Nevgold Corp · TSXV:NAU

Nevgold — Investor Presentation (October 2026)

31 slides from Nevgold's investor presentation, October 2026

  1. Slide 1: Corporate Presentation

    Corporate Presentation (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) October 2026 Fast-Track to Near-Term Antimony Production Right Team, Right Place, Right Time, Right Way Brandon Bonifacio, President & CEO: bbonifacio@nev-gold.com, 604-337-4997

  2. Slide 2: Forward Looking Statements & Disclaimers

    Forward Looking Statements & Disclaimers This presentation contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not a

  3. Slide 3: Mineral Resource Estimates

    Mineral Resource Estimates Limo Butte’s Mineral Resource Estimate (“MRE”) information is from the News Release dated July 15, 2026. The NI 43-101 Technical Report is filed on SEDAR+. Nutmeg Mountain’s Mineral Resource Estimate (“MRE”) information is from the News Release dated September 18, 2025. Th

  4. Slide 4: Attractive Locations – Focus on The Americas

    Attractive Locations – Focus on The Americas NevGold has four promising district-scale assets in top-tier jurisdictions in the Western USA Limousine Butte (Nevada) ✓ Carlin-style gold-antimony deposit ✓ Positive, near-surface, thick, oxide gold- antimony drill results ✓ Near-term antimony production

  5. Slide 5: Limo Butte District Activity – Surrounded by Majors

    Limo Butte District Activity – Surrounded by Majors • Freeport-McMoran (NYSE:FCX, US$69B mkt cap) has US$33M earn-in deal on Butte Valley porphyry for up to 80% (executed in October-2022) • Adjacent to our southwest • Drilling for large Cu porphyry system • Added claims on the Western boundary of Li

  6. Slide 6: 2026 Maiden Mineral Resource Estimate

    2026 Maiden Mineral Resource Estimate (“MRE”) – July 15 ANTIMONY: • Phase 1 “Project Jumpstart Antimony” - path to potential near-term antimony production: 6,900 Sb tonnes M&I at 0.28% Sb (2.3 Mt) and 500 Sb tonnes Inferred at 0.99% Sb (0.05 Mt); antimony material at surface and already mined in pas

  7. Slide 7: Project Jumpstart Antimony

    Phase 1) Project Jumpstart Antimony: Re-Process Leach Pads • 6,900 Sb tonnes M&I at 0.28% Sb (2.3 Mt) and 500 Sb tonnes Inferred at 0.99% Sb (0.05 Mt) • Oxide material on the leach pads was mined and leached for gold; antimony was not processed; unique opportunity to accelerate antimony production o

  8. Slide 8: Project Golden Bullet

    Phase 2) Project Golden Bullet: Commercial Mining Operation • Antimony Resource: 22,700 Sb tonnes M&I at 0.25% Sb (9.1 Mt) and 47,600 Sb tonnes Inferred at 0.18% Sb (26.5 Mt) • Gold Resource: 181,400 ozs M&I at 0.37 g/t Au (15.2 Mt) and 1,203,500 ozs Inferred at 0.32 g/t Au (117.5 Mt) • Continue to

  9. Slide 9: 2026-2027 Work Program

    2026-2027 Work Program NevGold is accelerating the path to oxide antimony production by 2028 at Limousine Butte Q3-2026 Q4-2026 Q1-2027 Q2-2027 Q3-2027 Mineral Resource Estimate (Sb / Au) Drilling = ~20km (two RC rigs) Drill Program - ~20km (Infill / Expansion) Metallurgical Testwork (Sb / Au) Furth

  10. Slide 10: Perpetua Comparison

    Perpetua Comparison NevGold is the 2nd company in the United States with a formal, commercial scale antimony-gold MRE (July 15) Area NevGold (NAU) Perpetua Resources (PPTA) Stock Exchange TSXV, OTCQX TSX, NYSE Market Capitalization ~C$200 million ~C$3.8 billion M&I: 29,600 Sb tonnes at 0.26% Sb, 181

  11. Slide 11: Perpetua Case Study

    Perpetua Case Study NevGold is the 2nd company in the United States with a commercial scale antimony-gold MRE • Perpetua Resources (NYSE:PPTA, TSX:PPTA, $3.8B mkt cap) is the most advanced gold-antimony project in the United States • PPTA market cap has increased 6-8x in last 2 years • NevGold marke

  12. Slide 12: Market Valuation Comparables – The Antimony Roadmap

    Market Valuation Comparables – THE ANTIMONY ROADMAP • Perpetua Resources is the only gold-antimony comparable in the United States: EV/Resource multiple of ~+C$450/oz Au1 • NevGold maiden antimony-gold MRE announced July 15, 2026 → immediate re-rate potential based on the 2026 MRE • After MRE, NevGo

  13. Slide 13: Untapped District Potential With Full Target Pipeline

    Untapped District Potential With Full Target Pipeline • Limo Butte has untapped district-scale potential • 130,000 meters of drilling completed, but many targets are undrilled / untested • New NevGold geological model will be key focus: • Drill through thrusted upper dolomite to target concealed Pil

  14. Slide 14: New NevGold Geological Model

    New NevGold Geological Model New NevGold geological models opens up large areas at the Project for mineralization expansion Resurrection Ridge Cross Section – Old Model Resurrection Ridge Cross Section – NevGold Model • NevGold spent the last 3-4 years updating the geological model at Limo Butte • V

  15. Slide 15: 2026 Drill Program Focus

    2026 Drill Program Focus – Continue to the East at Resurrection • CSAMT geophysics completed in 1H-2026; preliminary results show key expansion targets to the East • High-priority targets identified at Bullet Zone / Armory Fault with +4km of untapped expansion potential to the East of Resurrection R

