Boral Ltd.

Boral — Corporate Update (March 2022)

45 slides from Boral's corporate update, March 2022

  1. Slide 1: Community Consultative Committee Peppertree Quarry March 2022

    Click to edit Master title style Subheader Community Consultative Committee Peppertree Quarry March 2022

  2. Slide 2: Agenda

    AGENDA 1. Welcome and introductions 2. Confirmation of minutes and actions 3. Business arising 4. Correspondence 5. Operations over the last 3 months 6. Environmental performance a. Incidents b. Complaints c. Air d. Noise e. Blast f. Water – surface and ground g. Heritage h. Ecology 7. Stakeholder E

  3. Slide 3: Welcome and apologies

    01 Welcome and apologies

  4. Slide 4: Confirmation of minutes

    sa O2 Confirmation of minutes

  5. Slide 5: Business arising

    03 Business arising • Nature of the PM2.5 particles to be defined • Production 2020 versus production 2021 2020- 2 402 443 tonnes 2021- 2 359 000 tonnes

  6. Slide 6: Correspondence Dec 2021 – Mar 2022

    04 Correspondence Dec 2021 – Mar 2022

  7. Slide 7: Correspondence with regulators and council

    Department of Planning, Industry and Environment Management plan approval – Water Management Plan, Aboriginal Heritage Management Plan, Biodiversity and rehabilitation Management Plan, Construction Noise Management plan AEMR 2021 TSP HVAS failure DPE visit March EPA TSP HVAS failure Resource Regulat

  8. Slide 8: Operations Past 3 months

    05 Operations Past 3 months

  9. Slide 9: Operations in the past 3 months

    Safety Focus on new "life saving commitments" Overburden Pre works commenced. – contract in place with OB contractor – Coast Wide Pit Update Shut down over Christmas 23-12-2021 till the 10-01-2022, during this time we continued to complete maintenance. North conveyor built and now operational Proces

  10. Slide 10: Environmental Performance

    06 Environmental Performance

  11. Slide 11: Environmental Incidents Dec 2021 to March 2022

    Environmental Incidents Dec 2021 to March 2022 ˃ Dec- nil Jan – nil Feb- 1 (land slip behind TLO shed) Mar- 1 (land slip behind TLO shed) Peppertree Quarry CCC item 6 Environmental Performance 11

  12. Slide 12: Environmental Complaints Dec 2021 to March 2022

    Environmental Complaints Dec 2021to March 2022 ˃ Dec – 1 (Dust) Jan- nil Feb- nil Mar- nil Peppertree Quarry CCC item 6 Environmental Performance 12

  13. Slide 13: Air – Dust deposition Gauge D1

    Air – Dust deposition Gauge D1 Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 13

  14. Slide 14: Air – Dust Deposition Gauge D2

    Air – Dust Deposition Gauge D2 Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 14

  15. Slide 15: Air – Dust Deposition gauge D3

    Air – Dust Deposition gauge D3 Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 15

  16. Slide 16: Air – PM10 annual average

    Air – PM10 annual average Annual Average goal of 25ug/m3 In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 16

  17. Slide 17: Air – PM10 24 Hour performance

    Air – PM10 24 Hour performance 24 hour goal of 50ug/m3 In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 17

  18. Slide 18: Air – Total Suspended Particulates

    Air – Total Suspended Particulates Annual Average goal of 90ug/m3 In compliance Annual average below goal at the boundary Peppertree Quarry CCC item 6 Environmental Performance 18

  19. Slide 19: Air – PM2.5

    Air – PM2.5 In compliance for the past 3 months. Peppertree operations are NE of the PM2.5 gauge Peppertree Quarry CCC item 6 Environmental Performance 19

  20. Slide 20: Noise – quarterly monitoring

    Noise – quarterly monitoring Monitoring was undertaken over the 7th, 8th and 9th December 2021. 15th, 16th, and 17th March 2022 Results for the December round are in compliance. March results are pending, next round due in June. Peppertree Quarry CCC item 6 Environmental Performance 20

  21. Slide 21: Noise – quarterly monitoring

    Noise – quarterly monitoring Peppertree Quarry CCC item 6 Environmental Performance 21

  22. Slide 22: Noise – quarterly monitoring

    Noise – quarterly monitoring Peppertree Quarry CCC item 6 Environmental Performance 22

