Power Minerals Limited · ASX:PNN
Power Minerals — PepinNini Minerals — Mining 2009
30 slides from Power Minerals's conference presentation, October 2009

Slide 1: Diversified Near Term Production Australian Exploration Company
Diversified Near Term Production 28-30 Oct Australian Exploration Brisbane Company 1

Slide 2: Capital Structure
Capital Structure (26th October, 2009) z 78,202,499 shares on issue z Currently 2,012 shareholders z 55% of issued capital held by top 20 shareholders z Currently capitalised at AUD$27 million z Current cash AUD$8.8 million (+ AUD$6 million expenditure from Sinosteel) 2

Slide 3: Corporate Management
Corporate Norman Kennedy Christopher Lambert Chairman & Managing Director Non-executive Director Exploration Geologist for over 30 years London based financial background Rebecca Holland- Holland-Kennedy Albert Harris Executive Director & Company Secretary Non-executive Director Administration and E

Slide 4: 36 exploration tenements covering 16,000 sq.kms
North Queensland (exploration) Musgrave Province (exploration) Robinson Range Iron Ore (exploration) Curnamona Province (U3O8 Development) 36 exploration tenements covering 16,000 sq.kms. 4

Slide 5: Queensland Projects: 100% interest in tenements
Queensland Projects 100% interest in 24 tenements 2,773 sq.kms 5

Slide 6: Tenements prospective for gold, copper, base metals, uranium, phosphate and potash
The tenements are prospective for gold, copper, base metals, uranium, phosphate and potash 6

Slide 7: Uranium tenement map
143° 00° EPM 17879 Ironhurst Nias EPM 18168 Log Creek EPM 17953 Robin Hood EPM 15440 Percyville ML 2720 Gooligoomba EPM 17918 Spring Creek EPM 15547 The Return EPM 16269 | Sandy Creek veesioeld Gold Mine v So rer ty oe Fletcher UM wa 18047 ee 1ss01 Dak Park West Fletcher Creek EPM 16917 EPM 18048 Lo

Slide 8: Uranium Targets
Uranium Targets O Uranium occurrences which have been inadequately tested by previous explorers and favourable geological settings for uranium mineralisation have been identified in 10 tenements O Principal targets are hard rock volcanic type deposits similar to the nearby Maureen and Ben Lomond Ura

Slide 9: Uranium, phosphate and potash
uranium, phosphate and potash 9

Slide 10: Uranium Phosphate Potash Targets
Uranium Phosphate Potash Targets O Numerous Uranium enriched Phosphate Rock prospects previously identified within EPM 14834 Plain Creek. Additional potential within Loyo and Rush tenements O Phosphate grades of up to 27% have been reported by previous explorers together with uranium grades of up to

Slide 11: Plain Creek Area
Plain Creek Area O Located within the Devonian Carboniferous Drummond Basin O Approx. 300kms by sealed road to the port of Townsville O Field reconnaissance and sampling programs have confirmed high grade uranium, phosphate and potash potential 11

Slide 12: Uranium mineralisation associated with phosphate-rich horizons
uranium mineralisation is associated with phosphate-rich horizons at the top of siltstone units within the Natal Formation and within the coarser grained arkoses of the Bulliwallah Formation (both of Lower Carboniferous age) 12

Slide 13: 127 sites inspected and surface samples collected
127 Sites have been inspected and 138 surface samples collected for assays Highest Uranium 3,513 ppm U3O8 from Sassafras Creek Prospect Highest Phosphate 21.4% P2O5 from Robyn Lorraine West Prospect Highest Potash 5.8% from Sassafras Creek & Homestead Prospects 13

Slide 14: Gold and Base Metals tenement map
143° 00" EPM 17879 Ironhurst ee _ oy EPM 18168 St Log Creek EPM 17918 Spring Creek ERY 15547 Theeturn Epuyez69 Sandyicreek —Hidson Gold Mine EPM 15523 EPM 18047 Oak Park EPM 17953 Robin Hood EPM 15340 Percyv¥e EPM 15801 West Fletcher Creek EPA teri? U) EPM 18048 Lower Percy ry . Koppol Creek EPM 154

Slide 15: Gold & Base Metals
Gold & Base Metals O Widespread copper, gold, silver and lead mineralisation has been identified in rock chip samples O 335 g/t gold, 85 g/t silver, 0.2% copper & 2.8% lead O 54 g/t gold, 870 g/t silver, 32.8% copper O 65.1g/t gold, 435g/t silver, 9.98% copper O 3.6g/t gold, 653g/t silver, 20.30% co

Slide 16: Gold & Base Metals prospects map
rae Th&Return Prospects © 1 ¢ te The Return EPM155479* Sandy Creek EPM16289 Unig : PY * Dividend Gully Freedom Percyville EPM15440 2 eT shy Priority Prospect Area Pepinnini Minerals Limited Soil Sampling Grid Regional Geology Cainozoie Eromanga Basin Kennedy Province Voleanics Kennedy Province Intru

Slide 17: Percyville EPM Union Mine Rock Sample Results
Pepinnini Minerals Limited Percyville EPM - Union Mine Rock Sample Results 1.9g/t Au, 65.1 g/t. Au, 435g/t Ag, 9.9% Cut 21.4git Ag 42.3g/t- Au, 154g/t Ag, 0.2% Cu 2.0g/t Au, 45.3g/t Ag inion, z ¢ ag 32.6g/t Au, 75) nongp 442. Sgt Au, agit Ag, 1.4% Cu x Sy 18y/t Au,39.9g/t Ag Eee 8B Cu 2.8g/t Au, 8.2

