Theta Gold Mines Ltd. · ASX:TGM

Theta Gold Mines — Nordic Funds and Mines Conference 2026

36 slides from Theta Gold Mines's conference presentation, Oct 13, 2026

  1. Slide 1: ASX Announcement: Nordic Funds and Mines Conference Investor Presentation

    13 October 2026 For personal use only ASX ANNOUNCEMENT AND MEDIA RELEASE (ASX: TGM) Nordic Funds and Mines Conference – Investor Presentation Theta Gold Mines Limited (ASX: TGM) (Theta or the Company) is pleased to advise that Chairman, Bill Guy will be participating in the Nordic Funds and Mines Co

  2. Slide 2: South Africa's Next Sustainable Gold Producer

    rsonal use only THETA GOLD MINES LIMITED SOUTH AFRICA’S NEXT SUSTAINABLE GOLD PRODUCER Investor Presentation Nordic Funds and Mines Conference October 2026

  3. Slide 3: Disclaimer

    INV ESTOR PRESE NTATIO N | AS X: TGM Disclaimer FORWARD LOOKING AND CAUTIONARY STATEMENTS DISCLAIMER AND COMPETENT PERSONS STATEMENT This pre se ntation may re fe r to the inten tio n of Theta Go ld Mine s re gard ing estimates or future events which could be conside red DISCLAIMER forwar d loo kin

  4. Slide 4: Table of Contents

    Table of Contents Ore stockpile for plant commissioning rsonal use only 1 TGME Gold Project Summary 2 TGME Gold Plant Construction 3 Transvaal Gold Mining Estates 4 Appendix

  5. Slide 5: Key Investment Highlights

    TGME GOLD PROJECT SUMMARY THETA GOLD MINES | ASX: TGM Key Investment Highlights High-grade gold project with a 13.1-year mine life, including 8.8 years of reserves and 6.1Moz of resources rsonal use only Construction underway with only ~USD 39m 1 spent today – commissioning targeted for Q4’2026 / fi

  6. Slide 6: Theta Gold at a Glance

    TGME GOLD PROJECT SUMMARY THETA GOLD MINES | ASX: TGM Theta Gold at a Glance High-grade gold mine(s) located in South Africa’s most prolific gold region supported by existing infrastructure, a skilled workforce, and strong utility access Overview of Theta Gold Key statistics (100% basis) Mine locati

  7. Slide 7: Robust economics and solid asset backing for the TGME Project

    TGME GOLD PROJECT SUMMARY THETA GOLD MINES | ASX: TGM Robust economics and solid asset backing for the TGME Project NPV10 post-tax and annual EBITDA sensitivity to gold price assumptions (USD/oz) NPV10 Post-tax sensitivity (USDm)1,2 Annual EBITDA Sensitivity (USDm)1,2 rsonal use only 1,051 232 911 2

  8. Slide 8: Mine Plan Overview

    TGME GOLD PROJECT SUMMARY THETA GOLD MINES | ASX: TGM Mine Plan Overview Ramp up to peak production of ~115kozpa initially utilizing ready-to-access rock dumps and tailings, followed by ore feed from the Beta and Rietfontein mines Ore mined by source1,2 Commentary rsonal use only • Mining operations

  9. Slide 9: Table of Contents

    Table of Contents TGME Gold Plant Construction in Progress rsonal use only 1 TGME Gold Project Summary 2 TGME Gold Plant Construction 3 Transvaal Gold Mining Estates 4 Appendix

  10. Slide 10: Key Contracts Overview

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Key Contracts Overview Key contracts already locked in, de-risking the Project Counterparty Description rsonal use only Power Supply • Electrical Supply Agreement to TGME • The supply, construction, commissioning and related works of the bulk

  11. Slide 11: Schedule Overview – Master Project Schedule S-Curve

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Schedule Overview – Master Project Schedule S-Curve Commentary • TGME GOLD Plant construction is 72% complete to 30 September 2026 rsonal use only • First Gold Pour Q1 2027 Master Project Schedule S-Curve 10

