Miller Energy Resources — Investor Presentation (December 2014)
25 slides from Miller Energy Resources's investor presentation, Dec 19, 2014
Slide 1: Miller Energy Investor Presentation December 2014
Miller Investor Presentation Energy December, 2014
Slide 2: Forward Looking Statement
Forward Looking Statement: Lom Miller Energy Ine. are“ " Act of 1995. include, but are not limited to, the potential for additional operating losses; material weaknesses in internal control over financial reporting and the need to enhance systems, ‘accounting, controls and reporting performance; pot
Slide 3: Miller Energy at a glance
om Miller Energy ~11.7 MMBOE Ryder Scott Proved Reserves Oe: ~$447 million” Proved Reserves % Oi ~62% Company Operated % of Net Production 200% AK Lease and Exploratory ~620K gross North Slope - Badami Acre Position acres”) Cook Inlet — North Fork. (2) Source: Ryder Scott reserve report dated 7/31/1
Slide 4: Value Proposition — Enabling Investment In Alaska
Value Proposition — “Enabling Investment In Alaska” Substantial Hydrocarbon State-of-the-Art Resources Infrastructure Alaska D&C Funding and Balance Sheet Commodity Price Simplification/Cost of Environment Capital Efficiencies Increased Governance, Independence and Internal Checks-and-Balances / Boa
Slide 5: Working Strategy - Alaska Pure-Play
Working Strategy - “Alaska Pure-Play” CLARIFY ASSET VALUE REDUCE DISTRACTIONS = Define high-quality, under-valued assets = Improve liquidity — Upstream - Capex discipline - Midstream WI sell-downs, Reduce BS complexity / cost of capital = Educate AK-location benefits Continue to improve governance /
Slide 6: Four Distinct Fields in Alaska
Four Distinct Fields in Alaska — Predominantly Onshore with Midstream Cook Inlet, AK Redoubt West McArthur River (WMRU) North Fork Miller Energy North Slope, AK Badami (Savant)(?) ier approximately 710 BOE/D® = WI= 100%, NRI = 83.6% = P1: 2.8 MMBoe / ~24%) = P3: 4.0 MMBoe / ~ 13%) * Redoubt 3P total
Slide 7: Favorable Alaskan Drilling Support and Pricing
State Drilling Support = Through “tax credits,” the state reimburses MILL in cash for 20%-40% of its D&C costs and 25% of its carried- forward annual loss credits. + Regardless of welll success + Reimbursements applied for quarterly by MILL for D&C costs and annually for carried-forward loss = MILL
Slide 8: Total Reserves
Total Reserves Additional / Contingent Resources RU-12 Sabre rd Badami 1P, 2P & 3P per 7/31 Ryder Scott Report; excludes Badami. 1P Reserve PV-10: $447mm 500 2s Reserve PV-10 Value ($mm) Proved Developed _" PUD 3P Reserve PV- $830mm 900 198.0 407.6 Reserve PV-10 Value ($mm) mip 2p 3p Miller Energy 1
Slide 9: Capitalization
Capitalization fin $00c Pro Forma| 10/31/2014") Revolving Credit Facility Second Lien Term Loan, Rig 36 Capital Lease (#300 - L400) (11.75%) 36,0000 175,000.0 2,951.0 2,363.0 [Total Debt 216,314.0| Series C Preferred Stock Series 0 Preferred Stock 69,1540 ‘Common Equity" f 416,117. Miller Energy $25
Slide 10: Redoubt Unit Field (Osprey)
Redoubt Unit Field (Osprey) Proved, producing field with existing state of the art infrastructure, near new 2,000 HP drill rig Large four-way structure located approximately 2.5 miles Southwest of the Osprey platform Recent 3" party OOIP report shows over 150 MMBO, only produced ~3 MMBBO to date, 10
Slide 11: West McArthur River Unit
West McArthur River Unit Miller Energy Highlights = Proved, producing field with existing infrastructure = ~13.3 MMBBO recovered from WMRU to date, OOIP estimated over 45 MMBBO (excluding Sword & Sabre), 100% WI, 82.7% NRI (WMRU) = On trend with adjacent McArthur River Field (produced over 643 MMBO)
Slide 12: North Fork Unit Highlights
