New Dawn Mining Corp.

New Dawn Mining — Investor Presentation (September 2012)

28 slides from New Dawn Mining's investor presentation, September 2012

  1. Slide 1: New Dawn Mining Corp.

    ~ ToRONTo stock Tsk EXCHANGE be TSX:ND New Dawn Mining Corp.

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT THIS PRESENTATION CONTAINS “FORWARD-LOOKING INFORMATION” WHICH MAY INCLUDE, BUT IS NOT LIMITED TO, STATEMENTS WITH RESPECT TO THE FUTURE FINANCIAL OR OPERATING PERFORMANCES OF NEW DAWN MINING CORP. (“NEW DAWN”), THE MATERIAL MINERAL PROPERTIES, THE FUTURE SUPPLY, DEMAND, INVENTO

  3. Slide 3: A Growing Gold Producer in Zimbabwe

    A GROWING GOLD PRODUCER IN ZIMBABWE September 2012 TSX:ND 3

  4. Slide 4: Key Investment Highlights

    KEY INVESTMENT HIGHLIGHTS Zimbabwe is geologically rich – under- developed – under-explored • New Dawn’s assets in very favourable geological settings • Six gold mines in three significant camps with great on/off site potential • Targeted consolidated annualized gold production approximately 50,000

  5. Slide 5: Status of Indigenisation & Political Developments

    STATUS OF INDIGENISATION & POLITICAL DEVELOPMENTS Indigenisation Economic Empowerment ‘IEE’ law requires ALL businesses in Zimbabwe to have 51% shareownership by local Zimbabweans that have met a defined value • New Dawn’s Zimbabwe subsidiaries are currently considered non-indigenous com panies • Pr

  6. Slide 6: Experienced Management

    EXPERIENCED MANAGEMENT Ian R. Saunders, BSc – President and CEO • Resident of Zimbabwe • 19 years mining experience with over 15 years at the Company’s properties • Originally Chief Metallurgist at Turk Mine – promoted to GM in 1997 • 2006 appointed President and COO of New Dawn • 2008 appointed CEO

  7. Slide 7: International Board of Directors

    INTERNATIONAL BOARD OF DIRECTORS Robert N. Weingarten, BA, MBA – Executive Chairman • CFO of New Dawn from July 2000 to August 2005 • President from October 2002 to August 2005 • Chairman since August 2006 • Various international business interests Philip G. MacDonnell, BA (Hons), CA • Over 25 years

  8. Slide 8: International Board of Directors

    INTERNATIONAL BOARD OF DIRECTORS Dr. Jon North, BSc, MSc, PhD • International exploration geologist with over 20 years of experience • President and CEO of Northquest Ltd. TSX.V – NQ • Director of Bridgeport Ventures Inc. TSX – BPV Bryce Fort, BS Computer Engineering • Managing Director and a foundi

  9. Slide 9: Ownership Structure

    OWNERSHIP STRUCTURE 100% 85% OWNERSHIP OWNERSHIP TURK – ANGELUS MINE DALNY MINE OLD NIC MINE GOLDEN QUARRY MINE (processing plant for Camperdown Mine) CAMPERDOWN MINE VENICE MINE TSX:ND 9

  10. Slide 10: Three Phase Growth Strategy

    THREE PHASE GROWTH STRATEGY PRODUCTION EXPANSION • Growth fully supported from large independently audited gold resource; plant & equi pment in place • Approximately 50,000 ounces annualized gold production run rate by December 2012 • Five mines now operational EXPLORATION • Exploration properties w

  11. Slide 11: Zimbabwe: Economies of Scale

    ZIMBABWE: ECONOMIES OF SCALE THREE SIGNIFICANT GOLD CAMPS WITHIN A 300 KM RADIUS KARIBA HARARE Dalny Mine HWANGE Venice Mine MUTARE GWERU Golden Quarry Mine Turk – Angelus Mine Camperdown Mine BULAWAYO Old Nic Mine LEGEND MAJOR TOWNS BULAWAYO GOLD CAMP MAJOR GOLD MINES GWERU GOLD CAMP (>10,000KG AU

  12. Slide 12: Three Significant Gold Camps with Six Mines

    THREE SIGNIFICANT GOLD CAMPS WITH SIX MINES BULAWAYO GOLD CAMP GWERU GOLD CAMP KADOMA GOLD CAMP TURK – ANGELUS CAMPERDOWN DALNY OLD NIC GOLDEN QUARRY VENICE TSX:ND 12

  13. Slide 13: Attributable Reserves & Resources

    ATTRIBUTABLE RESERVES & RESOURCES Attributable Quantities Mass (tonnes) Grade (g/t) Gold (ounces) Mineral Reserves Proven 869,600 3.83 107,200 Probable 923,900 3.86 114,600 Total – P & P 1,793,500 3.85 221,800 Mineral Resources Measured 15,209,935 1.31 639,827 Indicated 6,674,410 4.43 950,180 Total

  14. Slide 14: Development Timelines

    DEVELOPMENT TIMELINES 2011 • Completed acquisition of 100% ownership of CAG – five of six gold mines operational • Increased production at all three gold camps and intensified exploration program defined • Achieved 40k ounces of annualized gold production by December 2011 2012 • Target of approximat

