  1. Slide 1: Silver Sand PFS Presentation

    JUNE 2024 Silver Sand PFS Presentation TSX: NUAG | NYSE American: NEWP

  2. Slide 2: Cautionary Note

    Cautionary Note CAUTIONARY NOTE REGARDING RESULTS OF PRELIMINARY ECONOMIC ASSESSMENT The results of the PEA prepared in accordance with NI 43-101 titled “Technical Report – Silver Sand Deposit Preliminary Economic Assessment” dated February 16, 2023 and with an effective date of November 30, 2022 an

  3. Slide 3: Silver Sand: High Grade, Near Surface Deposit

    Silver Sand: High Grade, Near Surface Deposit NI 43-101 Mineral Resources Estimate NI 43-101 Mineral Reserve Estimate Tonnes Tonnes Class Ag (g/t) Ag (Moz) Class Ag (g/t) Ag (Moz) (Mt) (Mt) Measured 14.9 131 62.6 Proven 15.1 121 58.8 Indicated 39.4 110 139.2 Probable 36.9 98 116.6 Measured Proven +

  4. Slide 4: PFS Contributors

    PFS Contributors • Mineral resource: AMC Mining Consultants (Canada) Ltd. • Geotechnical and Hydrogeological: Itasca Chile and HydroTechnica Ltd • Mining and infrastructure: AMC Mining Consultants (Canada) Ltd. • Metallurgy and processing: Halyard Inc. • Tailings, water and waste management: NewFiel

  5. Slide 5: PFS Highlights

    PFS Highlights Items Unit Value • Post-Tax NPV (5%): $740 million($24.00/oz Total Ore Mined1 Kt 52,014 Ag) Open Pit Strip Ratio t:t 3.3:1 • $638 million ($22.50/oz Ag) Annual Processing Rate Kt 4,000 • Post-Tax IRR: 37% ($24.00/oz Ag) LOM Silver Head Grade g/t 105 • 33% ($22.50/oz Ag) Silver Recover

  6. Slide 6: PFS Capital Cost Estimate

    PFS Capital Cost Estimate Description Cost ($M) Project Advantages • Contract mining: eliminates procurement of mining Mine pre-production fleet and sustaining capital for fleet replacement 76 and development costs • Connection to the electrical grid: low-cost power Processing plant 207 • Access via

  7. Slide 7: PFS Project Economics

    PFS Project Economics Items Unit Value Annual Processing Rate Kt 4,000 LOM Silver Head Grade g/t 105 Silver Recover % 90% Silver Price $/oz 24.00 Initial Capital Costs $M 358 LOM Total Gross Revenue $B 3.8 Mining cost $/t milled 9.3 Processing cost (including tailings) $/t milled 13.7 General and Ad

  8. Slide 8: PFS Economic Sensitivities

    PFS Economic Sensitivities Silver Price Sensitivity Silver Price (US$/Troy Oz.) $18.00 $21.00 $24.00 $27.00 $30.00 Results (post-tax NPV (5%) / IRR) 329 / 22% 535 / 30% 740 / 37% 936 / 43% 1,124 / 48% Cost Sensitivity (post-tax NPV (5%) / IRR) 100% Sensitivity Items -20% -10% (Base +10% +20% Case) M

  9. Slide 9: Next Steps for Silver Sand

    Next Steps for Silver Sand 1. Work to finalize Environmental Impact Assessment Study submission, requires: a) Surface rights for project area (land lease agreements) b) Resettlement and compensation plan c) Implementation of measures to safeguard cultural and historical heritage 2. Engage with Corpo

  10. Slide 10: Silver Sand – Precious Metals Comparison

    Silver Sand – Precious Metals Comparison Silver Projects Silver Sand Cordero Corani Diablillos Terronera Company New Pacific Discovery Silver Bear Creek AbraSilver Endeavour Silver Study 2024 PFS 2024 FS 2019 FS 2024 PFS 2021 FS Mining Method Open Pit Open Pit Open Pit Open Pit Underground Processin

  11. Slide 11: World-Class Silver and Gold Deposits in Bolivia

    11 World-Class Silver and Gold Deposits in Bolivia TSX: NUAG | NYSE American: NEWP HEAD OFFICE Suite 1750 – 1066 West Hastings Street Vancouver, BC | V6E 3X1 INVESTOR RELATIONS Tel: (604) 633-1368 U.S. & Canada toll-free: 1-877-631-0593 newpacificmetals.com Email: invest@newpacificmetals.com