Om Miller Energy Highlights Proved, producing field with existing infrastructure, 15,464 acres Over 24 BCF in proved reserves, currently producing ~9.0 MMCFG/D Fixed multi-year natural gas contract @ ~$7.0/MCF 100% WI, 80.2% NRI Average Initial Production: > 3,500 MCFD Additional infield targets, mu
Slide 13: Recent North Slope, Savant Acquisition — Badami Field
Recent North Slope, Savant Acquisition — Badami Field MiMile: Energy Proved, producing field (Badami) with existing state of art infrastructure, facility rated @ 38,500 BOPD, ~50 miles of pipeline, ~18,500 acres Most easterly located active production facility near significant 3rd party exploration
Slide 14: Drilling Rigs
Drilling Rigs Miller Energy Location Status Future Plans Rig-34 Company ~750Hp, land Nikiski Stacked Being moved to L48 for sale $5 milion Owned based, ~6,000" depth Rig-35 Company ~2,000Hp, Osprey Redoubt “horse” $25 million Owned platform based, ~21,000' depth Rig-36 ‘Company ,400Hp, Nikiski Under
Slide 15: Path Forward
Path Forward Miller Energy Operational + Credibility / Commodity + Prices : leverage + Spent significant capital on four recent wells with de minimis results Focused on reserve growth > production / cash flow Oil at ~$60 Gas < $4 (and it’s winter) Currently ~4.5x levered Lower-risk well focus Increa
Slide 16: Path Forward (Cont.)
Path Forward (Cont.) pier Liqui * Downward risk to borrowing base in Jan. + Tighter / expanded Finance / Operations - Production, drilling results, oil prices communication * Capital markets uncertai + Ms * Potential delays in receipt of state cash tax * Wi sell-downs: 100% in all areas except credi
Slide 17: LT Growth Avenues
Miller Energy LT Growth Avenues Jara | Options Redoubt * Hydraulic fracturing Work North fault blocks Sword + JV/ develop on-own Sabre + JV/develop on-own Badami + Sell-down Iniskin + JV / develop on-own Susitna + JV/develop on-own AKM&A + “Bolt-ons” Midstream * Create own MLP Create a “JV AK” MLP S
Slide 18: Value Proposition
Value Proposition \Om Miller ! Energy Every $100MM value = ~$2+ / share $1,600 * Redoubt Frack * Redoubt $1,400 North Faults * Sabre $1,200 * Sword 1,100 NOL Cash AK AR * Badami/ $1,000 els Sourdough * Iniskin —_— + Susitna #800. * Midstream 2P PV10 MLP options $600 Midstream Est. A008 Liquidation V
Slide 19: Contact Information
Contact Information Miller Energy Resources, Inc. 9721 Cogdill Road, Suite 302 Knoxville, TN 37932-3425 Phone: 865-223-6575 es.com if gy www.millerenergyr e5.com Investor Relations MZ Group - North America Derek Gradwell SVP, Natural Resources Phone: 512-270-6990 dgradwell@mzgroup.us www.mzgroup.us
Slide 20: Appendix
Energy Appendix
Slide 21: North Cook Inlet and Susitna
North Cook Inlet and Susitna Legend (cook inlet) Il veveloped acreage 25,548 Net Acres Exploratory Acreage hss Netaces Total acreage 589,203 Net Acres ‘Willow North Alexander rer O186n Creek 3 Mile Creek | ExenMobil _ West McArthur River Nikiski
Slide 22: South Cook Inlet
South Cook Inlet Legend (cook niet) I veveloped Acreage '589,203 Net Acres Anchor Point
Slide 23: North Slope
North Slope Legend (worth siope) North Slope BE deveopes acreage 91027 Neta Exploratory acreage 16,391 NetAcr Total Acreage 25,418 NetAcres Badami Unit and Pipeline aa Ll ; [PE Thomson Unit “To Prudhoe B:
Slide 24: » Miller
» Miller Energy
Slide 25: Hedging
Hedging WA Miller Energy Hedging Summary + Over 76% of current net oil production hedged Contract price currently $7.06/mef 1.8 BCF remaining as of December 2014 Current Hedge Summary 2500 104 Crude 102 Contract Volumes 2000 100 = (mbbis) gy ie = SNovt4-April'15_ Swap 389.6 $98.71 3 1000 co A Swap 7
Miller Energy Resources — Investor Presentation (December 2014) on 6ix