TAG Oil Ltd · TSXV:TAO
TAG Oil — Investor Presentation (August 2010)
36 slides from TAG Oil's investor presentation, August 2010

Slide 1: Corporate Presentation: TAG Oil: Technology, Exploration, Discovery
Corporate Presentation TAG Oil: Technology, Exploration, Discovery August 2010

Slide 2: Disclaimer
Disclaimer Undiscovered Resources and BOE Undiscovered Hydrocarbon-In-Place (“OOIP”), equivalent to undiscovered resources) is that quantity of petroleum that is estimated, on a given date, to be contained in accumulations yet to be discovered. There is no certainty that any portion of the undiscove

Slide 3: Hunt for Shale
Hunt for Shale Companies around the globe are hunting for Bakken and Barnett shale “look alike” plays that can unlock oil shale potential…. © 2010 Tag Oil Ltd., www.tagoil.com

Slide 4: The Entry Barriers to Shale Plays are High
Introduction The Entry Barriers to Shale Plays are High Most Bakken and Barnett lookalikes are: Highly developed Highly leveraged Locked up TAG’s shale plays are: Frontier basin Highly prospective Characteristics of shale meet or exceed those of the Bakken and Barnett Accessible to inv

Slide 5: New Zealand's Waipawa and Whangai Fractured Shale
Introduction New Zealand’s Waipawa and Whangai Fractured Shale TAG Oil: An early advantage TAG Oil controls over 80% of the prospective acreage in this Basin 14 billion barrel OOIP identified by independent analysts Sproule and AJM This estimate is based on only a small percentage of TAG’s tot

Slide 6: East Coast Basin Overview
Executive Summary East Coast Basin Overview Underexplored opportunity Conventional & unconventional targets Comparable to other world-class source rocks AJM undiscovered resource potential (p50) of 12.65 billion barrels of unconventional OOIP Sproule undiscovered resource potential (p50) of

Slide 7: Taranaki Basin Overview
Executive Summary Taranaki Basin Overview Production and exploration 100% working interests $35 million Cheal plant Optimizing the existing wells with good results Proved reserves on 8% of TAG’s permit; 92% of permit still to develop Significant reserve growth confirmed, additional reserve

Slide 8: TAG Oil's Billion Barrel Opportunity
Executive Summary TAG Oil’s 14 Billion Barrel Opportunity 2 million prospective acres: significant conventional and unconventional opportunities © 2010 Tag Oil Ltd., www.tagoil.com 8

Slide 9: Corporate Overview
Executive Summary Corporate Overview TAG Oil Ltd. New Zealand: Stable, fiscally attractive, under-drilled Working capital: $26 million, no debt, profitable, high net-back production Capital structure: 37.6 million shares o/s (26% insiders) and 43.6 million fully diluted Production: Significa

Slide 10: Management & Key Technical Team
Executive Summary Management & Key Technical Team Together for 7+ years, focused on New Zealand Garth Johnson CEO, CGA, 14 years focused on New Zealand acquisition, development and exploration Drew Cadenhead COO, P.Geol., 30 years experience, the last 10 focused on New Zealand Jack Doyle, P.En

Slide 11: © 2010 Tag Oil Ltd., www.tagoil.com
© 2010 Tag Oil Ltd., www.tagoil.com 11

Slide 12: The East Coast Basin Underexplored
East Coast Basin Exploration Overview The East Coast Basin Underexplored Frontier acreage with only 38 wildcats drilled since 1955 Significant number of oil and gas seeps identified on TAG acreage TAG is a first mover in recognizing an unconventional fractured oil-shale play Control & Opportun

Slide 13: A 3-Pronged Approach
East Coast Basin Exploration Overview A 3-Pronged Approach Stratigraphy 1) Shallow Conventional (Waitangi Hill): Shallow oil (200m-300m) historic oil discovery revisited 2) Deep Conventional: Miocene prospects (<1500m) 2-10 mm bbl / prospect potential reserve size 3) Unconventional: Widespread oil-s