  16. Slide 16: 2025 Bullet Zone Discovery

    2025 Bullet Zone Discovery Discovery of high-grade oxide antimony in new gold-antimony Bullet Zone with 2025 step-out drilling • NAU discovered Bullet Zone to the east of Resurrection Resurrection Ridge Plan Map Ridge with +150 meter step-out • Significantly expanded gold-antimony mineralization pot

  17. Slide 17: Metallurgical Testwork – Acid Leaching Oxide Antimony

    Metallurgical Testwork – Acid Leaching Oxide Antimony Antimony Rich Primary and Secondary Oxide Ore Crush Oxide Ore Hydrometallurgy Gold Ore - Low Sb (Acid Leaching) Crush Neutralization Sb Metal ROM Crushed Ore Leach Pad Agglomeration Tails Leach Pad Gold Recovery Plant 17

  18. Slide 18: Summary of Testwork Results

    Summary of Testwork Results • Acid Leaching – antimony metal would be produced on site through conventional leaching process – no reliance on downstream smelting and refining – Antimony recovery has minimal to no impact on the gold recovery in a potential combined future antimony-gold mine scenario

  19. Slide 19: Capital Structure

    Capital Structure Capital Structure & Share Ownership Shareholder Registry – October 2026 Total Issued and Outstanding 174,878,488 NevGold Insiders & Close Associates Options1 14,075,000 16% Current Float McEwen Warrants 2 13,084,254 31% 3% Total Fully Diluted 202,037,742 GoldMining 11% Market Capit

  20. Slide 20: Executive Team & Board of Directors

    Executive Team & Board of Directors Experienced team and board with a proven track record of success and relevant project development experience in the United States Executive Team Board of Directors Brandon Bonifacio • Mining executive with experience in M&A, project development, and project Giulio

  21. Slide 21: Other Projects – Idaho

    Other Projects – Idaho (Gold, Copper)

  22. Slide 22: 2026 Work Program – Other Projects

    2026 Work Program – Other Projects Other NevGold projects offer optionality and value levers for the company; main focus remains on Limo Butte Nutmeg Mtn. Zeus - Geophysics - Geophysics - ~5km drilling - 1st Phase - Engineering Exploration Drilling Study Q1-2026 Q2-2026 Q3-2026 Q4-2026 Nutmeg – Meta

  23. Slide 23: Project Benchmarking – Heap-Leach Grade & Strip Ratio

    Project Benchmarking – Heap-Leach Grade & Strip Ratio • 2026 MRE at Limo Butte1: 100% oxide, heap-leach of 181 kozs M&I at 0.37 g/t Au and 1.2 Mozs Inferred at 0.32 g/t Au (antimony value on top of the gold) • Higher grade Au mineralization (0.45 g/t Au cutoff) of 104 kozs M&I at 0.95 g/t Au and 448

  24. Slide 24: Nutmeg Mountain

    Nutmeg Mountain Asset Summary Project Summary (100% owned) Property Map • 1,724 hectares (17.2 km2): • 210 federal unpatented lode mining claims Property Size • 12 patented claims • 2 leases of private land • 80km NW of Boise on paved state highway (~1.5 hour drive); 20km east of Access town of Weis

  25. Slide 25: Nutmeg Mountain – 2025 Mineral Resource Estimate

    Nutmeg Mountain – 2025 Mineral Resource Estimate Significant upside potential to further unlock after completing 2025 MRE update • 2025 Mineral Resource Estimate base case at 0.20 g/t Au cut-off grade contains 1.2 Mozs Au Indicated and 550 kozs Au Inferred • Pit shell was calculated with US$2350/oz

  26. Slide 26: Nutmeg Mountain – 2025 Mineral Resource Estimate

    Nutmeg Mountain – 2025 Mineral Resource Estimate Near-surface, heap-leach gold deposit Key Highlights Nutmeg Mountain Sections1 • Near-surface, heap-leach gold deposit • Significant exploration upside potential laterally and at depth • Mineralization identified below $2350/oz pit- shell • High-grade

  27. Slide 27: Nutmeg Mountain – Exploration & Resource Opportunities

    Nutmeg Mountain – Exploration & Resource Opportunities Exploration and Resource Opportunities Plan View Claim Boundary • Many exploration opportunities along strike to the north and south that have not been tested by NAU or prior operators • High-grade feeder structure at depth remains key target 20

  28. Slide 28: Zeus Copper Project

    Zeus Copper Project Zeus Copper Project is located in the emerging Hercules Copper Trend Key Highlights • NevGold staked the Zeus Copper Project in 2023/2024 on the emerging Hercules Copper Trend • District activity has increased since the October-2023 copper porphyry discovery made by Hercules Meta

  29. Slide 29: Zeus Copper Project – District Geology Map

    Zeus Copper Project – District Geology Map Zeus Copper Project has the same geological signatures as the Hercules Project Key Highlights • NevGold has secured some of the most strategic, prospective ground in the emerging Hercules Copper Trend • Zeus offers the same geological signatures as Hercules

  30. Slide 30: Zeus Copper Project – 2025 Soil Survey Results

    Zeus Copper Project – 2025 Soil Survey Results Identified large soil survey anomaly with 2 key targets defined at Poseidon and Thorn Springs Key Highlights • +2.4 km copper-gold-molybdenum soil geochemical anomaly identified at the Poseidon Target on Bureau of Land Management (“BLM”) ground • +1.0 k

  31. Slide 31: Zeus Copper Project – Zeus vs. Hercules

    Zeus Copper Project – Zeus vs. Hercules Many geological similarities exist between the Zeus Copper Project and Hercules Copper Project in the District… • Zeus has similar grade, mineralization footprint and geological signatures to the discovery made by Hercules Metals at the Hercules Project 31

NevGold — Investor Presentation (October 2026) on 6ix