  12. Slide 12: TGME – Gold Plant Construction Summary

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM TGME – Gold Plant Construction Summary rsonal use only 11

  13. Slide 13: Key Crushing and Screening Plant Contract Secured

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Supplier Selection - Key Crushing and Screening Plant Contract Secured Locking in this key long-lead item further reduces execution risk and keeps the Project on track for commissioning in Q4’2026 Inspections with NMS and process engineers ahe

  14. Slide 14: Earthworks Completed in Preparation for the Processing Plant

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Earthworks Completed in Preparation for the Processing Plant USD 39m1 already spent to date on earthworks, civils, and processing plant equipment TGME Gold Plant Milling section under construction Carbon in leach tank under construction rsonal

  15. Slide 15: Earthworks and Civils (PICM) QAQC Report Pictures

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Earthworks and Civils (PICM) QAQC Report Pictures rsonal use only Excavation and Blinding release inspection Pre-concrete shutter inspection of pump Visual post-concrete inspection of the MCC 1 – pour and floating. of Thickener 600 bund wall.

  16. Slide 16: Structural, Mechanical, Piping, and Platework (SMPP)

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Structural, Mechanical, Piping, and Platework (SMPP) Superstructure for Elution Circuit and Gold Room rsonal use only 15

  17. Slide 17: TGME Plant Build Progress

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM TGME Plant Build Progress Ball Mills Secured, Construction Accelerates rsonal use only 16

  18. Slide 18: Engineering Monitoring SMPP

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Engineering Monitoring SMPP Elution Building CIL & Tailings Thickeners rsonal use only Mill Circuit CIL Tanks 17

  19. Slide 19: Plant view from Stationary Crane

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Plant view from Stationary Crane rsonal use only Gold Room Roof – under construction Thickener Tanks being constructed 18

  20. Slide 20: Solar Car Park and New Management Offices

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Solar Car Park and New Management Offices rsonal use only Management Offices, Solar Car Park, Goods shed Solar Car Park and Battery System 19

  21. Slide 21: Gold Room Equipment for pouring and casting gold

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Gold Room Equipment for pouring and casting gold Commentary Gold Room is close to completion: rsonal use only • TGM has purchased a Keegor Industrial Furnace to be used for smelting and refining gold. • Gold Casting equipment is already on sit

  22. Slide 22: JEDD – Tailings Facility System Rehabilitation

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM JEDD –Tailings Facility System (TFS) Rehabilitation Tailings Facility System Engineering Testing - Density rsonal use only 21

  23. Slide 23: Underground Mining Equipment

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Underground Mining Equipment • New Siton underground drill rig delivered to site rsonal use only • Purpose-built for mechanised underground drilling and mine development • Mobile, self-contained unit with an articulated hydraulic drilling boom

  24. Slide 24: Pathway to Production

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Pathway to Production Commissioning targeted for Q4’2026, with first gold in Q1’2027 rsonal use only Note: First gold produced timing will be subject to obtaining all necessary regulatory permitting approvals 23

  25. Slide 25: Development Capex Overview

    TGME GOLD PLANT CONSTRUCTION THETA GOLD MINES | ASX: TGM Development Capex Overview Minimal development capex after 2026 as production is expected to commence in Q1’2027 Mining and infrastructure capex schedule over the life of bond (USDm)1 Overview of capex costs over the life of the bond rsonal us

  26. Slide 26: Table of Contents

    Table of Contents rsonal use only 1 TGME Gold Project Summary 2 TGME Gold Plant Construction 3 Transvaal Gold Mining Estates 4 Appendix

  27. Slide 27: Growth Potential

    TRA NSV AAL GOL D MINING E STA TES THETA GOLD MINES | ASX: TGM Growth Potential Shovel-ready mines with key approvals secured and clear pathway to production Asset overview TGME Gold Projects Area rsonal use only • TGME is situated in South Africa’s prolific Eastern Transvaal Goldfields (Mpumalanga)

