Torex Gold Resources Inc. · TSX:TXG

Torex Gold Resources — Investor Presentation (June 2022)

58 slides from Torex Gold Resources's investor presentation, June 2022

  1. Slide 1: Corporate Presentation

    TSX | TXG CORPORATE PRESENTATION June 2022 All amounts expressed in U.S. dollars unless otherwise stated

  2. Slide 2: Safe Harbor Statement

    SAFE HARBOR STATEMENT The Company has presented certain future non-GAAP financial measures (“Non-GAAP Measures”) in this presentation within the meaning of National Instrument 52-112 – Non-GAAP and Other Financial Measures. Total cash costs per ounce of gold or gold equivalent (AuEq) sold (“TCC”), t

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS Future underpinned by solid fundamentals1 Consistent track record of achieving guidance Competitive cost profile providing ability to and delivering free cash flow generate solid cash flow through the cycle Strong balance sheet and robust cash flow High-quality management team

  4. Slide 4: Strategic Pillars

    STRATEGIC PILLARS Executing on plan expected to significantly enhance shareholder returns OPTIMIZE & ADVANCE & GROW RESERVES & EXTEND ELG DE-RISK MEDIA LUNA RESOURCES Build on culture as key strategic Commence formal construction of $39M exploration and drilling differentiator Media Luna Project bud

  5. Slide 5: El Limón Guajes ("ELG") – A Foundational Asset

    EL LIMÓN GUAJES (“ELG”) – A FOUNDATIONAL ASSET Future supported by strong cash flow and robust margins from ELG1 Off to a solid start to 2022 with 112,446 ounces in Q1 AISC2 margin of 44% achieved during first quarter COVID Interruption Generated $111M of adjusted EBITDA2 in Q1 2022 Seasonal payment

  6. Slide 6: On Track to Achieve Full Year Guidance

    ON TRACK TO ACHIEVE FULL YEAR GUIDANCE1 Quarterly output expected to trend higher and costs lower through remainder of 2022 In millions of U.S. dollars, unless otherwise noted 2022 Guidance Year to Date (Q1) Gold Production oz 430,000 to 470,000 112,446 Total Cash Costs 2 $/oz 695 to 735 748 All-in

  7. Slide 7: Multi-Year Outlook

    MULTI-YEAR OUTLOOK1 Forward production ranges now incorporate gold equivalent output from Media Luna Projected improvement in 2023 reflects ongoing optimization within the ELG Mine Complex Increase in 2024 reflects first gold equivalent production from Media Luna Gold equivalent production expected

  8. Slide 8: ESG Excellence as a Foundation

    ESG EXCELLENCE AS A FOUNDATION Sustained performance & ongoing improvement on ESG disclosure a key focus Managing the latest wave of COVID-19 ESG Ratings 99.7% of employees and 89% of contractors fully MSCI: ‘A’ rating from ‘BBB’ vaccinated against COVID-19 Refinitiv: ‘B-’ rating from ‘C+’ Boosters

  9. Slide 9: ESG Excellence as a Foundation

    ESG EXCELLENCE AS A FOUNDATION Delivering value to shareholders while making a positive difference in society Productive relationships with employees Strong governance & diversity focus 99% workforce from Mexico; 61% from Guerrero Women make up 43% of Executive Team and 44% State of Board of Directo

  10. Slide 10: The Foundation for Growth Has Been Cast

    THE FOUNDATION FOR GROWTH HAS BEEN CAST1,2 Development of Media Luna to have a material impact on Morelos Complex Life of mine more than triples to 11.75 years versus ELG standalone case of 3.5 years Annual AuEq sold3 of 374 koz at a mine-site AISC4 of $954/oz AuEq 450 koz AuEq at a mine-site AISC o

  11. Slide 11: Media Luna Mine Design

    MEDIA LUNA MINE DESIGN Mineral Reserve1 of 23 Mt to be mined from 6 discrete mining blocks ML designed for longhole open stope mining Looking Southeast Separate mining blocks enable production capacity MLU 1 Dedicated infrastructure for each block MLU 2 South Portals MLL 3 MLL 1 MLL 2 Guajes Tunnel