Slide 18: Percyville EPM15440 - Union Prospect Detail (Rock & Soil Results)
Percyville EPM15440 - Union Prospect Detail (Rock & Soil Results) 45.4git Au 125g/t Ag 47.0.4gj/t Au, 63.3g/t Ag, 2.31% cu A 3.14% Cu 2.6git Au , 2igit Ag ; \ 41.5g/t Au, 168git Ag, 1.39% Pb 243g/t Au = 234git Ag A 42.3q/t Au Lown t : . 154g/t Ag al a 0.2% Cu 435 ig ; y 26.8 gitAg a ee Rd | Y 1.6% P

Slide 19: 25m NS linespacing 30m height
25m NS linespacing 30m height 19

Slide 20: Union Project Uranium
Union Project Uranium 790000 E 791000 E 792000 E 793000 E 794000 E 7898500 N “| 7898500 N | 40.0 7897500 N “| 7897500 N eae 4 27.0 7896500 N “| 7396500 N 205 “| 14.0 7895500 N “| 7895500 N s 1.0 Cj 790000 E 791000 E 792000 E 793000 E 794000 E a

Slide 21: Primary quartz-chlorite-sulphide ore from the Union Prospect
Primary quartz-chlorite-sulphide ore from the Union Prospect 21

Slide 22: Percyville EPM15440 - Spring Valley Prospect Rock Chip Results
Percyville EPM15440 - Spring Valley Prospect (Rock Chip Results bo Helimagnetics) T.4git A 23:8 git Ad 9.7 git Al bg “a 2B80N Ag { 238 ght ig se, )2 ren se Au ASK Cu on Shee 98% CUS >) 433g AL 4.7% Pb lent Sion go 81.2 git Ag 90.1g/tAu 63.8g/t Ag 2.0.g/t Au S.6gitAu,B4gtAg ~ 2,6g/t Au, 30.8g/t Ag, 1

Slide 23: Z4git Au. 23.8 gitAd’\')” 9.7 git Au
Z4git Au. 23.8 gitAd’\')” 2 9.7 git Au eset ng 22th wh238 git Ag He 04 247 at Au 4.5% Cu 2.9% GU a GE CHL 3 ‘i , ABA GIEAL.” sits ; oe chaged’ 237 g/t Au 4.7% Pb Cy eee ; 6 bal gu 81.2 git Ag e a> |) AYO ~ 2.8% Cu 20 gftAu | a Ae ho Ge wy f 2.3git Au, 6.6 git Au, 8.4 git Ag _-- 49.8g/t Ag 2,6g/t Au,

Slide 24: Spring Valley Project Uranium Channel
SpringValley Project Uranium Channel 7893000 N 7893000 N

Slide 25: The Return EPM - Recent Polymetallic Rock Sample Results (Nov. 2008)
The Return EPM - Recent Polymetalic Rock Sampl e Results (Nov. 2008) 7 fy, 2git Au 19.1g/t Au ° Tg/t Ag 12g/t Ag 1.1% Pb i oe" Pb ax AS, - ™ Mageace) igh » h 40gitag a , = Se givauiaegt Ag 2 _ ‘ jp, GCs Bgit Au, 18git Ag ) N 219/PAU;49g't Ag 2.791t aul\a06 Big Ve ; - > ~ oe . 500m ent Gold Results E

Slide 26: The Return EPM15547 - Rock Chip Results (Gold)
The Return EPM15547 - Rock Chip Results (Gold) “AZ 7 5qit- AT PBS ye 1115 cobected by PN] > Tor (neta) r ~ 10g-1oz (n=30) . " ae = - 20,9g/t 1o-109 0 (n=a7) . , ” <19 (naa) 1G * Deel t «% Diy ha cu below detection (nil) : prea” sae = Vee values per tonne Au iS aug rc ; = 7 ~ . ee a id ’ A5git, erase

Slide 27: 80% of surface samples returned economic gold grades
80% of the 115 surface samples that have been collected by PepinNini for assays on this tenement have returned economic grades of gold with 15% returning more than 1oz/t 27

Slide 28: Forsayth Uranium Channel
Forsayth Uranium Channel 773000 E 774000 E 775000 E 776000 E 777000 E 778000 E 779000 E 780000 E T T T T T T T T T T T T T Ly + + bs eh cme ct + + + f + + 4 7939500 [+ + + + + + + + + + + + + A 7939500 -- eo «.. — + + + + + + + + + + + + 4 * = ~ 7938500 | +a eh + + + oo¢ + + + + + + {7938500 N ~ pF

Slide 29: Queensland Project Summary
Queensland Project Summary O 100% interest in 24 tenements covering 2,773 sq kms O Confirmed high grade gold, copper, uranium, phosphate and potash potential O Priority high grade shallow gold targets ready to drill 29

Slide 30: Thank You
Disclaimer: Thank You • The information in this presentation is published to inform you about PepinNini Minerals Limited and its activities. All reasonable effort has been made to provide accurate information, but we do not warrant or represent its accuracy and we reserve the right to make changes t
Source: Internet Archive copy of powerminerals.com.au
More decks from Power Minerals Limited
NWR Communications' Critical Minerals Webinar (April 2026)14 slides · April 2026
Investor Presentation (December 2025)22 slides · Dec 9, 2025
Investor Presentation (December 2025)22 slides · Dec 9, 2025
Investor Presentation (November 2025)24 slides · Nov 3, 2025
Investor Presentation (October 2025)26 slides · Oct 13, 2025
Merger or Acquisition (May 2025)16 slides · May 15, 2025