  15. Slide 15: Annualized Gold Production & Sales – Overview

    ANNUALIZED GOLD PRODUCTION & SALES – OVERVIEW $150M $75M Up to 100,000 Au oz $38M 50,000 Au oz 40,000 Au oz ACHIEVED End of 2011 End of 2012 2014 - 2015 • Revenue based on US$1,500 per gold ounce TSX:ND 15

  16. Slide 16: Exploration Overview

    EXPLORATION OVERVIEW • Greenstone Belts of Zimbabwe have been likened to those of Canada and Australia • Modern exploration techniques have yet to be applied in Zimbabwe … HUGE UNEXPLORED POTENTIAL • At mine site, ease of mining simplistic quartz reef structures has led to a lack of thorough geologi

  17. Slide 17: Exploration Project Pipeline

    EXPLORATION PROJECT PIPELINE TSX:ND 17

  18. Slide 18: Exploration Conclusion

    EXPLORATION CONCLUSION • Zimbabwe offers Blue Sky exploration potential in under-explored Greenstone Belts with excellent infrastructure • New Dawn controls prime geologically-favorable ground • New Dawn’s exploration pipeline is well-stocked with quality projects • Exploration areas include mine si

  19. Slide 19: Financial Highlights

    FINANCIAL HIGHLIGHTS As at June 30, 2012 Working Capital US$4.6M Cash and Equivalents US$1.3M Management and Director Ownershi p 6%+ Institutional Ownershi p 78%+ Major Institutional Shareholders Reflection Partners 30% Emerging Capital Partners 11% Six additional Institutional Investors 37% TSX:ND

  20. Slide 20: Financial Highlights – June 30, 2012

    FINANCIAL HIGHLIGHTS – June 30, 2012 Financial Highlights – Fiscal 3RD Quarter Ended June 30, 2012 • $15.16 million in revenues from gold sales ($13.78 million attributable) • $0.58 million allocated to common shareholders • $0.01 earnings per share (basic and diluted) • $0.83 million EBITDA • 9,536

  21. Slide 21: Financial Highlights – Year End

    FINANCIAL HIGHLIGHTS – YEAR END Financial Highlights – Fiscal Year Ended September 30, 2011 • $38.3 million in revenues from gold sales ($36.0 million attributable) • $4.3 million allocated to common shareholders • $0.10 per share (basic and diluted) • $6.6 million EBITDA • 26,689 ounces of gold pro

  22. Slide 22: Key Targets

    KEY TARGETS Key Forward Operating/Production Metrics and Targets • Operating cash flows being re-invested in Zimbabwe to fund expansion and development plans • Commissioning of Deswick Ultra Fine Grind Mill and Dump Re-treatment project at Turk Mine • Approximately 50,000 ounces annualized gold prod

  23. Slide 23: Share Capitalization

    SHARE CAPITALIZATION Symbols TSX: ND/Frankfurt: 3DM Current Share Price (September 4, 2012) CDN $0.80 per share Shares Issued (September 4, 2012) 43,612,383 Market Capitalization (September 4, 2012) CDN $34.9M Fully Diluted 48,020,764 52 Week High/Low CDN $1.39 – $0.69 Options and Warrants 40,000 @

  24. Slide 24: Comparables

    Ar go na ut $ 2,0 0 0 $ 6,0 0 0 $ 8,0 0 0 $ 4,0 0 0 $0 Av EV Per Gold Go Oz Produced ne lG ld W old Lt d es do M m ini e ng Lt Go ld d Cl M au ine de s Lt Re so d Or ur va ce na s St M Inc ine An ra dr ls ew Co Go rp Al ldf ex iel i ds Ol s ym M Lt d pu ine s ra Pa ls cif Co ic rp M M et ine an ra o

  25. Slide 25: Comparables

    Ri ch W m es on do tM $ 30 $ 60 $0 $ 15 $ 45 $ 75 m ine e s In Situ Value Per Gold Ounce Go Inc ld Av M ne ine lG s old Lt d M Ar ini ng go Lt Or na ut d va Go na ld M Lt M ine d et an r als or Co Re rp Cl so au ur de ce Re s Inc Ca so led ur ce St on ia s M Inc An dr i n ing ew Co G rp TSX:ND Ca ol

  26. Slide 26: Key Value Drivers

    KEY VALUE DRIVERS • Advancing production at three significant gold camps • Key components of Indigenisation Plan being implemented • Multiple high priority exploration targets • Continued growth in resource base • Track record of ‘in country’ operating success • Key management resides in Zimbabwe •

  27. Slide 27: Why New Dawn Mining?

    WHY NEW DAWN MINING? • Experienced management team • Operations are cash flow positive • Annualized gold production targets • Approximately 50,000 gold ounces by December 2012 • Up to 100,000 gold ounces by 2014 – 2015 • Significant Blue Sky exploration potential in Greenstone Belts • Committed to b

  28. Slide 28: Contact Us

    CONTACT US New Dawn Mining Corp. Suite 301 - 116 Simcoe St. Toronto, Ontario Canada M5H 4E2 1 416 585 7890 www.newdawnmining.com Richard Buzbuzian Investor Relations rbuzbuzian@newdawnmining.com 28