  12. Slide 12: Leveraging and Building on Existing Processing Plant

    LEVERAGING AND BUILDING ON EXISTING PROCESSING PLANT1 1) Please refer to Safe Harbor Statement on slide 2. 12

  13. Slide 13: Media Luna Project – Tunnel Development

    MEDIA LUNA PROJECT – TUNNEL DEVELOPMENT1,2 Advancing from both sides of Balsas River expected to mitigate schedule risk Guajes Tunnel had advanced ~1,910 m as of May 31st Year-to-date advance rate of 5.6 m/d versus budgeted rate of 6 to 6.5 m/d Record average advance rate of 6.4 m/d in May South Por

  14. Slide 14: Consistent Output Maintained Through 2027

    CONSISTENT OUTPUT MAINTAINED THROUGH 20271 Media Luna extends production profile and provides meaningful exposure to Cu Annual AuEq sold2,3 of 450 koz through 2027 when process plant is at full capacity Similar run rate as last three years Annual Cu sales of 45 Mlbs post 2024 when the ML Project bec

  15. Slide 15: Attractive Cost Profile Maintained

    ATTRACTIVE COST PROFILE MAINTAINED1,2,3 Robust margins forecast over life of mine including a mine-site AISC margin4 of 41% Average TCC4 of $809/oz AuEq implying a TCC margin4 of 50% at base case metal prices Average mine-site AISC4 of $954/oz AuEq implying mine-site AISC margin4 of 41% Potential to

  16. Slide 16: Non-Sustaining Capital Expenditures

    NON-SUSTAINING CAPITAL EXPENDITURES1 Upfront cost to develop Media Luna Project estimated at $848M Metrics as of April 1, 2022 Total ($M) Excludes $124M of estimated project costs Non-Sustaining2,3 - Media Luna Project incurred prior to April 1, 2022 Directs Guajes Portal & Tunnel $75.8 South Portal

  17. Slide 17: Significant Upside Associated with Stronger Metal Prices

    SIGNIFICANT UPSIDE ASSOCIATED WITH STRONGER METAL PRICES1,2 Implied IRR of Media Luna Project increases to 24.9% at spot prices 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. 3) For more information on operational and fin

  18. Slide 18: Leveraging Excess Mill Capacity Post 2027

    LEVERAGING EXCESS MILL CAPACITY POST 20271 Exploration already targeting to the fill the mill while extending overall life of mine Mill capacity = 10,600 t/d Media Luna = 7,500 tpd Initiatives underway to address excess capacity post 2027 Exploration/drilling a key strategic pillar Historically unde

  19. Slide 19: Significant Resource Potential

    SIGNIFICANT RESOURCE POTENTIAL1 75% of the broader property remains largely unexplored Drilling/exploration budget of $39M in 2022 Tecate Esperanza $19M within ML Cluster (~64,000 m) Querenque $6M on infill and step-out drilling at ELG Underground (~28,000 m) $9M on near-mine drilling (~28,500 m) an

  20. Slide 20: ELG Underground – A Significant Value Driver

    ELG UNDERGROUND – A SIGNIFICANT VALUE DRIVER1 Continues to be a key driver of Reserve growth Mined underground production2 since 2019 has averaged 97 koz Au at a grade of ~7.4 g/t Au Record annual mining rate of ~1,260 tpd in 2021 Underground gold Reserves increased 20% in 2021 Current Reserves plus

  21. Slide 21: Media Luna Cluster Remains Under-Explored

    MEDIA LUNA CLUSTER REMAINS UNDER-EXPLORED1 Significant resource potential exists within the broader Media Luna area Significant resource potential exists to expand Resources and Reserves around Media Luna EPO Current Mineral Resource covers about 1/3rd of North ML02 associated magnetic anomalies Inf

  22. Slide 22: Balance Sheet & Liquidity

    BALANCE SHEET & LIQUIDITY1 Financial health of business continues to strengthen Available liquidity of $387M at end of Q1 2022 Strong balance sheet with no debt Robust forecast cash flows from ELG Mining Complex through Media Luna build Target $250M to $300M of debt to support strategic priorities:

  23. Slide 23: Enhanced Liquidity Expected via Debt Financing

    ENHANCED LIQUIDITY EXPECTED VIA DEBT FINANCING1 Targeting $250M to $300M to support balance sheet during Media Luna build Annual cash flow of $190M forecast through 2024 before ML expenditures at $1,600/oz gold2,3,4 Analysis assumes $20M of corporate G&A and $35M of exploration/drilling annually Lev

  24. Slide 24: Executing on Plan Expected to Deliver Re-Rating

    EXECUTING ON PLAN EXPECTED TO DELIVER RE-RATING Several key deliverables anticipated in the coming months Optimize & Extend Advance & De-Risk Grow Reserves & ELG Media Luna Resources Deliver consistent production Advance Guajes Tunnel as per $39M drill budget in 2022 and cash flow schedule Fill the

  25. Slide 25: Appendix: March 2022 Technical Report

    Appendix March 2022 Technical Report All amounts expressed in U.S. dollars unless otherwise stated

  26. Slide 26: Summary of March 2022 Technical Report

    SUMMARY OF MARCH 2022 TECHNICAL REPORT1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. 3) Gold equivalent sold assumes long-term gold price of $1,600/oz ($1,700/oz in 2022), silver price of $21/oz and copper price of $3

  27. Slide 27: Summary of March 2022 Technical Report

    SUMMARY OF MARCH 2022 TECHNICAL REPORT1,2 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. 3) Gold equivalent sold assumes long-term gold price of $1,600/oz ($1,700/oz in 2022), silver price of $21/oz and copper price of $3

  28. Slide 28: Materials Handling System

    MATERIALS HANDLING SYSTEM Separate ore passes and one waste pass feed the Guajes Tunnel conveyor Dedicated ore/waste passes Gravity fed grizzlies with rock-breakers Dedicated bins above Guajes Tunnel conveyor 28

  29. Slide 29: Mine Services & Logistics

    MINE SERVICES & LOGISTICS1 Building a clean, energy efficient mine with the future in mind Mobile Equipment Fleet BEV Units Hybrid Fleet - Diesel and BEV mobile equipment 14 tonne LHD 11 Less ventilation required, reduced vent infrastructure costs Top-Hammer Longhole Drill Rig 5 ITH Drill with reame

  30. Slide 30: Credible Ramp-Up Period Assumed for Media Luna

    CREDIBLE RAMP-UP PERIOD ASSUMED FOR MEDIA LUNA1 Media Luna expected to take 3 years to reach design rate of 7,500 tpd Assuming a 3-year ramp-up from initial production ore (3.5 years from first development ore) Industry ramp-up periods tend to be underestimated, which can have negative implications

  31. Slide 31: Life of Mine Recoveries and Payable Factors

    LIFE OF MINE RECOVERIES AND PAYABLE FACTORS1,2 Ore from Media Luna will result in significantly higher copper and silver production 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. 31

  32. Slide 32: Media Luna Project Capital Cost

    MEDIA LUNA PROJECT CAPITAL COST1 Initial capital cost planned expenditure by quarter Total projected spend of $848M with peak quarterly spend through 2023 Commercial production expected to be declared on January 1, 2025 $85M of underground mine development during pre-commercial mining period (Q4 202

  33. Slide 33: Sustaining Capital Expenditures

    SUSTAINING CAPITAL EXPENDITURES1 Reflects costs of running and sustaining a large-scale underground operation Metrics as of April 1, 2022 Total Total Total ($M) ($/t ore) ($/oz AuEq) Total ore processed (kt) 39,778 Total payable gold equivalent sold (koz AuEq) 4,392 2,3 Sustaining ELG Open Pit - Cap

  34. Slide 34: Life of Mine Unit Costs

    LIFE OF MINE UNIT COSTS1,2 Opportunities to improve overall cost structure being investigated Potential to reduce ELG UG mining costs: Employing longhole stoping Opportunities to reduce contract mining costs Higher processing costs post 2025 reflect additional processes to recover metal at Media Lun

  35. Slide 35: Attractive Cost Profile

    ATTRACTIVE COST PROFILE1 Reconciliation of gold equivalent costs and by-product costs Metrics as of April 1, 2022 LOM AuEq Au ($M) ($/oz) ($/oz) Metal Sold 2,3 Total payable gold equivalent sold (AuEq) 4,392 Total payable gold sold (Au) 3,294 Operating Costs Operating expenses $3,122 $711 $947 Treat

