Slide 1: Agency Consultation Meeting – Oakdale West Estate
Agency Consultation Meeting Oakdale West Estate October 2020 1
Slide 2: Overview
Overview Welcome and Introductions Upcoming Development Applications and Modifications Project Update – OWE Project Update – WNSLR Project Update – Project Waratah Environmental Performance Safety Update Consultation and Community Interactions Stakeholder Feedback & Questions 2
Slide 3: Welcome and Introductions
Welcome and Introductions Project Team: Organisation Goodman AT&L SLR Consulting Ersed Role Proponent Project Manager & Contract Stakeholder Engagement Environmental Superintendent Representative Key Contacts Stephanie Partridge Alex Lohrisch Dan Thompson Carl Vincent Kym Dracopoulos Dane Segail Kat
Slide 4: Upcoming DAs and Modifications
Upcoming DAs and Modifications SSD 7348 (MOD 6) – Minor change to building layout on Precinct 3; – Increase in building height for Building 2A to 14.9m at the ridge (18m incl. plant and solar panels, up from 15m); – Minor changes in building form and layout of 2A & 2C-2E; – Construction of Estate Ro
Slide 5: Oakdale West Estate MOD 6
REFER TO DRAWING OAK MPO3 FOR CONTINUATION Oakdale West Estate MOD 6 ‘OAKDALE SOUTH Lot 12 0P 1178389 Emmaus Cathe KrarageR 04.00 eS global environmental and advisory solutions S R
Slide 6: Proposed Industrial Facility - 2A
0 tang a0 THY - _ £0 Peoy 298183 on Proposed Industrial Facility - 2A SLR® global environmental and advisory solutions
Slide 7: Development Area Schedule
joodmal \ poor = Road 03) I ' I ' \ 1 i 1 + \ 1 \ \ Precinct 4 | Facilit global environmental and advisory solutions ’ Development Area Schedule Site Area 37,370 sqm Warehouse 2c 5030 sam Warehouse 20 4630 sqm Warehouse 2E 5,000 sqm Ofce 2c (2levels) «300 sqm Office 20 (2levels) 300 sqm Office 2 (1
Slide 8: Emmaus Catholic College site plan
BRICKWORKS Emmaus Catholic College A global environmental and advisory solutions S L Re 8
Slide 9: Project Progress To Date - OWE
Project Progress To Date - OWE • Road 1 and Road 3 remain on programme and are targeted for completion this year. • The road basecourse has been completed and kerb installation has commenced • Utility installation within both road corridors is ongoing. • The retaining walls to the western boundary a
Slide 10: Nov/Dec Project Program – OWE
Nov/Dec Project Program – OWE • Noise Wall Completion The temporary noise blanket wall in Aged Care will be removed after that. • Road 1 and Road 3 footpaths • Continuation of utility construction • Asphalt to Road 1 and Road 3 10
Slide 11: Project Progress To Date - WNSLR
Project Progress To Date - WNSLR • The section of road From Lenore Drive to Lockwood Road is complete. • Handover of this section to the relevant authority is being finalised. • The bridge over the Water NSW corridor is nearing completion with the final concrete pour for the bridge deck being comple
Slide 12: Nov/Dec Project Program – WNSLR
Nov/Dec Project Program – WNSLR • Completion of Bridge Structure – Abutments and approach slabs. • The remaining road from Lockwood Road over the bridge into the site is on programme and being targeted for completion this year. • Over the next few weeks the road base course will be completed followe
Slide 13: Project Progress To Date – Project Waratah
Project Progress To Date – Project Waratah • Structural Steel Erection Progressing; • Wall Cladding Installation Progressing; • Roofing installation progressing; • Internal Concrete Pours have commenced; • External Hardstand Concrete Pours have commenced; • Precast Concrete Panel Installation is pro
Slide 14: Nov/Dec Project Program – Project Waratah
Nov/Dec Project Program – Project Waratah • Structural Steel Erection Progressing; • Wall Cladding Installation Progressing; • Roofing installation progressing; • Internal Concrete Pours progressing; • External Hardstand Concrete Pours progressing; • Precast Concrete Panel Installation progressing;
Slide 15: ER Inspections and Audits: SSD7348
ER INSPECTIONS AND AUDITS: SSD7348 ER INSPECTIONS 2019 TOTAL 3 2020 QTR1 (JAN-MARCH) 16 2020 QTR 2(APRIL-JUNE) 10 2020 QTR 3 (JULY-SEPT) 3+3+3 =9 OCTOBER (PART) 2 TOTAL TO DATE 40 Copyright © ErSed 2011
Slide 16: ER Inspections and Audits: SSD7348
ER INSPECTIONS AND AUDITS: SSD7348 ER AUDITS THIS PERIOD SEPT 20 • OWE (INFRASTUCTURE) ESCP and BASINS • WNSLR (sizing, flocculant use, management and record keeping) Copyright © ErSed 2011
Slide 17: Environmental Performance: SSD7348
ENVIRONMENTAL PERFORMANCE: SSD7348 NON COMPLIANCES, NON COMPLIANCE NIL Copyright © ErSed 2011
Slide 18: EC Inspections and Audits- SSD10397
EC INSPECTIONS AND AUDITS- SSD10397 INSPECTIONS AUDITS THIS PERIOD JULY 20 3 AUGUST 20 0 SEPTEMBER 20 1 OCTOBER 20 (PART) 1 TOTAL 4 Copyright © ErSed 2011
Slide 19: Environmental Performance- SSD10397
ENVIRONMENTAL PERFORMANCE- SSD10397 INCIDENTS AND COMPLAINTS AS DETAILED IN THE MONTLY REPORTS INCIDENTS JUNE -OCT NIL NON COMPLIANCES B13. THE APPLICANT MUST ENSURE: (B) CONSTRUCTION TRAFFIC DOES NOT USE BAKERS LANE DURING THE HOURS OF 8 AM – 9.30 AM AND 2.30 PM – 4 PM, MONDAY TO FRIDAY WHEN SCHOOL
Slide 20: Safety
Safety • No external safety incidents • Minor internal safety incidents – A Crane incident on the WNSLR Project occurred, with a truck cab being damaged by an object that was being lifted. 20
Slide 21: Consultation and Community Interactions
Consultation and Community Interactions • Manager of the Emmaus Retirement Village on behalf of Resident – Enquiry regarding television reception and potential interference from project. Further details now provided by the Village and investigation is underway. 21
Slide 22: Communications and Consultation Channels
Communications and Consultation Channels Sources of information and complaints/enquiries via: • Website: oakdaleopportunities.com • Email: community.oakdalewest@goodman.com • Phone: 1300 002 887 • Post: Level 17, 60 Castlereagh Street, Sydney, NSW 2000 • Community Meetings: Subject to scheduling • E
Slide 23: Stakeholder Feedback & Questions
Stakeholder Feedback & Questions 23