Aeon Metals Ltd

Aeon Metals — Investor Presentation (February 2019)

19 slides from Aeon Metals's investor presentation, February 2019

  1. Slide 1: Walford Creek: Australia's Largest Copper-Cobalt Development Project

    WALFORD CREEK: AUSTRALIA’S LARGEST COPPER-COBALT DEVELOPMENT PROJECT February 2019

  2. Slide 2: Important Information

    IMPORTANT INFORMATION This document has been prepared by Aeon Metals Limited (Aeon) for the purpose of providing a comprehensive company and technical overview to interested analysts and investors. This document is not a prospectus and should not be considered an offer or an invitation to acquire sh

  3. Slide 3: Board & Management Team and Capital Structure

    BOARD & MANAGEMENT TEAM AND CAPITAL STRUCTURE 587M 20 AML.ASX over three years $0.50 Millions SHARES A$15.5M 18 $0.45 OUTSTANDING 16 $0.40 A$0.295 A$173M A$3.7M 2 LIMITED Trading Volume SHARE PRICE 1 MARKET CAP1 CASH RECOURSE 14 $0.35 85M3 VENDOR DEBT4 12 $0.30 VENDOR WARRANTS 10 $0.25 8 $0.20 6 $0.

  4. Slide 4: A World-Class Copper-Cobalt Project

    A WORLD-CLASS COPPER-COBALT PROJECT 100% AML owned Walford Creek Project The highest grade significant cobalt deposit in Australia Material upside along +20km strike HISTORICAL DRILLING ~88,420m ▪ 1989-1996: WMC 93 holes (DD/RC) = 16,100m ▪ 2004-2006: Copper Strike 30 holes (RC) = 3,500m ▪ 2010-2012

  5. Slide 5: Geological Code Unlocked

    GEOLOGICAL CODE UNLOCKED Mineralisation is both structurally and lithologically controlled – Fish River Fault (FRF) and Pyrite Units (PY1 and PY3). PYI from ~25m. PY3 from ~140m PY1 Sedimentary exhalative (SEDEX) deposit - Massive sulphides Pyrite lenses containing Pb-Zn-Ag. Secondary event: Cu-Co h

  6. Slide 6: 100% Owned Tenement with +20km Strike

    100% OWNED TENEMENT WITH +20KM STRIKE AEON METALS | ASX:AML 6

  7. Slide 7: Current Resources (Feb 2019) - Copper Lode

    CURRENT RESOURCES (Feb 2019) Vardy & Marley Copper Lode Resource Estimate Category Mt Cu % Pb % Zn % Ag g/t Co % Py % CuEq % Measured 2.9 1.19 0.93 0.94 26 0.15 42 2.24 Indicated 10.6 1.12 0.89 0.76 28 0.13 37 2.05 Inferred 4.1 1.16 0.78 0.57 29 0.13 36 2.01 Total 17.6 1.14 0.87 0.74 28 0.13 38 2.07

  8. Slide 8: Current Resources (Feb 2019) - Cobalt Peripheral

    CURRENT RESOURCES (Feb 2019) Vardy & Marley Cobalt Peripheral Resource Estimate Category Mt Cu % Pb % Zn % Ag g/t Co % Py % CuEq % Measured 2.4 0.14 0.81 1.34 20 0.11 46 1.12 Indicated 11.0 0.17 0.80 1.00 21 0.10 37 1.03 Inferred 6.4 0.15 0.92 0.83 24 0.11 36 1.02 Total 19.8 0.16 0.84 0.99 22 0.10 3

  9. Slide 9: Current Resources (Feb 2019) - Vardy, Marley and Amy

    CURRENT RESOURCES (Feb 2019) Vardy, Marley, and Amy Copper Lode Resource Estimate3 Category Mt Cu % Pb % Zn % Ag g/t Co % Py % CuEq % Measured 2.9 1.19 0.93 0.94 26 0.15 42 2.25 Indicated 10.6 1.12 0.89 0.76 28 0.13 37 2.05 Inferred 5.9 1.26 0.77 0.55 30 0.13 40 2.15 Total 19.4 1.17 0.86 0.72 28 0.1

  10. Slide 10: Aeon Metals | ASX:AML

    AEON METALS | ASX:AML 10

  11. Slide 11: 2018 Drill Program

    2018 Drilling - Significant Intercepts Hole No. Intersect Cu Co Ag From Location 2018 DRILL PROGRAM m % % g/t m WFDD272 14 1.33 0.19 35 186 Marley WFRC274 13 1.03 0.08 30 168 Vardy WFPD280 33 1.60 0.08 28 145 Vardy incl 17 2.72 0.10 33 161 2018 Drill Program commenced in April and has been a huge WF

  12. Slide 12: Metallurgical Testwork in Progress

    METALLURGICAL TESTWORK IN PROGRESS Refining metallurgical process parameters set out in the 18 April 2017 Cobalt Roasting Scoping Study: • Concentrator – Cu, Pb, Zn conc • Roaster – Co & Ag product, Sulphuric Acid Metallurgical teswork program designed by engineering consultant Wood plc 1.6t materia

  13. Slide 13: Indicative Project Parameters

    INDICATIVE PROJECT PARAMETERS Feasibility items (Mining, Metallurgy, Environmental, Infrastructure/Logistics) in progress utilising first class, respected consultants. Indicative Project Parameters based on Roasting Scoping Study1 utilising 1.25mtpa Run-of-Mine Ore and subject to future modular expa

  14. Slide 14: Indicative Targets

    INDICATIVE TARGETS 1 Infill and expansion (along strike) drilling – COMPLETED 31 OCTOBER 2018 Resource Upgrade – COMPLETED 25 FEBRUARY 2019 Metallurgical Flowsheet – Q1/Q2 2019 Feasibility Study – Q2/Q3 2019 Resource/Reserve/Exploration Drill Campaign – Q2->Q4 2019 Mining Lease + Environmental Autho

  15. Slide 15: Investment Summary

    INVESTMENT SUMMARY Advanced copper and cobalt project: • Leading Australian copper development. • The highest grade significant cobalt deposit in Australia Leveraged to strong growth in cobalt and copper prices Clear and consistent exploration model 36,032m drill program completed • Resource upgrade

  16. Slide 16: Aeon Metals Mount Isa Office

    Aeon Metals Mount Isa Office AEON METALS | ASX:AML 16

  17. Slide 17: Appendices

    APPENDICES AEON METALS | ASX:AML 17

  18. Slide 18: Appendix 1: Geological Model Description

    APPENDIX 1: GEOLOGICAL MODEL DESCRIPTION A. Shallow holes from 50m to 80m intercept both possible supergene mineralisation together with strong copper and cobalt mineralisation associated with the PY1 in close proximity to the FRF. B. Drilled behind the shallow holes. These holes from 70m to 110m ca

  19. Slide 19: Appendix 2: Historical Significant Intercepts

    APPENDIX 2: HISTORICAL SIGNIFICANT INTERCEPTS 2010-2012 Drilling - 10 Sig Holes 2016 Drilling - 15 Sig Holes 2017 Drilling - 15 Sig Holes Hole No. Intersect Cu Co Ag From Location Hole No. Intersect Cu Co Ag From Location Hole No. Intersect Cu Co Ag From Location m % % g/t m m % % g/t m m % % g/t m

Aeon Metals — Investor Presentation (February 2019) on 6ix