  36. Slide 36: Well-Positioned on the Industry Cost Curve

    WELL-POSITIONED ON THE INDUSTRY COST CURVE1,2 Average mine-site AISC3,4 screens well against peers5 on a co-product basis Mine-site AISC = $954/oz AuEq 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022. 3) For more informatio

  37. Slide 37: Sensitivity Analysis

    SENSITIVITY ANALYSIS1,2 After-tax NPV (5%) of Morelos Complex and Media Luna Project 1) Please refer to Safe Harbor Statement on slide 2. 2) As per Technical Report for the Morelos Complex dated March 31, 2022 (base case economics assume long-term metal prices of $1,600/oz gold ($1,700/oz in 2022),

  38. Slide 38: Media Luna Project Schedule

    MEDIA LUNA PROJECT SCHEDULE1 1) Please refer to Safe Harbor Statement on slide 2. 38

  39. Slide 39: Appendix: Mineral Reserves & Resources

    Appendix Mineral Reserves & Resources All amounts expressed in U.S. dollars unless otherwise stated

  40. Slide 40: Mineral Reserves – Morelos Complex

    MINERAL RESERVES1 – MORELOS COMPLEX Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (g/t) (g/t) (%) (koz) (koz) (Mlb) (g/t) (koz) El Limón Guajes Open Pit (ELG OP) Proven 4,900 3.95 4.6 0.14 623 719 15 4.00 630 Probable 5,471 2.35 4.5 0.12 414 784 15 2.39 421 Proven & Probable 10,371 3.11 4.5 0.13 1,037 1,5

  41. Slide 41: Notes to Mineral Reserves – Morelos Complex

    NOTES TO MINERAL RESERVES – MORELOS COMPLEX Notes to accompany Mineral Reserve Table Notes to accompany the ELG Underground Mineral Reserves 1. Mineral Reserves were developed in accordance with CIM (2014) guidelines. 15. Mineral Reserves are founded on Measured and Indicated Mineral Resources, with

  42. Slide 42: Mineral Resources – Morelos Complex

    MINERAL RESOURCES1 – MORELOS COMPLEX Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (g/t) (g/t) (%) (koz) (koz) (Mlb) (g/t) (koz) El Limón Guajes Open Pit (ELG OP) Measured 5,727 3.89 5.0 0.13 716 919 17 3.93 724 Indicated 11,027 2.37 4.7 0.12 842 1,660 28 2.41 856 Measured & Indicated 16,754 2.89 4.8 0.12

  43. Slide 43: Notes to Mineral Resources – Morelos Complex

    NOTES TO MINERAL RESOURCES – MORELOS COMPLEX Notes to accompany the Summary Mineral Resource Table Notes to accompany ELG Underground Mineral Resources 1. CIM (2014) definitions were followed for Mineral Resources. 14. Mineral Resources are reported above a cut-off grade of 2.6 g/t Au. 2. Mineral Re

  44. Slide 44: Appendix: Corporate Information & ESG

    Appendix Corporate Information & ESG All amounts expressed in U.S. dollars unless otherwise stated

  45. Slide 45: Safety and Operational Excellence Intertwined

    SAFETY AND OPERATIONAL EXCELLENCE INTERTWINED Culture focused on safety evident by ongoing performance LEADERSHIP: Getting the right people in the right roles at the right levels to drive business excellence SYSTEMS OF WORK: SYSTEMS OF WORK: Incident reporting & Business Process investigations Frame

  46. Slide 46: We Are Focused on Enhancing Our ESG Disclosure

    WE ARE FOCUSED ON ENHANCING OUR ESG DISCLOSURE Translating our actions associated with our values into real value1 ENVIRONMENT SOCIAL GOVERNANCE Zero Discharge Site (no discharge Achieved one-year LTI-free in April Seasoned Executive Team with into local watersheds) 2022; current LTIF of 0 per milli

  47. Slide 47: 2021 Responsible Gold Mining Report

    2021 RESPONSIBLE GOLD MINING REPORT Key Highlights 99% operations employees from Mexico; $67.4 million paid in salaries and benefits Industry leading safety performance Ratified two-year labour agreement with unionized employees (where annual agreements are the norm) 90% procurement spend in Mexico;