Slide 14: Strategy #1: Shallow Conventional Targets
East Coast Basin Exploration Strategy #1: Shallow Conventional Targets Drilling “under the oil tree” First of three Cored Strat wells now complete at Waitangi Hill – shallow oil and gas at high pressure discovered 1912 Bore Hole still bubbling 50 degree API, sweet crude oil and gas today Histo

Slide 15: Strategy #2: Deep Conventional Targets
East Coast Basin Exploration Strategy #2: Deep Conventional Targets Deep conventional plays Potential for stacked conventional targets, as well 4-way dip closure on Miocene through Paleocene formations Sproule estimates 1.74 billion barrels OOIP of conventional oil Extremely over-pressured b

Slide 16: Strategy #3: Unconventional Targets
East Coast Basin Exploration Strategy #3: Unconventional Targets Extracting from source rock Oil- and gas-rich Waipawa and Whangai fractured shale system widespread & thickly developed across TAG’s holdings Improved horizontal, multi-stage fracturing technology optimizes extraction Comparable

Slide 17: Potential Fractured Shale: How New Zealand shale stacks up
East Coast Basin Potential Fractured Shale How New Zealand shale stacks up Unit Bakken Waipawa Liassic Whangai Depth (m) 2700 – 3500 0 – 5000 1650 – 1850 0 – 5000 Net Thick (m) 10 – 50 10 – 60 1 – 40 300 – 600+ Primary Perm 40 – 50 10 – 200 50 10 – 110 (microdarcies) Tmax (C) 420 – 450 430 – 445 445

Slide 18: East Coast Basin Summary
East Coast Basin Summary World-Class Upside Potential Billions of barrels of OOIP Widespread oil and gas seeps identified over 2 million acres Naturally fractured basin, significant over-pressuring, 50 Degree API oil = confidence in production potential Over 3,000 sections of land provide pote

Slide 19: © 2010 Tag Oil Ltd., www.tagoil.com
© 2010 Tag Oil Ltd., www.tagoil.com 19

Slide 20: Taranaki Exploration Overview
Taranaki Exploration Overview The Taranaki Basin Taranaki at a glance Proven basin: 600 million barrels of oil and 7 TCF of gas reserves Current production: 53,700 bbls/d, 397 mmcf/d Only 175 wildcats drilled since 1955 TAG is the 100% owner of reserves, production and infrastructure Signi

Slide 21: Taranaki Basin Strategy: Miocene Turbidite Sandstones
Taranaki Basin Strategy TAG’s Target: Miocene Turbidite Sandstones < 2000m Countless sandstone “lobes” deposited over millions of years Technically diligent step-out drilling focused on pool performance to date Step-out development wells targeting at least two-million barrels of new reserves per

Slide 22: 2 Major Formations: Mt. Messenger & Urenui
Taranaki Basin Strategy 2 Major Formations: Mt. Messenger & Urenui Urenui at ~1400 Meters: All vertical wells drilled through Urenui to get to Mt. Messenger formation Mt. Messenger at ~1800 Meters: Historically all Cheal wells produced from this formation 400 meters below Urenui © 2010 Tag Oil Ltd.,

Slide 23: Mt. Messenger Formation in Outcrop
Taranaki Basin Strategy Mt. Messenger Formation in Outcrop Mt. Messenger Formation Thin (~1m) individual sandstone beds Each “lobe” 150-200m across Sandstone beds separated by shale Each Mt. Messenger pool made up of hundreds of overlapping “lobes” covering an area of a few square kilometres

Slide 24: Vertical vs Horizontal Multi-Stage Frac Well
Taranaki Basin Strategy Vertical vs Horizontal Multi-Stage Frac Well Today, avg. 200 to 300 bbls/day from one vertical well One VERTICAL fracture more than doubled production rates Multiple fractures… © 2010 Tag Oil Ltd., www.tagoil.com 24