  23. Slide 23: Noise – quarterly monitoring – night time assessment

    Noise – quarterly monitoring – night time assessment Peppertree Quarry CCC item 6 Environmental Performance 23

  24. Slide 24: Blasting - Overpressure

    Blasting - Overpressure In Compliance Peppertree Quarry CCC item 6 Environmental Performance 24

  25. Slide 25: Blasting – ground Vibration

    Blasting – ground Vibration In Compliance Peppertree Quarry CCC item 6 Environmental Performance 25

  26. Slide 26: Surface Water

    Surface Water Quarterly monitoring round undertaken in January – March 2022 with sampling on Thursday 3rd March 2022 No issues with water supply or quality over the last 3 months Peppertree Quarry CCC item 6 Environmental Performance 26

  27. Slide 27: Surface water - pH

    Surface water - pH Within guideline for March samples 27

  28. Slide 28: Surface water - Turbidity

    Surface water - Turbidity Slightly above guideline for March samples Peppertree Quarry CCC item 6 Environmental Performance 28

  29. Slide 29: Surface water – Total dissolved solids

    Surface water – Total dissolved solids Below guideline for March samples Peppertree Quarry CCC item 6 Environmental Performance 29

  30. Slide 30: Surface water – total Phosphorus

    Surface water – total Phosphorus Above guideline for March samples Peppertree Quarry CCC item 6 Environmental Performance 30

  31. Slide 31: Surface water - Total Nitrogen

    Surface water - Total Nitrogen Above guideline for March samples Peppertree Quarry CCC item 6 Environmental Performance 31

  32. Slide 32: Environmental Flow

    Environmental Flow year total in flow 10% total out flow in compliance comment Feb-2021 21 2.1 44.59 yes Mar-2021 38 3.8 833 yes Rainfall - possible overflow of the V notch weir Apr-2021 2 0.2 8.47 yes May-2021 30.5 3 433 yes Rainfall - possible overflow of the V notch weir Jun-2021 9 0.9 6.5 yes Ju

  33. Slide 33: Ground water

    Ground water ˃ Monitoring conducted in December 2021 and March 2022. ˃ Results show no changes to the groundwater ˃ Review of the existing wells was undertaken and advice now provided on replacement wells and locations Peppertree Quarry CCC item 6 Environmental Performance 33

  34. Slide 34: Ground water – water levels

    Ground water – water levels Peppertree Quarry CCC item 6 Environmental Performance 34

  35. Slide 35: Heritage

    Heritage Collation of Artefacts has been postponed for a short period due to the availability of the archaeologist Planning is progressing to Return some Artefacts to country by June 2022. Reconciliation week community workshops being developed Scar tree relocation being planned, currently undercove

  36. Slide 36: Ecology

    Ecology Three year plan developed for ongoing rehabilitation and maintenance Rapid Visual assessment conducted Thursday 21st October. Identified some areas of work for erosion control and pest management (weed and feral animals) Monitoring plan has been revised Implementation plan has been drafted a

  37. Slide 37: Stakeholder Engagement

    07 Stakeholder Engagement

  38. Slide 38: National Reconciliation Week community workshops – May

    Marulan Christmas fair- 23rd December. We held a guessing competition and handed out chocolate rocks to the local children Goulburn Community Bike ride postponed due to COVID Tallong Apple day in May- planning happening National Reconciliation Week community workshops – May Peppertree Quarry CCC ite

  39. Slide 39: Operations Next 3 months

    os | Operations Next 3 months

  40. Slide 40: Operations in the next 3 months

    Safety Focus on the "life saving commitments" Overburden Pre works to continue. Aim to start moving overburden in the coming weeks. U turn bay works commenced Pit Update New Conveyor installed down the north ramp into the RL525 area Processing (STQ) Continue to supply aggregates and sand to Sydney m

  41. Slide 41: General Business

    09 General Business

  42. Slide 42: Marulan South State Significant Development

    Marulan South State Significant Development conditions of consent have been issued It has been agreed that a joint CCC will be established Process is to advise and seek DPIE approval The Chair to seek nominations for representatives The Chair to advise an seek approval from DPIE on the selection of

  43. Slide 43: Other

    Other Peppertree Quarry CCC item 9 General Business 43

  44. Slide 44: Next meeting

    Next meeting June 2022 BCRAL

  45. Slide 45: Thanks for your participation

    Thanks for your participation 45