    JUNE 2026 QUARTERLY UPDATE ASX Code: AMI 20 July 2026

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation has been prepared by Aurelia Metals Limited (‘AMI’ or the ‘Company’). It should not By its very nature, production and exploration for gold and base metals is a high risk business and is not be considered as an offer or invitation to subscribe for or purc

  3. Slide 3: Highlights

    This quarter delivered gold production above the top end of revised higher guidance, strong base metals production, a signifi cant increase in operating cash flow and a strengthened balance sheet with $143.9M in net cash and $183.9M in total liquidity. HIGHLIGHTS Gold production exceeded revised hig

  4. Slide 4: Production and Costs

    PRODUCTION AND COSTS Gold production above revised higher guidance, all other metrics in line SepQ DecQ MarQ JunQ FY26 Gold Production (koz) Copper Production (kt) Measure Unit FY26 Revised FY26 FY26 FY26 FY26 Guidance 45 – 50 0.9 Gold produced koz 10.4 11.7 13.0 15.3 50.4 15.3 (prev 35-45) 13.0 11.

  5. Slide 5: Operating Performance

    OPERATING PERFORMANCE

  6. Slide 6: Peak

    PEAK Plant operating at record annualised throughput with recoveries maintained Mine development metres providing Maximising tonnes processed (kt) through the production flexibility Peak plant 230 1,547 1,528 1,379 1,359 191 197 187 1,041 175 888 151 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Mar 25

  7. Slide 7: Federation

    FEDERATION Mined tonnes and grade performing strongly Operating development supporting higher Ore mined (kt) ahead of plan for FY26 tonnages 108 112 1,481 1,417 1,449 1,336 76 1,134 63 877 53 34 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Qtr Qtr Qtr Qtr Qtr Q

  8. Slide 8: Growth Projects and Exploration

    GROWTH PROJECTS AND EXPLORATION

  9. Slide 9: Plant Upgrades

    PLANT UPGRADES Delivering 1.1-1.2Mtpa throughput capacity Tailings and Process Water Management • Improves copper and zinc recovery, reduces cyanide consumption New 22m tailings thickener now in operation at Peak (June 2026) • Thickener commissioned and commenced operation in June 2026 Concrete pour

  10. Slide 10: Great Cobar Copper Project

    GREAT COBAR COPPER PROJECT Development executing in line with budget and schedule to unlock Copper Resource Q4 H1 H2 H1 H2 FY26 FY27 FY27 FY28 FY28 Mine development of 438m completed Mine development in quarter Ventilation works Mine development of 1,823m Shaft raise bore completed to date Amenities

  11. Slide 11: New Occidental Tailings Project

    NEW OCCIDENTAL TAILINGS PROJECT Incremental low capital cost gold production – 32koz Au Historical Gold-Bearing Stockpiles • Pre-Feasibility Study and Maiden MROR released 16 June1 • Mineral Resource estimate of 2.6Mt @ 0.65g/t Au2 • To be processed through the Peak processing plant in addition to f

  12. Slide 12: Exploration Update

    EXPLORATION UPDATE Earn-in agreement with Legacy Minerals expands Cobar Basin footprint1 Highly prospective growth option • Earn-in tenements extend 78km along western boundary of Aurelia’s tenements • Provide access to the highly prospective structural corridor between the Myrt Fault and the CSA Fa

  13. Slide 13: Balance Sheet

    ite pe oe ee pag ‘ BALANCE SHEET 2a auretia “- “

  14. Slide 14: Cash Balance Materially Increased

    CASH BALANCE MATERIALLY INCREASED Substantial free cash flow generated and refinance completed Group Cash A$M1 40.0 183.9 Record quarterly cash flow from Cobar operations 53.1 36.2 143.9 (6.2) (14.7) (2.1) Precious metal sales represented 55% of total (13.4) revenue (3.8) 94.7 New low cost debt faci

  15. Slide 15: Key Focus Areas

    Safely prioritising the highest value production KEY FOCUS AREAS and cash flow outcomes Maximise cash flow generation and value Continue to lift Peak processing plant throughput Maintain strong mining performance at Federation Execute Peak Mining productivity improvement projects Deliver Great Cobar

  16. Slide 16: Contact

    CONTACT T: +61 7 3180 5000 E: office@aureliametals.com.au Level 10, 10 Felix Street BRISBANE QLD 4000 GPO Box 7 BRISBANE QLD 4001 aureliametals.com

  17. Slide 17: Appendix: New Occidental Mineral Resources Estimate

    APPENDIX 1 | NEW OCCIDENTAL MINERAL RESOURCES ESTIMATE New Occidental MRE reported by classification as at 30 April 2026 Tonnes Au Class (kt) (g/t) Indicated 2,300 0.66 Inferred 300 0.63 Total 2,600 0.65 Note: Values are reported to two significant figures which may result in rounding discrepancies