Slide 25: Cheal Step Out: Boosting Production & Recovery
Taranaki Basin Strategy Cheal Step Out: Boosting Production & Recovery Optimize existing wells Cheal A / B Blocks were the first developed, 10mm bbls OOIP here alone 8% recovery factor increased to 12% recently; more increases anticipated Today: Producing ~450 bbls/d All wells tied into the

Slide 26: Initial Horizontals: Mt. Messenger Formation
Taranaki Basin Potential Initial Horizontals: Mt. Messenger Formation ~1800m Multi-stage fracs Cheal BH-1: First horizontal well ever drilled in Mt. Messenger Formation – scheduled for Sept 2010 Multi-stage fracs targeting heart of Cheal A Pool Multi-stage fractures modeled to capture up to 25

Slide 27: Potential Impact on Production
Taranaki Basin Potential Impact on Production Ngatoro-7 frac captured 200% more reserves and increased production by 300% TAG’s Cheal A-7 frac increased production rate by 365% Frac investment payback = 7 weeks Highly conservative 500 bbl/d production increases projected for new drilling © 2

Slide 28: Initial Horizontals: Urenui Sandstone
Taranaki Basin Potential Initial Horizontals: Urenui Sandstone ~1400m Urenui Present in all 11 Cheal wells drilled to date Widespread Miocene-aged formation defined on 3D seismic Tested in 3 wells: all produced oil and gas, no water Waxy oil plugged up production strings, wells deemed uneconom

Slide 29: Cheal Step Out: Adding Reserves
Taranaki Basin Potential Cheal Step Out: Adding Reserves New potential Proven reserves and production in Mt. Messenger formation Widespread Urenui Formation expected to double OOIP estimates 3-D coverage of the entire area 4-5 further fault blocks all updip of regional oil / water line Up

Slide 30: Broadside Permit Targeting 30 mm bbls OOIP
Taranaki Basin Potential Broadside Permit Targeting 30 mm bbls OOIP 7,910 acres, 100% TAG-owned Urenui / Mount Messenger targets Drillable prospects identified by 3-D modeling indicate significant reserve discovery Directly offsets Kaimiro/Ngatoro producing pools: 25 million bbl proven BOE’s

Slide 31: Broadside: "Big 5" risk reducers present
Taranaki Basin Potential Broadside: “Big 5” risk reducers present Amplitude 2.5x 4-way dip closure Amplitude mirrors structure Located over Eocene-aged structural Adjacent to deep-seated fault First well to spud in Sept 2010 – vertical pilot with fracture stimulation; horizontal drilling t

Slide 32: Taranaki Basin Summary
Taranaki Basin Summary Low-Risk . . . and 100 Million Barrel OOIP Upside Significantly increasing production from reserves Proven reserves and production 2010 optimization efforts have exceeded expectations to date Targeting additional 30 million barrels adjacent to proven Kaimiro/Ngatoro pool

Slide 33: © 2010 Tag Oil Ltd., www.tagoil.com
© 2010 Tag Oil Ltd., www.tagoil.com 33

Slide 34: In Closing: TAG Oil's Opportunity
In Closing TAG Oil’s Opportunity Production and exploration assets Acquisition opportunities Utilizing North American technology to unlock massive potential Taranaki: 100 Million bbls OOIP Proved reserves, plus proven ability to increase reserves and production Development, step-out and ex

Slide 35: © 2010 Tag Oil Ltd., www.tagoil.com
© 2010 Tag Oil Ltd., www.tagoil.com 35

Slide 36: © 2010 Tag Oil Ltd., www.tagoil.com
© 2010 Tag Oil Ltd., www.tagoil.com
Source: Internet Archive copy of tagoil.com
More decks from TAG Oil Ltd
Investor Presentation (October 2026)16 slides · October 2026
Investor Presentation (August 2026)15 slides · August 2026
Investor Presentation (June 2026)17 slides · June 2026
Investor Presentation (March 2026)17 slides · March 2026
Investor Presentation (January 2026)16 slides · January 2026
Investor Presentation (December 2025)20 slides · December 2025