surface Miner shuttle dump point For personal use only Screening plant 21

  22. Slide 22: World's largest radial stacker commences operations

    World’s largest radial stacker commences first operations For personal use only Stockpiles at Cloudbreak 22

  23. Slide 23: The Delivery Systems – Port & Rail

    The Delivery Systems – Port & Rail For personal use only Train Loader in operation 23

  24. Slide 24: Cloudbreak – Loading Trains

    Cloudbreak – Loading Trains For personal use only Fortescue’s operations team is proven From Concept To Reality Fortescue Rail Site - 2007 Fortescue Rail Site - 2008 24

  25. Slide 25: State of the art rail operations

    State of the art rail operations For personal use only Target - Lowest cost transport in the Pilbara Rail • Clean sheet design captures best of existing technology and takes it to the next step: – Bigger carrying capacity – Electronic braking system – Aerodynamics • 40 tonne axle loads • Low centre

  26. Slide 26: Port and loading systems

    Port and loading systems For personal use only From Concept To Reality Fortescue Port Site - 2006 Fortescue Herb Elliott Port - 2008 Port Operations 26

  27. Slide 27: State of the art port operations

    State of the art port operations For personal use only Target - Lowest cost transport in the Pilbara Port • Significant expansion area • Highly automated • Extensive use of conveyors • Largest shiploaders in Australia Train unloader operating at design 27

  28. Slide 28: Stacker & Reclaimer, ramping up

    Stacker & Reclaimer, ramping up For personal use only First Ore On Ship – 15 May 2008 28

  29. Slide 29: First commercial shipment arrives in China

    Fortescue’s first commercial shipment arrives in China – 29 May 2008 For personal use only Advanced Expansion Planning 29

  30. Slide 30: Expansion plan – Mine and Rail

    55 - 120 - 160 mtpa – Mine For personal use only • Place mine material handling detailed design contract • Place mine processing detailed design contract • Mobilise construction camp at mine • Complete construction camp build at Christmas Creek mine • Start mine and port site construction • Complete

  31. Slide 31: Expansion plan – Port

    55 - 120 - 160 mtpa - Port For personal use only • Start dredging 3rd berth • Start dredging of 4th berth at port • Install 3rd wharf at port • Install 3rd stacker • Install 4th wharf at port • Commission Power Generation plant at port • Install and commission, conveyors, 2nd shiploader and 2nd recl