  28. Slide 28: ESG: Restoring the Local Catchment and River System

    TRA NSV AAL GOL D MINING E STA TES THETA GOLD MINES | ASX: TGM ESG: Restoring the Local Catchment and River System • The critical river system sustains over 20,000 farm workers and serves as the lifeline for Kruger National Park – rsonal use only Critical river especially during dry winter months sy

  29. Slide 29: ESG: Direct Employment and Workplace Health & Safety

    TRA NSV AAL GOL D MINING E STA TES THETA GOLD MINES | ASX: TGM ESG: Direct Employment and Workplace Health & Safety Direct employment over LoM (FTEs) rsonal use only Employee wellness TB Other HSEs 513 517 515 509 505 493 535 478 program program program 370 349 306 200 181 50 1 2 3 4 5 6 7 8 9 10 11

  30. Slide 30: Table of Contents

    Table of Contents rsonal use only 1 TGME Gold Project Summary 2 TGME Gold Plant Construction 3 Transvaal Gold Mining Estates 4 Appendix

  31. Slide 31: Total Mineral Resources of the 4 Mines included in the DFS

    APP ENDIX THETA GOLD MINES | ASX: TGM Total Mineral Resources of the 4 Mines included in the DFS - Combined as of 1 February 2021 Stope Reef Stope Mineral Resource Reef Grade Grade Reef Width Stope width Content Tonnes Au Content Mine Reef Tonnes rsonal use only Classification g/t g/t cm cm cm.g/t M

  32. Slide 32: Ore Reserve Estimate for TGM Mines

    APP ENDIX THETA GOLD MINES | ASX: TGM Table: Ore Reserve Estimate for TGM Mines (Ore Reserve Plan) rsonal use only Notes: Notes: •An Ore Reserve cut-off of 170 cm.g/t has been applied for the Beta Mine. •An Ore Reserve cut-off of 160 cm.g/t has been applied for the Rietfontein Mine. •An Ore Reserve

  33. Slide 33: Mineral Resource Statement – Underground Only

    APP ENDIX THETA GOLD MINES | ASX: TGM Mineral Resource Statement – Underground Only (~4.5Moz) Reef Stope Reef Stope Mineral Resource Reef Grade Stope Grade Content Au Content Mine Reef Width width Tonnes Tonnes Classification g/t g/t cm cm cm.g/t Mt Mt kg koz Measured Frankfort Bevetts 7.13 5.37 73

  34. Slide 34: Combined Mineral Resources Statement

    APP ENDIX THETA GOLD MINES | ASX: TGM Combined Mineral Resources Statement (~6.1Moz) Combined Mineral Resource Resource Classification Type of Operation Tonnage Gold Grade Gold Content rsonal use only Mt g/t Kg koz Underground 0.091 5.37 489 15.7 Measured Open pit Tailings Total Measured 0.091 5.37

  35. Slide 35: Mineral Resource Statement – Open Pit Only

    APP ENDIX THETA GOLD MINES | ASX: TGM Mineral Resource Statement – Open Pit Only (~1.4Moz) Mineral Resource Reef Grade Reef Width Content Reef Tonnes Au Content Open Pit Mine Reef Classification g/t cm cm.g/t Mt kg koz Hermansburg Eluvial 1.79 0 0 0.505 905 29.1 DG1 Eluvial 2.24 0 0 0.640 1 432 46.0

  36. Slide 36: Contact Us

    THETA GOLD MINES LIMITED Contact Us: rsonal use only Bill Guy (Executive Chairman) Email: billg@thetagoldmines.com Brent Hofman (Company Secretary) Email: brenth@thetagoldmines.com Registered and Principal Office Tel: +61 280 467 626 Email: info@thetagoldmines.com Suite 68, Level 35, International T

Theta Gold Mines — Nordic Funds and Mines Conference 2026 on 6ix