  48. Slide 48: Innovation: A Key Part of the Torex DNA

    INNOVATION: A KEY PART OF THE TOREX DNA Leveraging innovation to drive value and mitigate risk ROPECON FILTERED TAILINGS SART PLANT Innovative 1.3 km automated conveyor “Dry-stack” filtered tailings facility Reduces consumption of our two most system which transports ore to our best-in-class in the

  49. Slide 49: Extending and Optimizing ELG a Key Strategic Priority

    EXTENDING AND OPTIMIZING ELG A KEY STRATEGIC PRIORITY1 Targeting underground reserve growth and incremental gains from the open pit Pushback of El Limón pit extends open pit production to mid-2024 from late-2023 and is expected to add ~150,000 ounces of production Accelerating near-term underground

  50. Slide 50: Cost Performance

    COST PERFORMANCE1,2 Costs tracking well against full year 2021 results Open pit and underground mining unit costs relatively inline with full year 2021 result Improvement in processing costs reflects reduced cyanide consumption given specific mineralogy associated with sulphur and iron processed Sit

  51. Slide 51: Cash Flow Generation

    CASH FLOW GENERATION1 Cash generation during Q1 impacted by seasonality of tax and royalty payments Taxes paid includes $30M related to fiscal 2021 mining tax; working capital includes $4M related to 0.5% royalty accrued during 2021 Cash generation to be weighted towards H2 given seasonality of tax,

  52. Slide 52: Cash Flow Seasonality

    CASH FLOW SEASONALITY Cash flow tends to be the weakest in H1 given timing of tax, royalty and PTU payments Final payments related to royalties, profit sharing, and taxes are subject to movements in the Mexican peso relative to the US dollar Cash flow from operations prior to changes in non-cash wor

  53. Slide 53: Key Operational Metrics

    KEY OPERATIONAL METRICS1,2 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2020 2020 2020 2021 2021 2021 2021 2022 Mining - ELG Open Pit Ore mined (kt) 666 1,407 1,689 1,359 1,131 1,406 864 1,061 Waste mined (kt) 4,435 10,097 10,399 9,882 8,593 7,476 8,972 8,958 Strip ratio (waste:ore) 6.7 7.2 6.2 7.3 7.6 5.3 10.4 8.4 Gold

  54. Slide 54: Key Financial Metrics – Consolidated

    KEY FINANCIAL METRICS – CONSOLIDATED1,2 All amounts in U.S. dollars Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2020 2020 2020 2021 2021 2021 2021 2022 Key Metrics Gold sold (oz) 63,147 133,036 133,063 129,019 111,424 118,989 109,391 108,012 Realized gold price ($/oz) $1,712 $1,884 $1,847 $1,778 $1,816 $1,786 $1,798 $1

  55. Slide 55: Corporate Information and Top Shareholders

    CORPORATE INFORMATION AND TOP SHAREHOLDERS Broadly owned by skilled institutional investors 2 Top 10 Shareholders Share Price Performance1 2.00 Institution Shares Shares TXG GDX Index (M) (%) 1.75 Blackrock 11.9 13.9% (Indexed to January 1, 2020) Price Performance - USD VanEck - ETFs 8.1 9.4% 1.50 R

  56. Slide 56: Board of Directors

    BOARD OF DIRECTORS Ongoing Board refresh to maintain strong strategic and governance experience RICK HOWES P.Eng. Chair of the Board ROSIE MOORE MSc (Geology) 40 years global technical, operational and management mining expertise; Exploration geologist whose 35+ year career includes experience in aw

  57. Slide 57: Management Team

    MANAGEMENT TEAM Proven experience navigating technical, commercial and social complexity JODY KUZENKO LLB President and Chief Executive Officer FAYSAL RODRIGUEZ S.V.P. Mexico Joined Torex in 2018 as COO; assumed CEO position in June 2020. 20+ years of mining experience in corporate & operational rol

  58. Slide 58: www.torexgold.com

    TSX | TXG www.torexgold.com Dan Rollins, CFA Vice President, Corporate Development and Investor Relations Email: dan.rollins@torexgold.com | Direct: 1-647-260-1503

Torex Gold Resources — Investor Presentation (June 2022) on 6ix